A gate, shutter or bollard line may need permission, depending on height, listing and the highway. This guide sets out the checks the official pages ask for.

  • ✓Third-party test evidence with every product
  • ✓Written specification you can issue to tender
  • ✓Supplied and installed across the UK
Prefer to talk?+44 7352 267239

Get a free project quote

Rating, written specification and budget range within one working day.

ArxBridge Quote Form

Confidential. No cost, no obligation.

Third-party tested

Evidence with every quote

UK manufactured

Made to your sizes

One accountable team

Specify, supply, install

Confidential handling

Details never shared

A gate, a shutter or a line of bollards can change the look of a commercial frontage, and the planning rules treat each one differently. A gate inside the height limits may need no application, while a shutter on the same frontage may need one. This guide sets out the checks the official pages ask for.

  • Height limits1 m by a highway, 2 m elsewhere
  • Listed buildingsConsent and permission
  • Conservation areasTaking a boundary down
  • HighwayAgreement for bollards

What counts as development

Section 55 of the Town and Country Planning Act 1990 defines development as building, engineering, mining or other operations in, on, over or under land, or a material change in the use of a building or other land. Building operations include construction, structural alterations and most demolition. Section 57 says planning permission is required for any development of land.

Two exceptions matter for a buyer. The gov.uk guidance page “When is permission required?” names building operations that leave the outside of the building looking as it did, and alterations inside the building except for a mezzanine floor adding more than 200 square metres of retail floorspace. A gate, fence, wall or shutter is a structure, so the question is whether the work falls in one of those exceptions or needs permission.

The permitted development route for gates, fences and walls

Schedule 2 Part 2 Class A of the Town and Country Planning (General Permitted Development) (England) Order 2015 grants planning permission for the erection, construction, maintenance, improvement or alteration of a gate, a fence, a wall or any other means of enclosure. The Planning Portal page on fences, gates and garden walls sets out the conditions that must all be met.

No application is needed where the gate, fence or wall is next to a highway used by vehicles, or its footpath, and is not over 1 metre high, or is not over 2 metres high elsewhere. The height of an existing line already over those heights must not be increased. At a school next to a highway the limit is 2 metres, provided no part over 1 metre obstructs the view of highway users so as to be likely to cause danger.

The route stops at a listed building. Development is not permitted within the curtilage of a listed building, or to a gate, fence or wall surrounding one. Permitted development rights can also be removed by an Article 4 direction or a planning condition, so a right that applies on one site may not apply on the next.

Need this specified for your project?Free rating, written specification and budget range within one working day.
Get a free quote

Shutters sit outside the permitted development route

Class A names gates, fences, walls and other means of enclosure. It does not name a shutter. A shutter fixed to the outside of a building changes the frontage, so the local planning authority decides. For the security side of a shutter, the roller shutter regulations guide is the place to look.

Ask the authority before the shutter is ordered. A refusal after the shutter is fitted leaves the buyer with a shutter that must come down, and enforcement can follow work done without permission. The security shutters versus grilles guide compares the two products, and the permission question is the same for either one.

A shutter fitted after a break-in still needs the same permission check as a new one. The forced entry guide walks through the checks that follow an attack. The replacement guide covers a door changed while the building stays in use.

Listed buildings and listed building consent

Section 7 of the Planning (Listed Buildings and Conservation Areas) Act 1990 says no person shall execute works for the demolition of a listed building, or its alteration or extension in any manner which would affect its character as a building of special architectural or historic interest, unless the works are authorised. Section 8 says works are authorised where written consent has been granted by the local planning authority or the Secretary of State.

Listed status can create a need for planning permission where none would ordinarily arise. The Planning Portal guidance on listed building consent says the controls apply to demolition, alteration or extension likely to affect the character of a listed building, and it gives the erection of a means of enclosure as an example. A gate, fence or wall in the grounds of a listed building needs consent even where the same work on an unlisted site would not.

A job can need one consent, the other, or both. The listed building fire doors guide deals with the consent question for fire doors in a listed building.

Conservation areas and taking a boundary down

In a conservation area, taking a boundary down can need permission even where putting one up would not. The Planning Portal page on conservation areas says planning permission is needed to demolish a building of 115 cubic metres or more, or any gate, fence or wall 1 metre or more next to a highway, a public footpath or bridleway, a waterway or an open space, or 2 metres or more elsewhere.

The gov.uk guidance page adds that a building of 50 cubic metres or less can be demolished without permission, and that a gate, fence or wall under 1 metre next to a highway, waterway or open space, or under 2 metres elsewhere, is permitted development under Part 11 of Schedule 2 to the 2015 Order. Outside a conservation area, the demolition of any gate, fence or wall needs no application.

The pedestrian gates guide covers the product side of a gate, and the security fencing guide covers the product side of a fence.

