ArxBridge
Fire Door Rules for Community Centres
Community centres fill with visitors who do not know the building, so each leaf takes the period the room behind it demands, from hall to plant room.
- ✓Third-party test evidence with every product
- ✓Written specification you can issue to tender
- ✓Supplied and installed across the UK
Get a free project quote
Rating, written specification and budget range within one working day.
Confidential. No cost, no obligation.
Third-party tested
Evidence with every quote
UK manufactured
Made to your sizes
One accountable team
Specify, supply, install
Confidential handling
Details never shared
A community centre is a hall, a set of meeting rooms and an office behind one entrance, and the fire rules for the building follow the rooms behind each leaf. The hall holds the crowds, the meeting rooms hold the groups, and the office holds the records, so the period on a leaf follows what sits behind it and how many people stand in front of it.
Fire doors in a community centre are proved to EN 1634-1, and the period names how long the leaf holds fire back. The hall takes the longest period in the building, the rooms beside it take the same, and the leaves on the public route take the shortest, because the route behind them is short and the people on it move fast.
A community centre follows the same rules as any other public building. The fire door regulations commercial buildings guide covers the parts the buildings share, and the fire door regulations leisure centres guide covers the fire rules for a sports centre, which fills with visitors the same way a community hall does.
- FD30 / FD60Fire periods to EN 1634-1
- HallsWhere the period rises
- Sa / S200Smoke ratings to BS EN 1634-3
- One listEvery centre door named
The hall, the meeting rooms and the office: one building, seven periods
Seven parts make up a community centre, and the period follows what each part holds. The hall holds the crowds, the meeting rooms hold the groups, the office holds the records, the stores hold the chairs and the equipment, the kitchen serves the groups, and the plant room keeps the building running.
The hall leaf takes FD60, the meeting rooms beside it take FD60, and the office takes FD60, because the people and the records behind those leaves need the longest hold the building asks for. The stores, the kitchen and the plant room take FD60 as well, while the leaves on the public route take FD30.
The order is written from a list that names every opening, the leaf it takes and the period beside it, because a leaf with no line on the list may turn up in the wrong meeting room, and a leaf in the wrong room holds fire for the wrong length of time.
FD30 and FD60 in a community centre: the minutes each room takes
The period on a door is a count of minutes, and EN 1634-1 is the test that counts them. A leaf proved to FD30 holds fire back for thirty minutes, a leaf proved to FD60 holds for sixty, and the letter beside the minutes says what was held: E for flames alone, EW for flames with some heat held back, and EI for flames with the heat held back as well.
Where a hall leaf must hold fire as well as forced entry, the two proofs are taken on the same doorset and sit in one report. EN 1634-1 proves the minutes and the letters, and LPS 1175 Issue 8.2 of September 2024 proves the grade in B3, C5 and D10. The fire and security doors dual certification guide shows how the pair is proved on one doorset.
On drawings drawn before Issue 8 the same three forced entry categories are called SR2, SR3 and SR4, so the order carries the old name beside the new one for the fitter who reads them. What breaks a rating once a door is fitted is named in the keeping an LPS 1175 rating valid guide.
The hall doors: leaves that shut on a crowd mid-event
The hall is the room that fills first and empties last, so its leaves take the longest period in the building. FD60 suits the hall, because the crowd behind the leaf needs the minutes it takes to leave in order, and the leaf must hold until the last person is out.
A hall leaf shuts on its own after every person through it, because a leaf left standing open holds nothing back. The closer is set so the leaf comes home without a slam, and the pull is checked by opening the leaf and seeing it shut on its own.
The hall leaf shuts out the sound of the foyer as well as the fire, so the meeting rooms stay quiet while visitors move through. The seals round the hall leaf and a closer that brings it home after every person through do that work.
Meeting rooms and offices: the doors the public passes
The meeting rooms hold the groups that meet through the day, and their leaves take FD60, because the people behind them need the same hold as the hall. The office holds the records and the keys, and its leaf takes FD60, because the records behind it cannot be replaced once the fire reaches them.
A meeting room leaf can carry a glazed panel so the corridor sees whether the room is in use, and the pane is proved with the leaf round it rather than alone. The glass, the bead and the fixings are all named in the test report, because a pane that falls from its beads holds nothing back. What the pane adds to the figure is set out in the fire rated glass cost guide.
The stores beside the office hold the chairs, the tables and the equipment, so their leaf takes FD60, and its lock takes the same key as the office. The fire door regulations offices guide takes the same care with the rooms of an office, and the fire door regulations schools guide takes it with the rooms of a school.
The kitchen and the plant room: heat, stores and the leaf between them
The kitchen sits beside the hall and serves every group that meets there, so its leaf is wide enough for trolleys and trays and shuts on its own after each meal. FD60 suits the kitchen leaf, because the heat of the kitchen is the heat the hall must be kept from, and the leaf is proved with its frame, its fixings and its lock as one doorset.
