ArxBridge
What affects the cost of a high-security door in the UK
High-security door cost in the UK: what the rating, size, glazing, hardware and site access add to the figure, and what to send for an accurate quote.
- ✓Third-party test evidence with every product
- ✓Written specification you can issue to tender
- ✓Supplied and installed across the UK
Get a free project quote
Rating, written specification and budget range within one working day.
Confidential. No cost, no obligation.
Third-party tested
Evidence with every quote
UK manufactured
Made to your sizes
One accountable team
Specify, supply, install
Confidential handling
Details never shared
The cost of a high-security door in the UK comes down to the rating you specify, the size and build of the doorset, and what goes into it: glazing, hardware, access control and finishes. Installation access and lead time shape the figure too. This guide breaks down each driver and explains what to send for an accurate quote.
- RatingLPS 1175 classes, ballistic ratings and fire periods set the baseline.
- DoorsetLeaf, frame, hardware and glazing are priced as one tested assembly.
- Quote inputDrawings, ratings, quantities and access notes give a like-for-like figure.
- Lead timeMade-to-order doorsets follow the survey and the specification.
The rating sets the starting point
Every high-security door starts with a threat, and the threat decides the rating. LPS 1175 Issue 8 grades forced-entry resistance from A1 up to H20: B3 (the old SR2) resists basic hand tools for three minutes, C5 (SR3) adds crowbars and drills for five, and D10 (SR4) stands up to sledgehammers and disc cutters for ten. Each step up means more steel, more weight and more testing, which is why the rating is the single biggest cost driver.
Ballistic and fire ratings work the same way. EN 1522 classes run from FB1 (.22 LR) to FB7 (armour-piercing 7.62×51), and each class changes the leaf construction. A doorset that also carries a fire rating, such as an EI60 assembly, has passed two demanding test regimes, and the evidence for both must cover the same build. Our LPS 1175 guide explains the full rating table, and SR3 and SR4 doors show what the middle of the range looks like in practice.
The simplest way to control this driver is to match the rating to the risk. A plant room and a cash office rarely need the same class. Rating each doorset to its threat, opening by opening, keeps material where it matters instead of spreading it across the whole schedule.
Size, leaf type and configuration
Size drives material directly. A standard single leaf uses far less steel and fabrication time than a double doorset or an oversized opening, and anything outside standard dimensions is made to order. Pairs of doors need meeting stiles, coordinated locking and heavier frames, all of which add work at the bench.
The leaf type matters too. A solid steel leaf is the simplest build. Add a vision panel and the glazing must carry its own rating: LPS 1270 rated glazing is tested against hand-hole, arm-hole and body-passage attacks, and setting it into a rated leaf takes care. Louvred leaves, such as our steel louvred doors, ventilate plant areas but need the louvre bank inside the tested construction.
Screens and side panels around the door count as well. If the entrance includes glazed side lights or a fanlight, those elements need the same rating as the door, or the weak point simply moves sideways and the money spent on the leaf is wasted.
Glazing, hardware and access control
Hardware is where specifications quietly grow. A basic mechanical lockset is one thing; a full access-control package with electric strikes, maglocks, card readers and monitored alarms is another. Each device needs power, cabling and a tested method of fixing it to the leaf without breaking the rating, and that engineering sits in the price.
Cylinders deserve their own line in your thinking. High-security cylinders with anti-drill and anti-snap features protect the locking point that attackers test first. Multi-point locking spreads the load across the leaf edge but adds mechanisms, keeps and alignment work.
Access control integration should be decided before manufacture, not after. Cutting a cable route or swapping a lock case on site can invalidate the test evidence for the doorset. Send the device schedule with the enquiry and the leaf is built around it from the start.
Finishes and combined ratings
A standard powder-coated finish is the baseline. Special colours, metallic effects, marine-grade systems for coastal sites and timber-effect finishes each add process steps. Our powder coating service covers the full range, but unusual finishes still extend the programme and the price follows.
Combined ratings multiply the testing behind the door. A doorset that is both LPS 1175 rated and fire rated to EI60, like our fire and security doors, must pass both regimes as one assembly. Acoustic performance adds seals and mass on top. Each added performance needs its own evidence, and evidence costs money to generate.
Ask whether every door needs every rating. A corridor door might need fire performance only, while the plant room door needs security. Splitting the performances across the schedule, instead of demanding everything everywhere, is legitimate value engineering.
Installation and site access
Installation is priced on access, not just on the door. A ground-floor opening with clear delivery access is straightforward. A doorset travelling to an upper floor, into a live ward or through a narrow basement corridor needs lifting plans, phased working and sometimes night shifts, and each of those adds labour.
On banking and cash-handling sites, out-of-hours installation is often mandatory rather than optional, which is worth knowing when you plan the programme. Flag the constraints in your enquiry so they are priced once, instead of being discovered on the day.
