Certified physical security

ArxBridge
Installer checking the seal of navy steel fire-rated doors in a UK office corridor

ArxBridge

Fire Door Rules for Cricket Clubs

Members move between the pavilion, the bar and the changing rooms, so each door takes the fire period its room demands, FD30 at the front and FD60 behind it.

  • ✓Third-party test evidence with every product
  • ✓Written specification you can issue to tender
  • ✓Supplied and installed across the UK
Prefer to talk?+44 7352 267239

Get a free project quote

Rating, written specification and budget range within one working day.

ArxBridge Quote Form

Confidential. No cost, no obligation.

Third-party tested

Evidence with every quote

UK manufactured

Made to your sizes

One accountable team

Specify, supply, install

Confidential handling

Details never shared

Members at a cricket club move between the pavilion, the bar and the changing rooms, so each door takes the fire period its room demands. The pavilion entrance, the bar, the kit store and the changing rooms take FD30, and the kitchen, the back office and the plant room take FD60, because the rooms behind the front hold the heat, the papers and the services, and those rooms ask for a longer hold than the route out.

The minutes after FD come from EN 1634-1, which runs from 30 to 120, and the letter beside the number names what the leaf held back in its test. E means flame on its own was held, EW means flame with some of the heat was held, and EI means flame with the heat as well was held, so the number counts minutes and the letter names what stayed back.

A cricket club follows the same fire rules as any other building where people move between rooms they know well and rooms they have never used, and the period on each leaf follows what sits behind it and how fast the people behind it can move. The fire door regulations leisure centres guide covers the fire rules for a building where a match and a meal give way to sports halls and pools, and the fire door regulations stadiums guide covers the rooms of a ground where a crowd watches from a stand.

  • FD30 / FD60Fire periods to EN 1634-1
  • KitchenWhere FD60 holds the heat
  • Sa / S200Smoke ratings to BS EN 1634-3
  • One listEvery pavilion door named

Seven rooms in a cricket pavilion: the period each leaf takes

Seven rooms make up the pavilion, and the period follows what each room holds. Members come in through the pavilion entrance, drink in the bar, fetch kit from the kit store and change in the changing rooms.

FD60 sits on the kitchen, the back office and the plant room, because the heat, the papers and the services behind those leaves need sixty minutes before flame reaches them. FD30 sits on the pavilion entrance, the bar, the kit store and the changing rooms, because the people on that route reach the outfield in far less than thirty minutes.

The order gives every opening a line of its own, naming the leaf and the period beside it, so no leaf is hung on guesswork. The table below puts the seven rooms with the period each one takes and the grade beside the period, so the fitter matches each leaf to its line as it is hung.

Room Period Grade What to check
Pavilion entrance FD30 B3 Leaf, glass, closer
Bar FD30 B3 Leaf, glass, closer
Kit store FD30 B3 Leaf, lock, closer
Changing rooms FD30 B3 Leaf, lock, closer
Kitchen FD60 C5 Leaf, lock, seals
Back office FD60 C5 Leaf, lock, seals
Plant room FD60 C5 Leaf, lock, seals

What FD30 and FD60 hold back in a cricket pavilion

A period counts the minutes a doorset earned in its test, where the doorset is the leaf, the frame, the fixings and the lock proved as one. The order writes the period beside the leaf, and what the report behind a period must hold is named in the fire door certification guide.

One doorset in the pavilion can carry the fire proof and the forced entry proof in a single report. EN 1634-1 gives the fire minutes, and LPS 1175 Issue 8.2 of September 2024 gives the forced entry grade in B3 and C5, while the fire and security doors dual certification guide shows the pair proved on the same leaf.

Members who have never used the pavilion need the route to stay clear while the bar empties, so a swollen leaf or a dragging leaf is put right at once.

Need this specified for your project?Free rating, written specification and budget range within one working day.
Get a free quote

FD60 in the kitchen, back office and plant room

Behind the kitchen leaf sit the cookers and the gas that feed teas at the interval, so the leaf takes FD60 and stays shut while the cookers are hot and the volunteers are serving.

Behind the plant room leaf sit the boards and the equipment that keep the water hot and the lights on, so the leaf takes FD60 because the boards behind it feed the whole pavilion. The plant room fire doors guide names what a leaf on that room must hold, and the leaf stays shut because an open plant room leaf would let flame reach the boards in seconds.