Where the kitchen leaf stands open through the working day, the device that holds it open must be proved to BS EN 1155, so it releases the leaf on its own when the alarm sounds. A leaf propped open with a trolley or a wedge has no period at all while it stands open.
Behind the plant room leaf sit the boards and the plant that keep the building running, so the leaf takes FD60 and is checked with the rest of the building on the round. The plant room fire doors guide covers the leaves of a plant room in full, and the fire door regulations warehouses guide takes the same care with the stores of a warehouse.
The way out for visitors who do not know the building
The alarm in a community centre sends a crowd of strangers towards the way out, so the route is signed at every turn and kept clear of chairs, tables and stores. A leaf on the route must open to one push from whoever reaches it first, whether the power is on or off, because the first person there may be a visitor who has never used the building before.
Smoke reaches the people on the route before the flame does, so the route doors carry a smoke rating beside their period. BS EN 1634-3 names the two ratings: Sa for smoke at room temperature and S200 for smoke at 200 degrees. The smoke control doors guide works through how the doors on a route keep the smoke back while the crowd moves past them.
The centre is a crowded place under Martyn’s Law, and the measures that support the risk assessment are set out in the Martyn’s Law guide for premises. A route is only as strong as its weakest leaf, so every leaf on it must hold for the same minutes. The fire door regulations stadiums guide takes the same care with the crowds of a stadium.
| Position | Leaf | Period | What to check |
|---|---|---|---|
| Entrance | Glazed leaf | FD30 | Leaf, glass, closer |
| Hall | Steel leaf | FD60 | Leaf, lock, seals |
| Meeting rooms | Steel leaf | FD60 | Leaf, lock, seals |
| Office | Steel leaf | FD60 | Leaf, lock, seals |
| Stores | Steel leaf | FD60 | Leaf, lock, seals |
| Kitchen | Steel leaf | FD60 | Leaf, closer, seals |
| Plant room | Steel leaf | FD60 | Leaf, lock, seals |
What keeps the period after the leaf is fitted: hinges, closers and seals
A 4 mm gap runs round the leaf once it is hung, and the gauge on the round checks that the gap has not widened since the last visit, because a wider gap points at a hinge or a frame that has moved. The seal in the groove swells as the heat nears 200 to 250 degrees and closes the gap, unless paint over the seal holds it back, so the seal is looked at as well as the gap.
The closer on a fire door takes the smallest power the standard allows, which is EN 3 to BS EN 1154, and the leaf must shut on its own from any angle it is opened to. The hinges carry the leaf through every open and shut, and BS EN 1935 names the grade: grade 13 for 200,000 cycles at 120 kg, grade 14 for 200,000 cycles at 160 kg. What the hardware must do is set out in the fire door hardware guide, and the closers in full are covered in the fire door closers guide.
The signs on a fire door say what the leaf is and which way it opens. What each sign must say is set out in the fire door signage guide, and the gaps round the leaf are covered in the fire door gaps guide.
The centre order: every leaf, its period and its proof
One list carries the whole centre order, with a line for every opening that names the leaf, the period, the lock and the closer beside it. A list that names one leaf for the whole building leaves the fitter to guess which room takes which period.
Money is settled leaf by leaf before the order is signed, because a closer ordered after the doorset costs more than one ordered with it, and a leaf with no figure beside it still turns up on the invoice. The how to specify security doors guide lists what the schedule must hold for every door.
Once a month the centre manager walks the building with the door list in hand, trying a few leaves on each walk so every leaf is tried before the month is out. The entrance is tried at opening, the hall before the first group arrives, and the office door at closing. The record of each walk stays with the centre file, and the fire door inspection checklist names what the walk should cover.
A community centre fire door holds only as long as the halls behind it and the route beside it, so the period, the smoke rating and the closer must all sit on the same list.
What period should a community centre fire door carry?
FD60 for the hall, the meeting rooms, the office, the stores, the kitchen and the plant room, and FD30 for the leaves on the public route, each proved to EN 1634-1.
Can one leaf hold fire and forced entry?
Yes, where one doorset passed both tests together, so the fire proof and the forced entry proof sit in the same report.
Do community centre fire doors need a smoke rating?
Yes, the leaves on the escape route carry Sa or S200 to BS EN 1634-3 beside their period, because smoke reaches the people on the route before the flame does.
Who checks the community centre fire doors?
The centre manager walks the building once a month with the door list, trying a few leaves on each walk.
What happens when a fire door will not shut?
The leaf is written against its door on the day the fault is found, and the repair is booked while it is still small.
Get a free quote
Related
More in guides for specifiers
Products
One supplier for the whole building envelope
Ready to specify your project?
Free assessment, written specification and test evidence. Reply within one working day.