Bollards on or next to the highway

A bollard set into the public highway needs the highway authority to agree before it goes in, and the planning question is a separate one. The bollard regulations guide sets out the highway side, including the anti-terrorism traffic regulation order.

A bollard line next to a highway used by vehicles is inside the limits at 1 metre, and elsewhere at 2 metres, but a bollard on the highway itself needs the highway authority’s agreement first. The anti-ram gates and barriers guide deals with barriers that stop a vehicle. The hvm planters and street furniture guide deals with protection that blends in.

How to get the answer before you order

Run the checks in order. First, measure the height against the 1 metre and 2 metre limits. Second, check whether the site is a listed building or in its curtilage. Third, check whether the site is in a conservation area and whether a boundary is coming down. Fourth, check whether the line sits on or next to a highway, and whether the permitted development rights have been removed.

Ask the local planning authority first, and ask the highway authority where a bollard or a gate meets the highway. Where the answer is not clear, a certificate of lawful development settles it formally. The CDM duties guide sets out who must do what when the work is fitted, and the Regulation 38 guide sets out the fire safety information handed over with a fire-rated doorset.

Product Permission route Check first
Gate or fence next to a highway Permitted development to 1 m Measure from ground level
Gate or fence elsewhere Permitted development to 2 m Check the height of any existing line
External shutter No Class A route; local planning authority decides Ask before ordering
Bollard on the highway Highway authority agreement, then the planning question Ask the highway authority first
Listed building Listed building consent, plus planning permission where it applies Ask the local planning authority

The heights are the easy check. The listing, the conservation area and the highway are the ones that catch a job out.

Does a gate need planning permission?

A gate up to 1 metre high beside a highway used by vehicles, or up to 2 metres high elsewhere, is permitted development under Class A, unless the site is a listed building or the permitted development rights have been removed. Above those heights, or on a listed site, an application is needed.

Does a security shutter need planning permission?

Class A does not name a shutter, so there is no permitted development route for one. The local planning authority decides, and the buyer should ask before ordering.

What happens if a boundary fence in a conservation area needs replacing?

Removing a boundary in a conservation area can need permission where putting one up would not. A gate, fence or wall of 1 metre or more beside a highway, waterway or open space needs permission to come down, and the limit is 2 metres elsewhere. Check with the local planning authority first.

What is Class A permitted development?

Class A is the part of the General Permitted Development Order that grants planning permission for a gate, fence, wall or other means of enclosure, subject to the height limits and the listed building exclusion.

Who decides whether a bollard needs permission?

The highway authority decides anything placed on the public highway, and the local planning authority decides the planning question. A bollard on private land beside the highway is judged differently, so ask both where the line is not clear.

Planning a shutter, gate or bollard line?Tell us the site, the height, and whether it is listed or in a conservation area.
Contact us for a free quote