The back office leaf takes FD60 as well, because the membership lists and the fixture lists behind it cannot be remade once flame reaches them. Each leaf is shut as the last person leaves the room, because a leaf left open holds back no flame.

Pavilion entrance, bar and changing rooms: FD30 on the way out

The pavilion entrance leaf, the bar leaf and the changing room leaf all take FD30, because members and visitors pass through them on the way out to the car park. Thirty minutes is more than the people on that route need to reach the outfield.

Where the way out serves more than 60 people, the leaves on it carry a push bar proved to BS EN 1125, and the bar runs across no less than 60 percent of the leaf width. One push from a member with a crowd behind them throws the leaf open, and the bar works with the supply on or off. What the bar must do when a crowd pushes against the leaf is named in the panic hardware guide, and the leaves on the way out are covered in the emergency exit doors guide.

The alarm may sound while visitors who have never used the pavilion are still in the bar, so the route to the car park is signed at every turn and nothing stands on it. A leaf on the way out must still open to a push from a member carrying a kit bag, and BS 8300 with Approved Document M puts the push below 30 N through the first 30 degrees of swing and below 22.5 N beyond that. The fire door regulations restaurants guide covers the rooms of a building where food is cooked beside a bar.

Kit store: FD30 beside bats, pads and club kit

The kit store holds bats, pads, gloves and helmets on shelves beside the changing rooms, so its leaf takes FD30 to hold the room clear while the kit inside is carried out. Thirty minutes is more than the players need to fetch the kit and reach the outfield.

The kit store leaf is shut whenever no one is fetching kit, because an open leaf lets flame reach the shelves in seconds. The fire door regulations community centres guide covers the rooms of a hall where stores sit behind shut leaves, and the same rule holds in the pavilion.

The kit store leaf carries FD30 beside the grade the room demands, and its hardware was proved with the leaf, so no fitting fitted later takes the period off it.

Smoke in the pavilion: Sa and S200 beside the period

Members leaving the bar meet smoke before flame, so the leaves on the way out carry a smoke rating beside their fire period. The two smoke ratings come from BS EN 1634-3, Sa for smoke at room temperature and S200 for smoke at 200 degrees.

Where a leaf must stand open while the pavilion is busy, a device proved to BS EN 1155 holds it, and the device lets the leaf go by itself the moment the alarm sounds. The fire compartmentation guide names how the leaves hold the line between one part of the pavilion and the next, and a wedge under a leaf is never the device that holds it, because a wedged leaf holds no period at all.

Closers, seals and gaps: what the pavilion period rests on

Three things carry the hour on an FD60 leaf, the closer pulling it shut, the seals meeting the frame and the gaps staying narrow, because flame slips through a leaf left ajar in seconds and through a wide gap soon after. The closer on the leaf holds a proof to BS EN 1154, where EN 1 is the smallest power size the standard names and EN 3 is the lowest size a fire door takes.

Once the temperature at the frame passes 200 degrees and before it reaches 250, the seal swells across the gap and blocks flame and hot gas from slipping past the leaf. A gauge held against the gap round a hung leaf on the monthly walk shows at once when the 4 mm gap has opened wider. How the seal is fitted is covered in the intumescent seals guide, what the closer must do in the fire door closers guide, and how the gaps are measured in the fire door gaps guide.

A fire leaf hangs on hinges proved to BS EN 1935, with grade 13 proved through 200,000 cycles under a leaf of 120 kg and grade 14 proved through the same cycles under a leaf of 160 kg, so the hinge suits the weight of the leaf it carries. The fire door signage guide names what each sign on a fire door must say, and the fittings proved with the leaf are named in the fire door hardware guide.

The cricket club fire door order: every leaf, its period and its proof

The whole fire door order sits on one list, with a line for every opening that names the leaf, the period, the lock and the closer beside it. One leaf named for the whole pavilion leaves the fitter to guess.

Each leaf on the order is read through before the order is signed, because a closer that arrives after the doorset holds the job up and a leaf with no line beside it cannot be checked on arrival.

The club secretary takes the door list round the pavilion each month and works each leaf in turn, and a dragging leaf, a closer that leaves the leaf standing open and a seal painted over each go beside their own door on the list the day they are found, so the fault is put right before the leaf must hold. What to look for on each leaf is named in the fire door inspection checklist, and the work that keeps the leaves holding is covered in the fire door maintenance guide.

