Community centres fill with visitors who do not know the building, so each leaf takes the period the room behind it demands, from hall to plant room.

  • ✓Third-party test evidence with every product
  • ✓Written specification you can issue to tender
  • ✓Supplied and installed across the UK
Prefer to talk?+44 7352 267239

Get a free project quote

Rating, written specification and budget range within one working day.

ArxBridge Quote Form

Confidential. No cost, no obligation.

Third-party tested

Evidence with every quote

UK manufactured

Made to your sizes

One accountable team

Specify, supply, install

Confidential handling

Details never shared

A community centre is a hall, a set of meeting rooms and an office behind one entrance, and the fire rules for the building follow the rooms behind each leaf. The hall holds the crowds, the meeting rooms hold the groups, and the office holds the records, so the period on a leaf follows what sits behind it and how many people stand in front of it.

Fire doors in a community centre are proved to EN 1634-1, and the period names how long the leaf holds fire back. The hall takes the longest period in the building, the rooms beside it take the same, and the leaves on the public route take the shortest, because the route behind them is short and the people on it move fast.

A community centre follows the same rules as any other public building. The fire door regulations commercial buildings guide covers the parts the buildings share, and the fire door regulations leisure centres guide covers the fire rules for a sports centre, which fills with visitors the same way a community hall does.

  • FD30 / FD60Fire periods to EN 1634-1
  • HallsWhere the period rises
  • Sa / S200Smoke ratings to BS EN 1634-3
  • One listEvery centre door named

The hall, the meeting rooms and the office: one building, seven periods

Seven parts make up a community centre, and the period follows what each part holds. The hall holds the crowds, the meeting rooms hold the groups, the office holds the records, the stores hold the chairs and the equipment, the kitchen serves the groups, and the plant room keeps the building running.

The hall leaf takes FD60, the meeting rooms beside it take FD60, and the office takes FD60, because the people and the records behind those leaves need the longest hold the building asks for. The stores, the kitchen and the plant room take FD60 as well, while the leaves on the public route take FD30.

The order is written from a list that names every opening, the leaf it takes and the period beside it, because a leaf with no line on the list may turn up in the wrong meeting room, and a leaf in the wrong room holds fire for the wrong length of time.

FD30 and FD60 in a community centre: the minutes each room takes

The period on a door is a count of minutes, and EN 1634-1 is the test that counts them. A leaf proved to FD30 holds fire back for thirty minutes, a leaf proved to FD60 holds for sixty, and the letter beside the minutes says what was held: E for flames alone, EW for flames with some heat held back, and EI for flames with the heat held back as well.

Where a hall leaf must hold fire as well as forced entry, the two proofs are taken on the same doorset and sit in one report. EN 1634-1 proves the minutes and the letters, and LPS 1175 Issue 8.2 of September 2024 proves the grade in B3, C5 and D10. The fire and security doors dual certification guide shows how the pair is proved on one doorset.

On drawings drawn before Issue 8 the same three forced entry categories are called SR2, SR3 and SR4, so the order carries the old name beside the new one for the fitter who reads them. What breaks a rating once a door is fitted is named in the keeping an LPS 1175 rating valid guide.

Need this specified for your project?Free rating, written specification and budget range within one working day.
Get a free quote

The hall doors: leaves that shut on a crowd mid-event

The hall is the room that fills first and empties last, so its leaves take the longest period in the building. FD60 suits the hall, because the crowd behind the leaf needs the minutes it takes to leave in order, and the leaf must hold until the last person is out.

A hall leaf shuts on its own after every person through it, because a leaf left standing open holds nothing back. The closer is set so the leaf comes home without a slam, and the pull is checked by opening the leaf and seeing it shut on its own.

The hall leaf shuts out the sound of the foyer as well as the fire, so the meeting rooms stay quiet while visitors move through. The seals round the hall leaf and a closer that brings it home after every person through do that work.

Meeting rooms and offices: the doors the public passes

The meeting rooms hold the groups that meet through the day, and their leaves take FD60, because the people behind them need the same hold as the hall. The office holds the records and the keys, and its leaf takes FD60, because the records behind it cannot be replaced once the fire reaches them.

