A gate, shutter or bollard line may need permission, depending on height, listing and the highway. This guide sets out the checks the official pages ask for.
- ✓Third-party test evidence with every product
- ✓Written specification you can issue to tender
- ✓Supplied and installed across the UK
Get a free project quote
Rating, written specification and budget range within one working day.
Confidential. No cost, no obligation.
Third-party tested
Evidence with every quote
UK manufactured
Made to your sizes
One accountable team
Specify, supply, install
Confidential handling
Details never shared
A gate, a shutter or a line of bollards can change the look of a commercial frontage, and the planning rules treat each one differently. A gate inside the height limits may need no application, while a shutter on the same frontage may need one. This guide sets out the checks the official pages ask for.
- Height limits1 m by a highway, 2 m elsewhere
- Listed buildingsConsent and permission
- Conservation areasTaking a boundary down
- HighwayAgreement for bollards
What counts as development
Section 55 of the Town and Country Planning Act 1990 defines development as building, engineering, mining or other operations in, on, over or under land, or a material change in the use of a building or other land. Building operations include construction, structural alterations and most demolition. Section 57 says planning permission is required for any development of land.
Two exceptions matter for a buyer. The gov.uk guidance page “When is permission required?” names building operations that leave the outside of the building looking as it did, and alterations inside the building except for a mezzanine floor adding more than 200 square metres of retail floorspace. A gate, fence, wall or shutter is a structure, so the question is whether the work falls in one of those exceptions or needs permission.
The permitted development route for gates, fences and walls
Schedule 2 Part 2 Class A of the Town and Country Planning (General Permitted Development) (England) Order 2015 grants planning permission for the erection, construction, maintenance, improvement or alteration of a gate, a fence, a wall or any other means of enclosure. The Planning Portal page on fences, gates and garden walls sets out the conditions that must all be met.
No application is needed where the gate, fence or wall is next to a highway used by vehicles, or its footpath, and is not over 1 metre high, or is not over 2 metres high elsewhere. The height of an existing line already over those heights must not be increased. At a school next to a highway the limit is 2 metres, provided no part over 1 metre obstructs the view of highway users so as to be likely to cause danger.
The route stops at a listed building. Development is not permitted within the curtilage of a listed building, or to a gate, fence or wall surrounding one. Permitted development rights can also be removed by an Article 4 direction or a planning condition, so a right that applies on one site may not apply on the next.
Shutters sit outside the permitted development route
Class A names gates, fences, walls and other means of enclosure. It does not name a shutter. A shutter fixed to the outside of a building changes the frontage, so the local planning authority decides. For the security side of a shutter, the roller shutter regulations guide is the place to look.
Ask the authority before the shutter is ordered. A refusal after the shutter is fitted leaves the buyer with a shutter that must come down, and enforcement can follow work done without permission. The security shutters versus grilles guide compares the two products, and the permission question is the same for either one.
A shutter fitted after a break-in still needs the same permission check as a new one. The forced entry guide walks through the checks that follow an attack. The replacement guide covers a door changed while the building stays in use.
Listed buildings and listed building consent
Section 7 of the Planning (Listed Buildings and Conservation Areas) Act 1990 says no person shall execute works for the demolition of a listed building, or its alteration or extension in any manner which would affect its character as a building of special architectural or historic interest, unless the works are authorised. Section 8 says works are authorised where written consent has been granted by the local planning authority or the Secretary of State.
Listed status can create a need for planning permission where none would ordinarily arise. The Planning Portal guidance on listed building consent says the controls apply to demolition, alteration or extension likely to affect the character of a listed building, and it gives the erection of a means of enclosure as an example. A gate, fence or wall in the grounds of a listed building needs consent even where the same work on an unlisted site would not.
A job can need one consent, the other, or both. The listed building fire doors guide deals with the consent question for fire doors in a listed building.
Conservation areas and taking a boundary down
In a conservation area, taking a boundary down can need permission even where putting one up would not. The Planning Portal page on conservation areas says planning permission is needed to demolish a building of 115 cubic metres or more, or any gate, fence or wall 1 metre or more next to a highway, a public footpath or bridleway, a waterway or an open space, or 2 metres or more elsewhere.
The gov.uk guidance page adds that a building of 50 cubic metres or less can be demolished without permission, and that a gate, fence or wall under 1 metre next to a highway, waterway or open space, or under 2 metres elsewhere, is permitted development under Part 11 of Schedule 2 to the 2015 Order. Outside a conservation area, the demolition of any gate, fence or wall needs no application.
The pedestrian gates guide covers the product side of a gate, and the security fencing guide covers the product side of a fence.
Bollards on or next to the highway
A bollard set into the public highway needs the highway authority to agree before it goes in, and the planning question is a separate one. The bollard regulations guide sets out the highway side, including the anti-terrorism traffic regulation order.
A bollard line next to a highway used by vehicles is inside the limits at 1 metre, and elsewhere at 2 metres, but a bollard on the highway itself needs the highway authority’s agreement first. The anti-ram gates and barriers guide deals with barriers that stop a vehicle. The hvm planters and street furniture guide deals with protection that blends in.
How to get the answer before you order
Run the checks in order. First, measure the height against the 1 metre and 2 metre limits. Second, check whether the site is a listed building or in its curtilage. Third, check whether the site is in a conservation area and whether a boundary is coming down. Fourth, check whether the line sits on or next to a highway, and whether the permitted development rights have been removed.
Ask the local planning authority first, and ask the highway authority where a bollard or a gate meets the highway. Where the answer is not clear, a certificate of lawful development settles it formally. The CDM duties guide sets out who must do what when the work is fitted, and the Regulation 38 guide sets out the fire safety information handed over with a fire-rated doorset.
| Product | Permission route | Check first |
|---|---|---|
| Gate or fence next to a highway | Permitted development to 1 m | Measure from ground level |
| Gate or fence elsewhere | Permitted development to 2 m | Check the height of any existing line |
| External shutter | No Class A route; local planning authority decides | Ask before ordering |
| Bollard on the highway | Highway authority agreement, then the planning question | Ask the highway authority first |
| Listed building | Listed building consent, plus planning permission where it applies | Ask the local planning authority |
The heights are the easy check. The listing, the conservation area and the highway are the ones that catch a job out.
Does a gate need planning permission?
A gate up to 1 metre high beside a highway used by vehicles, or up to 2 metres high elsewhere, is permitted development under Class A, unless the site is a listed building or the permitted development rights have been removed. Above those heights, or on a listed site, an application is needed.
Does a security shutter need planning permission?
Class A does not name a shutter, so there is no permitted development route for one. The local planning authority decides, and the buyer should ask before ordering.
What happens if a boundary fence in a conservation area needs replacing?
Removing a boundary in a conservation area can need permission where putting one up would not. A gate, fence or wall of 1 metre or more beside a highway, waterway or open space needs permission to come down, and the limit is 2 metres elsewhere. Check with the local planning authority first.
What is Class A permitted development?
Class A is the part of the General Permitted Development Order that grants planning permission for a gate, fence, wall or other means of enclosure, subject to the height limits and the listed building exclusion.
Who decides whether a bollard needs permission?
The highway authority decides anything placed on the public highway, and the local planning authority decides the planning question. A bollard on private land beside the highway is judged differently, so ask both where the line is not clear.
Contact us for a free quote
Related
More in guides for specifiers
Products
One supplier for the whole building envelope
Ready to specify your project?
Free assessment, written specification and test evidence. Reply within one working day.