The period on a cricket pavilion leaf follows the room behind it, so the FD60 and FD30 leaves sit on the same list as the grade and the lock for each leaf.

What period should a cricket club kitchen door carry?

FD60 to EN 1634-1, because the cookers sit behind the kitchen leaf, and sixty minutes is the hold that room asks for.

What period should a changing room door carry?

FD30 to EN 1634-1, because the changing room leaf holds the room clear while players fetch their kit, and half an hour is the hold that room demands.

Can one leaf hold fire and forced entry?

Yes, where the same leaf was proved in the fire test and in the forced entry test, so the period and the grade stand in one report together.

Do cricket pavilion fire doors need a smoke rating?

Yes, Sa or S200 to BS EN 1634-3 sits beside the period on the leaves of the way out, because smoke reaches people leaving the pavilion before flame does.

What happens when a fire door will not shut?

A leaf that will not shut goes beside its own door on the list the day the fault is found, and the pavilion does not wait for the next look round before the leaf is put right.

Specifying fire doors for a cricket club?Send the door list with the period and the lock each room must hold for a tested door quotation.
Get a free quote

Related

More in guides for specifiers

10 mistakes when specifying certified security doors 10 steps to specify an LPS 1175 door Acceptance and Snagging of a Security Door or Barrier Job Access Control Doors Acoustic Doors: Ratings and Specification After a Forced Entry Attempt: Checking a Security Door Airport Security Doors Anti-Ligature Doors for Mental Health Wards Anti-Ram Bollards Anti-ram gates and barriers: protecting vehicle entrances Arcade Security Doors Explained Automatic Doors Automatic Gates Cost Factors Automatic Vehicle Barriers Ballistic Panels Bank Security Doors Bingo Hall Security Doors Explained Blast doors: glazed vs solid and how they are rated Blast protection window film: what it does and what it cannot do Blast resistant windows: what drives the cost and how to specify them Bollard Cost Factors Explained Bollard regulations in the UK: spacing, height and depth Bookmaker Security Doors Explained Builders Merchant Security Doors Bullet Resistant Glass Cost Factors Bullet resistant glass ratings explained: BR1 to BR7 and SG classes Bullet resistant vs bulletproof glass: what the difference means Buying Security Doors and HVM Through Public Frameworks Car Park Security Doors Explained Car Showroom Security Doors Casino Security Doors Explained CDM 2015 Duties When Security Doors, Shutters or HVM Are Installed Cinema Security Doors Cleanroom Doors Cold Store Doors College Security Doors Commissioning, Handover and the O&M Manual for Security Doors and HVM Communal entrance doors for flats: Secured by Design and what to specify Community Centre Security Doors Control Room Doors Court Security Doors Crash Rated Fences and HVM Fencing Explained Data centre physical security: doors, glazing, HVM and shielding by zone Dental Practice Security Doors Depot Security Doors Explained Door Entry Systems Due Diligence When Selecting Vehicle Security Barriers Emergency Exit Doors EMP Shielding Cost Factors Explained Exhibition Centre Fire Door Rules Exhibition Centre Security Doors Factory Security Doors Faraday cage vs RF shielded room: what a business needs FB4 vs FB6 vs FB7: how to choose a ballistic rating Fire and security doors: how dual certification works Fire Compartmentation Fire Curtains Fire Door Certification Fire Door Closers Explained Fire Door Cost Factors Fire Door Duties of the Accountable Person Fire Door Gaps Fire Door Hardware Explained Fire door inspection checklist for steel and timber doors Fire Door Maintenance Fire Door Regulations Care Homes Fire Door Regulations for A and E Departments Fire Door Regulations for Airports Explained Fire Door Regulations for Bowls Clubs Fire door regulations for commercial buildings in the UK Fire Door Regulations for Dialysis Centres Fire Door Regulations for Hockey Clubs Fire Door Regulations for Hospitals Explained Fire Door Regulations for Offices Explained Fire Door Regulations for Operating Theatres Fire Door Regulations for Retail Explained Fire Door Regulations for Schools Explained Fire Door Regulations for Snooker Clubs Fire Door Regulations