Related

More in guides for specifiers

10 mistakes when specifying certified security doors 10 steps to specify an LPS 1175 door Acceptance and Snagging of a Security Door or Barrier Job Access Control Doors Acoustic Doors: Ratings and Specification After a Forced Entry Attempt: Checking a Security Door Airport Security Doors Anti-Ligature Doors for Mental Health Wards Anti-Ram Bollards Anti-ram gates and barriers: protecting vehicle entrances Arcade Security Doors Explained Automatic Doors Automatic Gates Cost Factors Automatic Vehicle Barriers Ballistic Panels Bank Security Doors Bingo Hall Security Doors Explained Blast doors: glazed vs solid and how they are rated Blast protection window film: what it does and what it cannot do Blast resistant windows: what drives the cost and how to specify them Bollard Cost Factors Explained Bollard regulations in the UK: spacing, height and depth Bookmaker Security Doors Explained Builders Merchant Security Doors Bullet Resistant Glass Cost Factors Bullet resistant glass ratings explained: BR1 to BR7 and SG classes Bullet resistant vs bulletproof glass: what the difference means Buying Security Doors and HVM Through Public Frameworks Car Park Security Doors Explained Car Showroom Security Doors Casino Security Doors Explained CDM 2015 Duties When Security Doors, Shutters or HVM Are Installed Cinema Security Doors Cleanroom Doors Cold Store Doors College Security Doors Commissioning, Handover and the O&M Manual for Security Doors and HVM Communal entrance doors for flats: Secured by Design and what to specify Community Centre Security Doors Control Room Doors Court Security Doors Crash Rated Fences and HVM Fencing Explained Data centre physical security: doors, glazing, HVM and shielding by zone Dental Practice Security Doors Depot Security Doors Explained Door Entry Systems Due Diligence When Selecting Vehicle Security Barriers Emergency Exit Doors EMP Shielding Cost Factors Explained Exhibition Centre Fire Door Rules Exhibition Centre Security Doors Factory Security Doors Faraday cage vs RF shielded room: what a business needs FB4 vs FB6 vs FB7: how to choose a ballistic rating Fire and security doors: how dual certification works Fire Compartmentation Fire Curtains Fire Door Certification Fire Door Closers Explained Fire Door Cost Factors Fire Door Duties of the Accountable Person Fire Door Gaps Fire Door Hardware Explained Fire door inspection checklist for steel and timber doors Fire Door Maintenance Fire Door Regulations Care Homes Fire Door Regulations for A and E Departments Fire Door Regulations for Airports Explained Fire Door Regulations for Bowls Clubs Fire door regulations for commercial buildings in the UK Fire Door Regulations for Dialysis Centres Fire Door Regulations for Hockey Clubs Fire Door Regulations for Hospitals Explained Fire Door Regulations for Offices Explained Fire Door Regulations for Operating Theatres Fire Door Regulations for Retail Explained Fire Door Regulations for Schools Explained Fire Door Regulations for Snooker Clubs Fire Door Regulations for Stadiums Fire Door Regulations for Student Accommodation Fire Door Regulations for Warehouses Fire Door Regulations Leisure Centres Fire Door Regulations Restaurants Fire Door Remediation Programme for Housing Providers Fire Door Rules for Badminton Clubs Fire Door Rules for Bingo Halls Fire Door Rules for Bookmakers Fire Door Rules for Bowling Alleys Fire Door Rules for Car Parks Fire Door Rules for Car Showrooms Fire Door Rules for Cinemas Fire Door Rules for Climbing Centres Fire Door Rules for Colleges Fire Door Rules for Community Centres Fire Door Rules for Cricket Clubs Fire Door Rules for Dental Practices Fire Door Rules for Depots Explained Fire Door Rules for Golf Clubs Fire Door Rules for GP Surgeries Fire Door Rules for Gyms Explained Fire Door Rules for Ice Rinks Fire Door Rules for Maternity Units Fire Door Rules for Mental Health Units Fire Door Rules for Museums Fire Door Rules for Oncology Units Fire Door Rules for Opticians Fire Door Rules for Pawnbrokers Fire Door Rules for Petrol Stations Fire Door Rules for Pharmacies Fire Door Rules for Ports Fire Door Rules for Post Offices Fire Door Rules for Prisons Fire Door Rules for Rehabilitation Centres Fire Door Rules for Self Storage Fire Door Rules for Shopping Centres Fire Door Rules for Squash Clubs Fire Door Rules for Supermarkets Fire Door Rules for Swimming Pools Fire Door Rules for Tennis Clubs Fire Door Rules for Theatres Fire Door Rules for UK Arcades Fire Door Rules for UK Casinos Fire Door Rules for UK Hospices Fire Door Rules for Walk-in Centres Fire Door Signage Fire Door Vision Panels Fire Doors and Gateway 2 in Higher-Risk Buildings Fire Rated Glass Cost Explained Fire Rated Sliding Doors Explained Fire Rated Windows Cost Factors Fire Rated Windows Explained Fire Safety Enforcement Notices and Fire Doors: What the Responsible Person Must Do Flat Entrance Doors: PAS 24 and Fire Rated Forced Entry vs Ballistic vs Blast: Which Rating a Site Needs Garage Security Doors Explained Gate Automation Explained Golden Thread Records for Fire Doors GP Surgery Security Doors Explained Gym Security Doors Explained High Speed Doors HMO Fire Doors Hospice Security Doors Explained Hospital Security Doors: Wards, A&E, Plant Hospital Security Gates Hotel Fire Doors Hotel Security Doors How to choose HVM bollards: fixed, shallow mount, removable and automatic How to keep an LPS 1175 door rating valid after installation How to Specify Fire Doors in a Housing Tender How to specify security doors: a checklist for architects How to Verify a Secured by Design Listing How to Verify an LPS 1175 Certificate on Red Book Live How to Write an Operational Requirement for Physical Security HVM planters and street furniture: protection that blends in In-Service Care of Vehicle Security Barriers Installation