ArxBridge
Fire Door Regulations for Airports Explained
Fire door regulations for airport terminals, concourses and back-of-house areas: FD30 and FD60 periods, escape hardware, inspection duties and the order.
- ✓Third-party test evidence with every product
- ✓Written specification you can issue to tender
- ✓Supplied and installed across the UK
Get a free project quote
Rating, written specification and budget range within one working day.
Confidential. No cost, no obligation.
Third-party tested
Evidence with every quote
UK manufactured
Made to your sizes
One accountable team
Specify, supply, install
Confidential handling
Details never shared
An airport buyer should start from the fire strategy, not the catalogue. A fire rated doorset suits every escape route, a glazed screen needs its rating on the glass as well as the door, and a door that guards a plant room needs a fire rating beside its security rating.
An airport holds terminals, concourses, back-of-house areas and support buildings, and each kind of space asks a different question of its doors. A terminal entrance must admit a crowd and release it in one action. A concourse door must hold fire while crowds pass it every day. A back-of-house door must resist a forced entry and still open fast for the staff who use it. Our transport hubs sector page covers the buildings that hold the traffic, and our transport hub security requirements guide works through the security side of the same estate.
The answer is a door schedule with one line per opening. Each line names the building, the position, the fire rating, the security rating where one is needed, and the leaf, the frame, the glass, the seals and the hardware as one doorset. The fire strategy names the period for each opening, and the schedule follows it line by line. Our fire door regulations for commercial buildings guide sets out the same discipline for a building that is not an airport.
- FD30 / FD60Fire resistance periods tested to EN 1634-1
- BS EN 1125Panic hardware, bar across 60 percent of leaf width
- BS EN 1154Closer power sizes, minimum EN 3 on fire doors
- Martyn’s LawTiers for premises holding 200 or more people
Terminals, concourses and back of house: where the fire doors sit
A terminal entrance is the door the public meets first, and it must admit a crowd at peak time and release it in one action when the alarm sounds. A concourse door sits between spaces that hold crowds, and it must hold fire and smoke while people move through it in both directions. A back-of-house door serves the rooms behind the public areas: plant rooms, baggage areas, stores and service corridors. Each kind of door carries a different fire period, a different set of hardware and a different inspection routine, and the schedule should name all three for each opening.
Walk the escape route before ordering, from the deepest public space to the final exit. Note every door on that route, the direction it opens, the hardware it carries and the fire period the strategy asks for. A door that opens against the flow of escape is a door that will slow the crowd, and a door that needs a key or a code to open from the inside is a door that has no place on an escape route. Our fire door regulations for schools guide works through the same walk for a building full of children, and our fire door regulations for offices guide does the same for a building full of staff.
The support buildings need the same treatment as the terminal. A maintenance building, a stores building and a plant building each hold their own fire risk, and the doors between them and the terminal carry the same duty as the doors inside the terminal. A rated leaf in an unrated wall gives an unrated opening, whatever the leaf itself can do, and a frame fixed into a partition that was never built to hold it will move when the door is used.
What the fire strategy asks of every airport door
The fire strategy is the document that decides what each door must do. It names the fire period for each opening, the escape routes the doors serve and the smoke control the building needs. A door that is ordered without the strategy is a door ordered on a guess, and a guess is the wrong basis for a door that must hold fire while a crowd leaves the building. Ask for the strategy before the schedule is written, not after the doors are ordered.
Compartmentation is the idea behind the strategy. The building is divided into compartments, and each door in a compartment wall must hold fire for the period the strategy names. A door that holds fire for 30 minutes in a wall that must hold for 60 minutes is a door that fails the compartment, and a door that holds for 60 minutes in a wall that needs 30 minutes is a door that costs more than the opening asks for. The rating should follow the strategy, not the catalogue. Our fire door regulations for hospitals guide works through the same discipline for a building where people cannot leave on their own, and our fire door regulations for retail guide does the same for a building full of shoppers.
The rating belongs to the complete tested assembly, not to the leaf alone. A rated leaf in an untested frame is not a rated doorset, and a change to the leaf, the frame, the glass, the seals or the hardware can break the tested construction. Ask for the test report and the classification naming the exact doorset before the order is placed, and file both with the order. Our dual certification guide works through how fire and security sit on one assembly, and our how to specify security doors guide covers the same discipline column by column.