for Stadiums Fire Door Regulations for Student Accommodation Fire Door Regulations for Warehouses Fire Door Regulations Leisure Centres Fire Door Regulations Restaurants Fire Door Remediation Programme for Housing Providers Fire Door Rules for Badminton Clubs Fire Door Rules for Bingo Halls Fire Door Rules for Bookmakers Fire Door Rules for Bowling Alleys Fire Door Rules for Car Parks Fire Door Rules for Car Showrooms Fire Door Rules for Cinemas Fire Door Rules for Climbing Centres Fire Door Rules for Colleges Fire Door Rules for Community Centres Fire Door Rules for Dental Practices Fire Door Rules for Depots Explained Fire Door Rules for Golf Clubs Fire Door Rules for GP Surgeries Fire Door Rules for Gyms Explained Fire Door Rules for Ice Rinks Fire Door Rules for Maternity Units Fire Door Rules for Mental Health Units Fire Door Rules for Museums Fire Door Rules for Oncology Units Fire Door Rules for Opticians Fire Door Rules for Pawnbrokers Fire Door Rules for Petrol Stations Fire Door Rules for Pharmacies Fire Door Rules for Ports Fire Door Rules for Post Offices Fire Door Rules for Prisons Fire Door Rules for Rehabilitation Centres Fire Door Rules for Self Storage Fire Door Rules for Shopping Centres Fire Door Rules for Squash Clubs Fire Door Rules for Supermarkets Fire Door Rules for Swimming Pools Fire Door Rules for Tennis Clubs Fire Door Rules for Theatres Fire Door Rules for UK Arcades Fire Door Rules for UK Casinos Fire Door Rules for UK Hospices Fire Door Rules for Walk-in Centres Fire Door Signage Fire Door Vision Panels Fire Doors and Gateway 2 in Higher-Risk Buildings Fire Rated Glass Cost Explained Fire Rated Sliding Doors Explained Fire Rated Windows Cost Factors Fire Rated Windows Explained Fire Safety Enforcement Notices and Fire Doors: What the Responsible Person Must Do Flat Entrance Doors: PAS 24 and Fire Rated Forced Entry vs Ballistic vs Blast: Which Rating a Site Needs Garage Security Doors Explained Gate Automation Explained Golden Thread Records for Fire Doors GP Surgery Security Doors Explained Gym Security Doors Explained High Speed Doors HMO Fire Doors Hospice Security Doors Explained Hospital Security Doors: Wards, A&E, Plant Hospital Security Gates Hotel Fire Doors Hotel Security Doors How to choose HVM bollards: fixed, shallow mount, removable and automatic How to keep an LPS 1175 door rating valid after installation How to Specify Fire Doors in a Housing Tender How to specify security doors: a checklist for architects How to Verify a Secured by Design Listing How to Verify an LPS 1175 Certificate on Red Book Live How to Write an Operational Requirement for Physical Security HVM planters and street furniture: protection that blends in In-Service Care of Vehicle Security Barriers Installation Handover: LPS 1175 Doors and PAS 68 Barriers Intumescent Seals ISO 16933 explained: EXV and SB classes and hazard ratings ISO 22343 vehicle security barriers explained Keeping a Dual-Certified Fire and Security Door Valid in Service Laboratory Security Doors Layered Security for a Site: Deter, Detect, Delay, Mitigate, Respond Lead Times and Programme Risks for LPS 1175 Doors Leisure Centre Security Doors Library Security Doors Listed Building Fire Doors Loading Bay Doors Explained Lockdown and Access Control Hardware on an LPS 1175 Door LPS 1175 Gates and Grilles Explained LPS 1175 Issue 8 explained: from SR1 to SR8 to A1 to H20 LPS 1175 Roller Shutters LPS 1175 vs ASTM F2781 and Other US Ratings Explained LPS 1175 vs EN 1627: how UK and European burglar resistance ratings compare LPS 1175 vs PAS 24: which security standard does your door need? LPS 1175 Windows and Walling Explained Martyn’s Law and Places of Worship: What a Buyer Checks for Doors and Entry Control Martyn’s Law Enhanced Tier: Physical Measures and the Specifier Brief Martyn’s Law Standard Tier: Procedures, Doors and Shutters Martyn’s Law Timeline and the SIA Regulator Martyn’s Law: what premises must do and which physical measures to consider Master Key Systems MRI and RF shielded rooms: how they work and what to specify Museum Security Doors NPSA Catalogue of Security Equipment (CSE) Explained NPSA Forced Entry and Blast Guidance for Government Sites NPSA Guidance on Lockdown and Marauding Attack: What It Asks of Doors and Entrances Office Security Doors Optician Security Doors Explained Panic Hardware PAS 