A meeting room leaf can carry a glazed panel so the corridor sees whether the room is in use, and the pane is proved with the leaf round it rather than alone. The glass, the bead and the fixings are all named in the test report, because a pane that falls from its beads holds nothing back. What the pane adds to the figure is set out in the fire rated glass cost guide.

The stores beside the office hold the chairs, the tables and the equipment, so their leaf takes FD60, and its lock takes the same key as the office. The fire door regulations offices guide takes the same care with the rooms of an office, and the fire door regulations schools guide takes it with the rooms of a school.

The kitchen and the plant room: heat, stores and the leaf between them

The kitchen sits beside the hall and serves every group that meets there, so its leaf is wide enough for trolleys and trays and shuts on its own after each meal. FD60 suits the kitchen leaf, because the heat of the kitchen is the heat the hall must be kept from, and the leaf is proved with its frame, its fixings and its lock as one doorset.

Where the kitchen leaf stands open through the working day, the device that holds it open must be proved to BS EN 1155, so it releases the leaf on its own when the alarm sounds. A leaf propped open with a trolley or a wedge has no period at all while it stands open.

Behind the plant room leaf sit the boards and the plant that keep the building running, so the leaf takes FD60 and is checked with the rest of the building on the round. The plant room fire doors guide covers the leaves of a plant room in full, and the fire door regulations warehouses guide takes the same care with the stores of a warehouse.

The way out for visitors who do not know the building

The alarm in a community centre sends a crowd of strangers towards the way out, so the route is signed at every turn and kept clear of chairs, tables and stores. A leaf on the route must open to one push from whoever reaches it first, whether the power is on or off, because the first person there may be a visitor who has never used the building before.

Smoke reaches the people on the route before the flame does, so the route doors carry a smoke rating beside their period. BS EN 1634-3 names the two ratings: Sa for smoke at room temperature and S200 for smoke at 200 degrees. The smoke control doors guide works through how the doors on a route keep the smoke back while the crowd moves past them.

The centre is a crowded place under Martyn’s Law, and the measures that support the risk assessment are set out in the Martyn’s Law guide for premises. A route is only as strong as its weakest leaf, so every leaf on it must hold for the same minutes. The fire door regulations stadiums guide takes the same care with the crowds of a stadium.

Position Leaf Period What to check
Entrance Glazed leaf FD30 Leaf, glass, closer
Hall Steel leaf FD60 Leaf, lock, seals
Meeting rooms Steel leaf FD60 Leaf, lock, seals
Office Steel leaf FD60 Leaf, lock, seals
Stores Steel leaf FD60 Leaf, lock, seals
Kitchen Steel leaf FD60 Leaf, closer, seals
Plant room Steel leaf FD60 Leaf, lock, seals

What keeps the period after the leaf is fitted: hinges, closers and seals

A 4 mm gap runs round the leaf once it is hung, and the gauge on the round checks that the gap has not widened since the last visit, because a wider gap points at a hinge or a frame that has moved. The seal in the groove swells as the heat nears 200 to 250 degrees and closes the gap, unless paint over the seal holds it back, so the seal is looked at as well as the gap.

The closer on a fire door takes the smallest power the standard allows, which is EN 3 to BS EN 1154, and the leaf must shut on its own from any angle it is opened to. The hinges carry the leaf through every open and shut, and BS EN 1935 names the grade: grade 13 for 200,000 cycles at 120 kg, grade 14 for 200,000 cycles at 160 kg. What the hardware must do is set out in the fire door hardware guide, and the closers in full are covered in the fire door closers guide.

The signs on a fire door say what the leaf is and which way it opens. What each sign must say is set out in the fire door signage guide, and the gaps round the leaf are covered in the fire door gaps guide.

The centre order: every leaf, its period and its proof

One list carries the whole centre order, with a line for every opening that names the leaf, the period, the lock and the closer beside it. A list that names one leaf for the whole building leaves the fitter to guess which room takes which period.

Money is settled leaf by leaf before the order is signed, because a closer ordered after the doorset costs more than one ordered with it, and a leaf with no figure beside it still turns up on the invoice. The how to specify security doors guide lists what the schedule must hold for every door.

Once a month the centre manager walks the building with the door list in hand, trying a few leaves on each walk so every leaf is tried before the month is out. The entrance is tried at opening, the hall before the first group arrives, and the office door at closing. The record of each walk stays with the centre file, and the fire door inspection checklist names what the walk should cover.