FD30 and FD60 on a terminal: matching the period to the opening
FD30 and FD60 are fire resistance periods tested to EN 1634-1, and the number is the minutes the doorset holds its rating in the furnace test. A door marked FD30 carries 30 minutes of integrity, and a door marked FD60 carries 60 minutes. A door marked FD30S carries 30 minutes of integrity plus smoke control, tested to BS EN 1634-3. The fire strategy names the period for each opening, and the schedule follows it line by line.
EI adds an insulation limit on temperature rise on the safe side, an average of 140 degrees Celsius and a maximum of 180 degrees Celsius. A door that carries an EI rating limits the heat that passes to the safe side, and the fire strategy names it where the escape route runs close to the fire side of the door. The glass must carry the same fire rating as the leaf where the fire strategy asks for it, with beads and seals tested as part of the doorset. Our fire rated windows guide sets out how glass, frame and beads are tested together.
Which openings take which period is a question for the fire strategy, not for this guide. An escape route door, a plant room door and a stores door can each carry a different period in the same building, and the period follows the compartment the door sits in. A door that guards a plant room may need FD60 where a corridor door needs FD30, and a door that separates two compartments may need a longer period than a door that opens onto the final exit. Read the strategy, name the period on the schedule, and order the evidence with the doors.
Check-in halls and security lanes: the doors behind the queues
A terminal never empties, and the fire doors on its escape routes never get a quiet hour. Passengers queue at check-in, at security and at the gates, and the doors behind those queues must open under the weight of a crowd and close again behind the last person through. A door that sticks, a door that opens the wrong way or a door that needs a key stops the route, and a stopped route in a full terminal is the failure the regulations exist to prevent.
The fire strategy sets the period for each opening, and the period follows the risk behind the door. A door on an escape route from a check-in hall usually takes FD30, a door on a compartment line between a terminal and a baggage hall usually takes FD60, and a door to a plant room or a fuel store takes FD60, because the fire load behind it is higher. Read the period off the EN 1634-1 furnace test: E for integrity, EW for integrity with limited radiation, and EI for integrity with insulation, from 30 minutes up to 120, and the EI figure caps the heat on the safe side at 140 degrees Celsius on average and 180 at the hottest point.
Smoke gets to a corridor ahead of flame, so a door on a smoke path needs a seal next to its period. FD30S joins 30 minutes of integrity to a smoke seal proved to BS EN 1634-3, to Sa or S200. Keep the gaps at 4 mm, because the seal only works where the gap is right, and intumescent seals swell at roughly 200 to 250 degrees to shut the gap as heat arrives. What each letter and number means is set out in our fire ratings guide.
The period that follows the risk, not the terminal
On the doors that release a crowd, the panic hardware must suit the door it sits on. A bar that spans less than 60 percent of the leaf leaves part of the crowd pushing on bare metal, and a bar fitted to a leaf never tested with it leaves the doorset with no proven rating. BS 8300 and Approved Document M cap the opening force at below 30 N through the first 30 degrees and below 22.5 N after that, so a closer set too strong for the leaf puts the door outside the access rules. The power sizes and the adjustments that keep a closer inside the rules are listed in our fire door closers guide.
Terminals fall under Martyn’s Law, which sets duties by how many people a premises holds, starting at 200. Premises holding 200 to 799 people sit in the standard tier, and premises holding 800 or more sit in the enhanced tier, so a terminal sits in the enhanced tier. Royal Assent came in April 2025, go-live is expected in spring 2027, at least 24 months after Royal Assent, and the Security Industry Authority regulates the scheme. The tiers and what each one asks of a building are set out in our Martyn’s Law guide.
| Position | Door | Period |
|---|---|---|
| Check-in hall escape route | Escape door | FD30 |
| Terminal to baggage hall | Compartment door | FD60 |
| Plant room or fuel store | Internal door | FD60 |
| Service corridor cross-corridor | Smoke control door | FD30S |
Put the test report, the classification and the hardware schedule on file the day the doors arrive, and name the inspection routine the estate will follow, so the record holds for the whole life of the building. The checks that catch a failing leaf are in our fire door inspection checklist.
Escape routes that never close: panic hardware and opening force
An escape door must open in one action, in the direction of escape, without a key and without a code. Panic hardware to BS EN 1125 belongs on these doors, with a bar across the leaf covering at least 60 percent of the leaf width, on doors that serve more than 60 people. A bar that covers less than 60 percent of the leaf is a bar that a person in a crowd may miss, and a door that needs a key to open from the inside is a door that has no place on an escape route. Test the release at every inspection, with the power off where the door carries an electric release.