Handover: LPS 1175 Doors and PAS 68 Barriers Intumescent Seals ISO 16933 explained: EXV and SB classes and hazard ratings ISO 22343 vehicle security barriers explained Keeping a Dual-Certified Fire and Security Door Valid in Service Laboratory Security Doors Layered Security for a Site: Deter, Detect, Delay, Mitigate, Respond Lead Times and Programme Risks for LPS 1175 Doors Leisure Centre Security Doors Library Security Doors Listed Building Fire Doors Loading Bay Doors Explained Lockdown and Access Control Hardware on an LPS 1175 Door LPS 1175 Gates and Grilles Explained LPS 1175 Issue 8 explained: from SR1 to SR8 to A1 to H20 LPS 1175 Roller Shutters LPS 1175 vs ASTM F2781 and Other US Ratings Explained LPS 1175 vs EN 1627: how UK and European burglar resistance ratings compare LPS 1175 vs PAS 24: which security standard does your door need? LPS 1175 Windows and Walling Explained Martyn’s Law and Places of Worship: What a Buyer Checks for Doors and Entry Control Martyn’s Law Enhanced Tier: Physical Measures and the Specifier Brief Martyn’s Law Standard Tier: Procedures, Doors and Shutters Martyn’s Law Timeline and the SIA Regulator Martyn’s Law: what premises must do and which physical measures to consider Master Key Systems MRI and RF shielded rooms: how they work and what to specify Museum Security Doors NPSA Catalogue of Security Equipment (CSE) Explained NPSA Forced Entry and Blast Guidance for Government Sites NPSA Guidance on Lockdown and Marauding Attack: What It Asks of Doors and Entrances Office Security Doors Optician Security Doors Explained Panic Hardware PAS 24 requirements for doors and windows explained PAS 68 Bollard Foundations Explained PAS 68 bollards: ratings, spacing and cost factors PAS 68 vs IWA 14 vs ISO 22343: hostile vehicle mitigation standards explained Pawnbroker Security Doors Explained Pedestrian Gates Petrol Station Security Doors Pharmacy Security Doors Plant room doors: fire, security and ventilation requirements Plant Room Fire Doors Port Security Doors Post Office Security Doors Explained Powder coating vs galvanising vs paint for steel Preliminary Market Engagement for Security Doors and HVM Prison Security Doors Programming a Security Door and Barrier Package on a Live Site Public-Sector Tender Response Checklist for Security Door and HVM Supply Reading a PAS 24 and SBD Door Test Report Regulation 38 Fire Safety Information at Handover for Fire-Rated Security Doorsets Replacing Security Doors in an Occupied Building Restaurant Security Doors Retail Security Doors Revolving Doors RF shielding standards and how shielded rooms are tested Rising Bollard Cost Factors Road Blocker Cost Factors Explained Road Blockers Explained Roller Shutter Cost Factors: What Drives the Price Roller shutter regulations in the UK: safety and maintenance Safe room and panic room doors: specification basics Safety Duties for Powered Doors, Gates and Barriers on Commercial Sites School Security Doors Sectional Doors Secured by Design explained: is it mandatory for doors? Secured by Design vs NPSA vs LPCB: Which One You Need Security Door Locks Security Door Maintenance Checklist Security Doors and Access for Everyone: What Approved Document M Asks Security Doors for A and E Departments Security Doors for Badminton Clubs Security Doors for Bowling Alleys Security Doors for Bowls Clubs Security Doors for Climbing Centres Security Doors for Cricket Clubs Security Doors for Dialysis Centres Security Doors for Golf Clubs Security Doors for Hockey Clubs Security Doors for Ice Rinks Security Doors for Maternity Units Security Doors for Mental Health Units Security Doors for Oncology Units Security Doors for Operating Theatres Security Doors for Rehabilitation Centres Security Doors for Snooker Clubs Security Doors for Squash Clubs Security Doors for Swimming Pools Security Doors for Tennis Clubs Security Doors for Walk-in Centres Security Doors West Midlands Explained Security Fencing Security Gates Cost Factors Explained Security shutters vs high performance roller doors Security shutters vs retractable grilles: which suits retail and commercial openings? Security Turnstiles Explained Security Window Film Security Windows for Schools Explained Self Storage Security Doors Server Room Doors Explained Shopping Centre Security Doors Smoke Control Doors Explained Smoke Curtains Specification Mistakes When Mixing LPS 1175, PAS 24 and SBD in One Tender SR2 vs SR3 vs SR4 security doors: choosing the right LPS 1175 level Stadium Security Doors Steel Door Frames Steel vs aluminium security doors: strength, ratings and looks Steel vs timber fire doors: which suits your building? Student Accommodation Security Doors Substation doors: security, ventilation and specification Supermarket Security Doors Telescopic Bollards Tender Evaluation Criteria and Scoring for Security Doors and HVM The Scope of a Maintenance Contract for Security Doors and Barriers Theatre Security Doors Thermal and Weather Performance of External Security Doorsets Thermally broken steel security doors: U-values and certification Traffic Calming as Hostile Vehicle Mitigation Transport hub security requirements Turnstile Cost Factors Explained Turnstile vs speed gate vs security portal: choosing entrance control Types of security doors for commercial buildings University Security Doors Explained Vehicle Dynamics Assessment: What It Tells the Buyer Before a Barrier Is Specified Warehouse Security Doors Explained Warehouse Security Gates Warranty, Defects Liability and Guarantees for Security Doors and Barriers What affects the cost of a bullet resistant door What affects the cost of a high-security door in the UK Window Security Bars View all →

Products

One supplier for the whole building envelope

Ready to specify your project?

Free assessment, written specification and test evidence. Reply within one working day.