The survey fixes the unknowns before manufacture starts. We measure each opening, check the structure around it, note the access constraints and agree the installation plan. That is why a figure based on drawings alone always carries assumptions. Read how installation runs on occupied sites, and decide early whether making good, redecoration and disposal sit inside the quote or outside it.
Lead time and programme
Rated doorsets are made to order. Nobody stocks a D10 double doorset in your exact size with your hardware, so the programme runs from survey through manufacture to installation. Higher ratings and unusual configurations take longer because the build is more complex and the checks are stricter.
Test evidence can also set the pace. A standard rating combination with existing evidence moves quickly. A combination that needs fresh witness testing carries that testing on the critical path, so name unusual combinations early.
Programme pressure is a cost driver in disguise. A rushed manufacture slot or an installation forced into night working costs more than the same work on a sensible programme. Send the enquiry early and the programme works for you rather than against you.
What to send for an accurate quote
The fastest route to a firm figure is a complete enquiry. Send the items below and we can price like for like, without the assumptions that make quotes drift apart.
| Send this | Why it matters |
|---|---|
| Opening sizes and quantities | Material and fabrication time follow the schedule |
| Rating: standard, issue and class | B3 and D10 are different doorsets, not one doorset at two prices |
| Leaf type: single, double, louvred or glazed | Configuration changes the frame, the locking and the weight |
| Hardware and access control schedule | Electric devices need power routes built into the leaf |
| Finish and colour | Special systems add process steps and time |
| Fire, acoustic or other performances | Combined ratings need combined evidence |
| Site access notes and programme dates | Delivery, lifting and working hours shape the installation |
| Drawings or photos of the openings | The survey starts from what you send us |
How to value-engineer without breaking the rating
Value engineering a rated doorset means removing cost, never performance. The rating is the promise the door makes, so every saving must leave the tested assembly intact. The levers below all work within that rule.
| Lever | The rule that keeps it safe |
|---|---|
| Standardise sizes across the schedule | Fewer unique doorsets means less set-up time in the works |
| One rating per risk zone, not per door | Group openings by threat instead of rating everything to the highest |
| Rationalise hardware sets | Three well-chosen sets beat twelve bespoke ones |
| Keep special finishes to visible doors | Back-of-house doors can take the standard finish |
| Fix the programme early | Sensible lead times avoid premium manufacture slots |
A rated leaf in an unrated frame is not a rated doorset. The rating covers the tested assembly, so savings must never split the leaf from its frame, hardware and fixings.
If a proposed saving touches the leaf construction, the hardware, the glazing or the fixings, ask for the test evidence that still covers the result. If none exists, the saving is not a saving. Our guide to specifying security doors shows how to write the schedule so these decisions are made once, and the specification mistakes guide lists the errors that quietly erase ratings. You can browse the full set of guides for related topics.
The steps up the scale: what each grade adds to the price
The price of a security doorset follows the rating first, because the rating decides the leaf, the frame, the lock and the test behind them. Under Issue 8.2, dated September 2024, B3 resists for three minutes, C5 for five and D10 for ten, and each step up the scale adds steel, fixings and test time to the order.
The size of the leaf adds to the price beside the rating, because a wide leaf takes a heavier frame, stronger hinges and a closer with the power to pull it shut. A double leaf takes two leaves, two sets of hinges and a meeting stile, and the pair costs more than two single leaves would, because the pair was proved together as one doorset.
Glazing adds to the price where the leaf must let light through, and the pane takes the same grade as the leaf beside it, because the attack moves to the weakest part of the door. The pane, the bead, the frame and the fixings go to the test as one doorset, and the report names each one. A vision panel takes the same period as the leaf, because a panel that holds less than the leaf leaves a hole in the proof.
Hardware adds to the price line by line, because the cylinder, the handle and the lock belong on the order beside the leaf. Drill-resistant cylinders take a 3-star set to TS 007, a 1-star cylinder with a 2-star handle. A reader and a fob add the access control beside the lock, and the panel, the reader and the release are named beside the door they serve.
The costs the first quote leaves out: fitting, access and the parts that follow
The first quote often leaves the fitting out, and fitting a doorset to an opening that is already in use costs more than ordering it with the building. The frame, the fixings and the seals take the time the opening demands, and a frame fitted to a wall that is out of square takes longer than a frame fitted to a true opening. The price of the fitting belongs on the quotation beside the doorset.
Access to the site adds to the price where the doorset must travel through a narrow stair, a lift or a corridor that will not take a full leaf. A doorset carried up five flights of stairs takes more hands than one carried through a ground floor door, and the delivery, the lifting and the time on site belong on the quotation before the order goes out.