A community centre fire door holds only as long as the halls behind it and the route beside it, so the period, the smoke rating and the closer must all sit on the same list.

What period should a community centre fire door carry?

FD60 for the hall, the meeting rooms, the office, the stores, the kitchen and the plant room, and FD30 for the leaves on the public route, each proved to EN 1634-1.

Can one leaf hold fire and forced entry?

Yes, where one doorset passed both tests together, so the fire proof and the forced entry proof sit in the same report.

Do community centre fire doors need a smoke rating?

Yes, the leaves on the escape route carry Sa or S200 to BS EN 1634-3 beside their period, because smoke reaches the people on the route before the flame does.

Who checks the community centre fire doors?

The centre manager walks the building once a month with the door list, trying a few leaves on each walk.

What happens when a fire door will not shut?

The leaf is written against its door on the day the fault is found, and the repair is booked while it is still small.

Specifying fire doors for a community centre?Send the door list and the period each room must hold for a tested door quotation.
Get a free quote

Related

More in guides for specifiers

10 mistakes when specifying certified security doors 10 steps to specify an LPS 1175 door Acceptance and Snagging of a Security Door or Barrier Job Access Control Doors Acoustic Doors: Ratings and Specification After a Forced Entry Attempt: Checking a Security Door Airport Security Doors Anti-Ligature Doors for Mental Health Wards Anti-Ram Bollards Anti-ram gates and barriers: protecting vehicle entrances Arcade Security Doors Explained Automatic Doors Automatic Gates Cost Factors Automatic Vehicle Barriers Ballistic Panels Bank Security Doors Bingo Hall Security Doors Explained Blast doors: glazed vs solid and how they are rated Blast protection window film: what it does and what it cannot do Blast resistant windows: what drives the cost and how to specify them Bollard Cost Factors Explained Bollard regulations in the UK: spacing, height and depth Bookmaker Security Doors Explained Builders Merchant Security Doors Bullet Resistant Glass Cost Factors Bullet resistant glass ratings explained: BR1 to BR7 and SG classes Bullet resistant vs bulletproof glass: what the difference means Buying Security Doors and HVM Through Public Frameworks Car Park Security Doors Explained Car Showroom Security Doors Casino Security Doors Explained CDM 2015 Duties When Security Doors, Shutters or HVM Are Installed Cinema Security Doors Cleanroom Doors Cold Store Doors College Security Doors Commissioning, Handover and the O&M Manual for Security Doors and HVM Communal entrance doors for flats: Secured by Design and what to specify Community Centre Security Doors Control Room Doors Court Security Doors Crash Rated Fences and HVM Fencing Explained Data centre physical security: doors, glazing, HVM and shielding by zone Dental Practice Security Doors Depot Security Doors Explained Door Entry Systems Due Diligence When Selecting Vehicle Security Barriers Emergency Exit Doors EMP Shielding Cost Factors Explained Exhibition Centre Fire Door Rules Exhibition Centre Security Doors Factory Security Doors Faraday cage vs RF shielded room: what a business needs FB4 vs FB6 vs FB7: how to choose a ballistic rating Fire and security doors: how dual certification works Fire Compartmentation Fire Curtains Fire Door Certification Fire Door Closers Explained Fire Door Cost Factors Fire Door Duties of the Accountable Person Fire Door Gaps Fire Door Hardware Explained Fire door inspection checklist for steel and timber doors Fire Door Maintenance Fire Door Regulations Care Homes Fire Door Regulations for A and E Departments Fire Door Regulations for Airports Explained Fire Door Regulations for Bowls Clubs Fire door regulations for commercial buildings in the UK Fire Door Regulations for Dialysis Centres Fire Door Regulations for Hockey Clubs Fire Door Regulations for Hospitals Explained Fire Door Regulations for Offices Explained Fire Door Regulations for Operating Theatres Fire Door Regulations for Retail Explained Fire Door Regulations for Schools Explained Fire Door Regulations for Snooker Clubs Fire Door Regulations for Stadiums Fire Door Regulations for