A door must open with less than 30 N in the first 30 degrees and less than 22.5 N beyond that, under BS 8300 and Approved Document M. A closer that is too strong for the leaf makes the door fail the access rules, and a closer that is too weak lets the door stand open when it should be shut. The minimum power size on a fire door is EN 3, under BS EN 1154, and the closer should bring the leaf back and hold the latch every time, without a slam and without stopping short. Our fire door closers guide sets out the power sizes in BS EN 1154, and our fire door hardware guide works through the hinges, locks and seals that carry the leaf.
A hold-open device to BS EN 1155 lets a door stand open for use and releases it when the alarm sounds, so test the release at every inspection. A wedge has no such release, and a door held open by one will stand open in a fire. A door that does not close has no fire performance and no security performance, whatever its certificate says. Hinges to BS EN 1935 carry the leaf, grade 13 or grade 14, and a hinge that has dropped lets the leaf sag, so the closer cannot close it squarely.
Glazing, screens and smoke control on a concourse
A concourse is a space of glass and open sightlines, and the screens that divide it must carry a fire rating on the glass as well as on the door. A rated door in an unrated screen is an opening with a glass-shaped hole in it, and a screen that is not rated is a screen that fails at the first blow of heat. The glass, the frame and the beads are tested together as one assembly, and the rating belongs to the whole screen, not to the glass alone. A vision panel lets staff see who is on the other side before opening the door, and the glass in the panel must carry the same fire rating as the leaf where the fire strategy asks for it.
Smoke control is a separate duty from fire resistance, and a fire rating on its own does not prove smoke control. A door marked FD30S carries 30 minutes of integrity plus smoke control, tested to BS EN 1634-3, and the smoke rating matters because smoke passes through a cold gap long before heat reaches the seals. Check the gaps and the seals on the same visit: a 4 mm gap around the leaf is the usual limit, and intumescent seals close the gap in a fire by expanding at roughly 200 to 250 degrees. Ask for the smoke evidence by name where the fire strategy asks for it.
Smoke moves through a building faster than fire, and the doors on a concourse are the lines that slow it. A door that is wedged open lets smoke through before the alarm has finished sounding, and a door with a broken seal lets smoke through a gap the eye cannot see. Keep the seals in place, keep the gaps inside the limit, and keep the doors closed when they are not in use. The inspection routine should check every seal and every gap, not only the doors that look worn.
Back-of-house doors: plant rooms, baggage areas and service corridors
A plant room door must hold fire and resist a forced entry, and the two jobs need two sets of evidence on one assembly. The fire classification comes from a test to EN 1634-1, and the forced entry rating comes from a test to LPS 1175 or PAS 24. A server room door and a plant room door each need both sets of evidence on the same construction, and a change to the leaf, the frame, the glass, the seals or the hardware can break the tested construction. Ask for the evidence when a change is proposed, not after it is made.
Baggage areas and service corridors need doors that take daily use and resist a forced entry from a quiet approach. A personnel door on a baggage area opens for every shift change, and a door that is specified for a quiet office will not last on a service floor. Steel carries the use: a steel leaf resists the knocks a service door takes every day, a trolley, a pallet, a boot, a crate. A steel leaf is strong, but strength is not a security rating, and the rating belongs to the complete tested assembly. Our warehouse security doors guide covers the doors service buildings need most, and our loading bay doors guide covers the bay doors in full.
LPS 1175 rates a doorset by the tools and the time it resists. B3 is three minutes against category B tools, screwdrivers, pliers and hand saws. C5 is five minutes against category C tools, crowbars, drills and chisels. D10 is ten minutes against category D tools, sledgehammers, disc cutters and jigsaws. SR2 is the old name for B3, SR3 is the old name for C5, and SR4 is the old name for D10. PAS 24 is the enhanced security standard for doorsets, and EN 1627 sets resistance classes RC1 to RC6. Secured by Design is a scheme, not a rating, and a door that carries the scheme mark without a test rating has no proven resistance behind it. Our SR2 vs SR3 vs SR4 guide works through the three ratings buyers meet most often, and our LPS 1175 vs PAS 24 guide compares the two routes side by side.