The parts that follow the doorset add to the price after handover, because the closer, the seals and the lock wear with use. A closer that has lost its pull leaves the leaf standing open, and a seal painted over cannot swell, so the visit that looks after the doorset writes each fault beside the door it belongs to on the same day, and the repair is ordered while the fault is still small.
| Item | What moves the price | What to ask for | When |
|---|---|---|---|
| Rating | B3, C5, D10 | Steel, fixings, test time | Before the order |
| Leaf size | Wide or double leaf | Frame, hinges, closer | Before the order |
| Glazing | Pane, bead, fixings | The grade beside the leaf | Before the order |
| Hardware | Cylinder, handle, lock | The set proved as one | Before the order |
| Fitting | Frame, fixings, time on site | The fitting beside the doorset | On the quotation |
The columns the schedule needs are set out in how to specify security doors guide, and what breaks a rating once a door is fitted is set out in keeping an LPS 1175 rating valid guide. The sizes and the fitting of closers are covered in the fire door closers guide, and the issue behind the categories is set out in LPS 1175 Issue 8 explained guide.
What the quote does not include
A quote covers what it names, and the items it does not name are the ones that appear later. Making good around the opening, redecoration after the frame is fitted, disposal of the old door, and protection of the finished floor are often outside the figure. Ask whether each sits inside the quote or outside it, and get the answer in writing.
The survey is often outside the figure too. A quote based on drawings alone carries assumptions about the opening, the structure and the access, and the survey is what replaces those assumptions with measurements. A firm figure follows the survey, so a quote without one is a budget, not a price.
Access equipment is easy to miss. A doorset travelling to an upper floor, through a narrow corridor or into a live building needs lifting plans, phased working and sometimes night shifts. None of those appear in the leaf price, and each of them adds labour that only shows when the programme is agreed.
Out-of-hours working is the same. On banking and cash-handling sites, installation outside trading hours is often mandatory, and the premium for night working sits outside a standard quote. Flag the working hours in the enquiry, so they are priced once instead of discovered on the day.
And the hardware schedule is often quoted as a line, not as a list. A lockset, a closer, an electric strike and a card reader are four different devices with four different prices, and a quote that names only one of them leaves the rest to be added later. Send the device schedule with the enquiry, and ask for each device to be priced.
Mistakes that make a cheap quote expensive
Most expensive quotes start as the cheapest figure. The table below sets out the errors that appear most often.
| Mistake | Why it fails | What to do instead |
|---|---|---|
| Comparing a leaf price with a doorset price | One quote prices the leaf only, the other the tested assembly with frame and hardware | Ask every bidder to price the same scope |
| Accepting a quote with no hardware schedule | Electric devices need power routes built into the leaf, and adding them later breaks the rating | Send the device schedule with the enquiry |
| Skipping the survey to save time | Drawings carry assumptions the survey replaces, and the firm figure follows the survey | Let the survey lock the figure down |
| Quoting combined ratings as one test | Fire and security need separate evidence on the same construction, and each test costs | Ask for both certificates against one specification |
| Ignoring the programme | A rushed manufacture slot or night working costs more than the same work on a sensible programme | Send the enquiry early and fix the programme |
Compare quotes on the same scope, and the cheapest figure is rarely the cheapest doorset. For writing the schedule so these decisions are made once, see the guide to specifying security doors, and for the door side of the same discipline, see our bullet resistant door cost factors guide and the roller shutter cost factors guide. Where fire and security meet on one doorset, see the dual certification guide.
Frequently asked questions
Why do two quotes for the “same” door differ so much?
Because they rarely describe the same door. One quote may cover a complete installed doorset with tested hardware while the other prices a leaf only, or the ratings cited may differ. Ask each supplier to confirm the standard, issue and class, the full scope of supply, and whether installation and making good are included. Then the figures become comparable.
Does a higher LPS 1175 rating always cost more?
Each step up the scale adds material, weight and fabrication time, so a D10 doorset costs more than a B3 doorset of the same size. But the rating should follow the threat. Over-rating every opening wastes money, while under-rating the one door that matters most is a false economy.
Can I get a firm price from drawings alone?
Drawings get you close enough to set a budget. The firm figure follows the survey, which confirms opening sizes, the structure around each opening and the access constraints. Send drawings early for an indicative figure, then let the survey lock it down.
What adds the most to installation cost?
Access constraints: upper floors, restricted sites, occupied buildings and out-of-hours working. A straightforward ground-floor replacement can take a fraction of the time of a phased installation in a live building. Flag access issues in your enquiry so they are priced once, not discovered later.
How do I compare security door quotes fairly?
Line up the rating, the scope of supply, the hardware schedule and the installation terms side by side. Check that every quote names the standard, the issue and the class, and that disposal, making good and guarantees are treated the same way. The cheapest figure is rarely the cheapest doorset.
Get a free quote
Related
More in guides for specifiers
Products
One supplier for the whole building envelope
Ready to specify your project?
Free assessment, written specification and test evidence. Reply within one working day.