Student Accommodation Fire Door Regulations for Warehouses Fire Door Regulations Leisure Centres Fire Door Regulations Restaurants Fire Door Remediation Programme for Housing Providers Fire Door Rules for Badminton Clubs Fire Door Rules for Bingo Halls Fire Door Rules for Bookmakers Fire Door Rules for Bowling Alleys Fire Door Rules for Car Parks Fire Door Rules for Car Showrooms Fire Door Rules for Cinemas Fire Door Rules for Climbing Centres Fire Door Rules for Colleges Fire Door Rules for Cricket Clubs Fire Door Rules for Dental Practices Fire Door Rules for Depots Explained Fire Door Rules for Golf Clubs Fire Door Rules for GP Surgeries Fire Door Rules for Gyms Explained Fire Door Rules for Ice Rinks Fire Door Rules for Maternity Units Fire Door Rules for Mental Health Units Fire Door Rules for Museums Fire Door Rules for Oncology Units Fire Door Rules for Opticians Fire Door Rules for Pawnbrokers Fire Door Rules for Petrol Stations Fire Door Rules for Pharmacies Fire Door Rules for Ports Fire Door Rules for Post Offices Fire Door Rules for Prisons Fire Door Rules for Rehabilitation Centres Fire Door Rules for Self Storage Fire Door Rules for Shopping Centres Fire Door Rules for Squash Clubs Fire Door Rules for Supermarkets Fire Door Rules for Swimming Pools Fire Door Rules for Tennis Clubs Fire Door Rules for Theatres Fire Door Rules for UK Arcades Fire Door Rules for UK Casinos Fire Door Rules for UK Hospices Fire Door Rules for Walk-in Centres Fire Door Signage Fire Door Vision Panels Fire Doors and Gateway 2 in Higher-Risk Buildings Fire Rated Glass Cost Explained Fire Rated Sliding Doors Explained Fire Rated Windows Cost Factors Fire Rated Windows Explained Fire Safety Enforcement Notices and Fire Doors: What the Responsible Person Must Do Flat Entrance Doors: PAS 24 and Fire Rated Forced Entry vs Ballistic vs Blast: Which Rating a Site Needs Garage Security Doors Explained Gate Automation Explained Golden Thread Records for Fire Doors GP Surgery Security Doors Explained Gym Security Doors Explained High Speed Doors HMO Fire Doors Hospice Security Doors Explained Hospital Security Doors: Wards, A&E, Plant Hospital Security Gates Hotel Fire Doors Hotel Security Doors How to choose HVM bollards: fixed, shallow mount, removable and automatic How to keep an LPS 1175 door rating valid after installation How to Specify Fire Doors in a Housing Tender How to specify security doors: a checklist for architects How to Verify a Secured by Design Listing How to Verify an LPS 1175 Certificate on Red Book Live How to Write an Operational Requirement for Physical Security HVM planters and street furniture: protection that blends in In-Service Care of Vehicle Security Barriers Installation Handover: LPS 1175 Doors and PAS 68 Barriers Intumescent Seals ISO 16933 explained: EXV and SB classes and hazard ratings ISO 22343 vehicle security barriers explained Keeping a Dual-Certified Fire and Security Door Valid in Service Laboratory Security Doors Layered Security for a Site: Deter, Detect, Delay, Mitigate, Respond Lead Times and Programme Risks for LPS 1175 Doors Leisure Centre Security Doors Library Security Doors Listed Building Fire Doors Loading Bay Doors Explained Lockdown and Access Control Hardware on an LPS 1175 Door LPS 1175 Gates and Grilles Explained LPS 1175 Issue 8 explained: from SR1 to SR8 to A1 to H20 LPS 1175 Roller Shutters LPS 1175 vs ASTM F2781 and Other US Ratings Explained LPS 1175 vs EN 1627: how UK and European burglar resistance ratings compare LPS 1175 vs PAS 24: which security standard does your door need? LPS 1175 Windows and Walling Explained Martyn’s Law and Places of Worship: What a Buyer Checks for Doors and Entry Control Martyn’s Law Enhanced Tier: Physical Measures and the Specifier Brief Martyn’s Law Standard Tier: Procedures, Doors and Shutters Martyn’s Law Timeline and the SIA Regulator Martyn’s Law: what premises must do and which physical measures to consider Master Key Systems MRI and RF shielded rooms: how they work and what to specify Museum Security Doors NPSA Catalogue of Security Equipment (CSE) Explained NPSA Forced Entry and Blast Guidance for Government Sites NPSA Guidance on Lockdown and Marauding Attack: What It Asks of Doors and Entrances Office Security Doors Optician Security Doors Explained Panic Hardware PAS 24 requirements for doors