Inspection, records and the responsible person on an airport estate
A fire door is only as good as its last inspection. The routine should check the gaps around the leaf, the seals, the closer, the hinges and the hardware on every door, and it should check the doors that look fine as well as the doors that look worn. A closer that has lost its power, a seal that has come away from its groove and a hinge that has dropped will each let a door fail, and none of them shows from the front of the leaf. Our fire door inspection checklist gives the checks that catch a failing leaf before it matters.
The records belong with the doors. The test report, the classification and the hardware schedule should name the exact doorset, and the inspection log should name the date, the door and the person who checked it. A building that can show its checks, its faults and its fixes has a maintenance system behind its doors, and a building that cannot show them has a gap no certificate can fill. File the evidence on the day the doors arrive, and keep the inspection log where the next responsible person will find it. Our guide to keeping an LPS 1175 rating valid sets out the changes that void a rating after handover.
Premises that hold crowds face duties under Martyn’s Law, which sets tiers for premises that hold 200 or more people, with a lower tier for premises holding 200 to 799 people and a higher tier for premises holding 800 or more. Royal Assent came in April 2025, and go-live is expected in spring 2027. An airport estate holds crowds every day, so the doors that release for escape and the routes they serve sit inside those duties. Our Martyn’s Law guide for premises sets out the tiers and what they ask of a building.
Ordering for an airport site: what the enquiry should name
Ordering doors for an airport site is a specification exercise, not a shopping exercise. The enquiry should name the building, the position, the fire rating, the security rating where one is needed, and the leaf, the frame, the glass, the beads, the seals and the hardware as one doorset. The fire side needs its own evidence where the door must hold fire, and the security side needs its own evidence where the door must also resist attack. Where the site needs gates as well as doors, the enquiry should name the gate type, the width and the impact rating where one is needed. Our how to specify security doors guide covers the same discipline column by column.
Order the evidence with the doors. The test report, the classification and the hardware schedule should arrive with the doorset, and the handover pack should name the inspection routine the site will follow. A site that files the evidence on the day the doors arrive has a record it can use for the whole life of the estate. Write the schedule first, then order against it. Our security door cost factors guide covers the factors behind a quote, and our security turnstiles guide works through the lanes that move a crowd through a terminal entrance.
| Terminal area | Door position | Rating | What to check |
|---|---|---|---|
| Terminal entrance | Public entrance and escape doors | FD30 or FD60 | Panic hardware, opening force |
| Concourse | Glazed screens and doors | FD30S where smoke control is needed | Glass rating, seals, gaps |
| Plant room | Internal fire and security doors | FD60, LPS 1175 where rated | Seals, gaps, self-closing |
| Baggage area | Personnel and service doors | LPS 1175 where rated | Steel leaf, hinges, latch |
| Service corridor | Corridor and stores doors | FD30 or FD60 | Closer, latch, hold-open release |
On an airport estate, the door that suits a terminal entrance does not suit a plant room, and a schedule that names one door for every opening will fail in both.
What fire rating do airport terminal doors need?
The fire strategy names the period for each opening, and FD30 and FD60 are the periods most openings carry. An escape route door, a plant room door and a stores door can each carry a different period in the same building, so read the strategy and name the period on the schedule.
Can one doorset carry a fire rating and a security rating?
Yes, where one construction carries both proofs. The fire classification comes from EN 1634-1 and the forced entry rating from LPS 1175 or PAS 24, and both must be proved on the doorset that will be fitted.
What opening force must an airport fire door meet?
Less than 30 N in the first 30 degrees and less than 22.5 N beyond that, under BS 8300 and Approved Document M. A closer that is too strong for the leaf makes the door fail the access rules.
How often should airport fire doors be inspected?
On a routine the responsible person sets, covering the gaps, the seals, the closer, the hinges and the hardware on every door. File the inspection log with the test report and the hardware schedule, so the next responsible person can find it.
Do Martyn’s Law duties change what an airport door must do?
Martyn’s Law sets tiers for premises that hold 200 or more people, with Royal Assent in April 2025 and go-live expected in spring 2027. The doors that release for escape sit inside those duties, so they must open in one action, in the direction of escape, without a key.
Get a free quote
Related
More in guides for specifiers
Products
One supplier for the whole building envelope
Ready to specify your project?
Free assessment, written specification and test evidence. Reply within one working day.