24 requirements for doors and windows explained PAS 68 Bollard Foundations Explained PAS 68 bollards: ratings, spacing and cost factors PAS 68 vs IWA 14 vs ISO 22343: hostile vehicle mitigation standards explained Pawnbroker Security Doors Explained Pedestrian Gates Petrol Station Security Doors Pharmacy Security Doors Planning Permission for Security Shutters, Gates and Bollards on Commercial Premises Plant room doors: fire, security and ventilation requirements Plant Room Fire Doors Port Security Doors Post Office Security Doors Explained Powder coating vs galvanising vs paint for steel Preliminary Market Engagement for Security Doors and HVM Prison Security Doors Programming a Security Door and Barrier Package on a Live Site Public-Sector Tender Response Checklist for Security Door and HVM Supply Reading a PAS 24 and SBD Door Test Report Regulation 38 Fire Safety Information at Handover for Fire-Rated Security Doorsets Replacing Security Doors in an Occupied Building Restaurant Security Doors Retail Security Doors Revolving Doors RF shielding standards and how shielded rooms are tested Rising Bollard Cost Factors Road Blocker Cost Factors Explained Road Blockers Explained Roller Shutter Cost Factors: What Drives the Price Roller shutter regulations in the UK: safety and maintenance Safe room and panic room doors: specification basics Safety Duties for Powered Doors, Gates and Barriers on Commercial Sites School Security Doors Sectional Doors Secured by Design explained: is it mandatory for doors? Secured by Design vs NPSA vs LPCB: Which One You Need Security Door Locks Security Door Maintenance Checklist Security Doors and Access for Everyone: What Approved Document M Asks Security Doors for A and E Departments Security Doors for Badminton Clubs Security Doors for Bowling Alleys Security Doors for Bowls Clubs Security Doors for Climbing Centres Security Doors for Cricket Clubs Security Doors for Dialysis Centres Security Doors for Golf Clubs Security Doors for Hockey Clubs Security Doors for Ice Rinks Security Doors for Maternity Units Security Doors for Mental Health Units Security Doors for Oncology Units Security Doors for Operating Theatres Security Doors for Rehabilitation Centres Security Doors for Snooker Clubs Security Doors for Squash Clubs Security Doors for Swimming Pools Security Doors for Tennis Clubs Security Doors for Walk-in Centres Security Doors West Midlands Explained Security Fencing Security Gates Cost Factors Explained Security shutters vs high performance roller doors Security shutters vs retractable grilles: which suits retail and commercial openings? Security Turnstiles Explained Security Window Film Security Windows for Schools Explained Self Storage Security Doors Server Room Doors Explained Shopping Centre Security Doors Smoke Control Doors Explained Smoke Curtains Specification Mistakes When Mixing LPS 1175, PAS 24 and SBD in One Tender SR2 vs SR3 vs SR4 security doors: choosing the right LPS 1175 level Stadium Security Doors Steel Door Frames Steel vs aluminium security doors: strength, ratings and looks Steel vs timber fire doors: which suits your building? Student Accommodation Security Doors Substation doors: security, ventilation and specification Supermarket Security Doors Telescopic Bollards Tender Evaluation Criteria and Scoring for Security Doors and HVM The Scope of a Maintenance Contract for Security Doors and Barriers Theatre Security Doors Thermal and Weather Performance of External Security Doorsets Thermally broken steel security doors: U-values and certification Traffic Calming as Hostile Vehicle Mitigation Transport hub security requirements Turnstile Cost Factors Explained Turnstile vs speed gate vs security portal: choosing entrance control Types of security doors for commercial buildings University Security Doors Explained Vehicle Dynamics Assessment: What It Tells the Buyer Before a Barrier Is Specified Warehouse Security Doors Explained Warehouse Security Gates Warranty, Defects Liability and Guarantees for Security Doors and Barriers What affects the cost of a bullet resistant door What affects the cost of a high-security door in the UK Window Security Bars View all →

Products

One supplier for the whole building envelope

Ready to specify your project?

Free assessment, written specification and test evidence. Reply within one working day.