and windows explained PAS 68 Bollard Foundations Explained PAS 68 bollards: ratings, spacing and cost factors PAS 68 vs IWA 14 vs ISO 22343: hostile vehicle mitigation standards explained Pawnbroker Security Doors Explained Pedestrian Gates Petrol Station Security Doors Pharmacy Security Doors Planning Permission for Security Shutters, Gates and Bollards on Commercial Premises Plant room doors: fire, security and ventilation requirements Plant Room Fire Doors Port Security Doors Post Office Security Doors Explained Powder coating vs galvanising vs paint for steel Preliminary Market Engagement for Security Doors and HVM Prison Security Doors Programming a Security Door and Barrier Package on a Live Site Public-Sector Tender Response Checklist for Security Door and HVM Supply Reading a PAS 24 and SBD Door Test Report Regulation 38 Fire Safety Information at Handover for Fire-Rated Security Doorsets Replacing Security Doors in an Occupied Building Restaurant Security Doors Retail Security Doors Revolving Doors RF shielding standards and how shielded rooms are tested Rising Bollard Cost Factors Road Blocker Cost Factors Explained Road Blockers Explained Roller Shutter Cost Factors: What Drives the Price Roller shutter regulations in the UK: safety and maintenance Safe room and panic room doors: specification basics Safety Duties for Powered Doors, Gates and Barriers on Commercial Sites School Security Doors Sectional Doors Secured by Design explained: is it mandatory for doors? Secured by Design vs NPSA vs LPCB: Which One You Need Security Door Locks Security Door Maintenance Checklist Security Doors and Access for Everyone: What Approved Document M Asks Security Doors for A and E Departments Security Doors for Badminton Clubs Security Doors for Bowling Alleys Security Doors for Bowls Clubs Security Doors for Climbing Centres Security Doors for Cricket Clubs Security Doors for Dialysis Centres Security Doors for Golf Clubs Security Doors for Hockey Clubs Security Doors for Ice Rinks Security Doors for Maternity Units Security Doors for Mental Health Units Security Doors for Oncology Units Security Doors for Operating Theatres Security Doors for Rehabilitation Centres Security Doors for Snooker Clubs Security Doors for Squash Clubs Security Doors for Swimming Pools Security Doors for Tennis Clubs Security Doors for Walk-in Centres Security Doors West Midlands Explained Security Fencing Security Gates Cost Factors Explained Security shutters vs high performance roller doors Security shutters vs retractable grilles: which suits retail and commercial openings? Security Turnstiles Explained Security Window Film Security Windows for Schools Explained Self Storage Security Doors Server Room Doors Explained Shopping Centre Security Doors Smoke Control Doors Explained Smoke Curtains Specification Mistakes When Mixing LPS 1175, PAS 24 and SBD in One Tender SR2 vs SR3 vs SR4 security doors: choosing the right LPS 1175 level Stadium Security Doors Steel Door Frames Steel vs aluminium security doors: strength, ratings and looks Steel vs timber fire doors: which suits your building? Student Accommodation Security Doors Substation doors: security, ventilation and specification Supermarket Security Doors Telescopic Bollards Tender Evaluation Criteria and Scoring for Security Doors and HVM The Scope of a Maintenance Contract for Security Doors and Barriers Theatre Security Doors Thermal and Weather Performance of External Security Doorsets Thermally broken steel security doors: U-values and certification Traffic Calming as Hostile Vehicle Mitigation Transport hub security requirements Turnstile Cost Factors Explained Turnstile vs speed gate vs security portal: choosing entrance control Types of security doors for commercial buildings University Security Doors Explained Vehicle Dynamics Assessment: What It Tells the Buyer Before a Barrier Is Specified Warehouse Security Doors Explained Warehouse Security Gates Warranty, Defects Liability and Guarantees for Security Doors and Barriers What affects the cost of a bullet resistant door What affects the cost of a high-security door in the UK Window Security Bars View all →

Products

One supplier for the whole building envelope

Ready to specify your project?

Free assessment, written specification and test evidence. Reply within one working day.