ISO 22343-1:2023 is the current vehicle barrier test standard. Read the rating field by field to see what it proves, and what it does not, before you specify.

  • ✓Third-party test evidence with every product
  • ✓Written specification you can issue to tender
  • ✓Supplied and installed across the UK
Prefer to talk?+44 7352 267239

Get a free project quote

Rating, written specification and budget range within one working day.

ArxBridge Quote Form

Confidential. No cost, no obligation.

Third-party tested

Evidence with every quote

UK manufactured

Made to your sizes

One accountable team

Specify, supply, install

Confidential handling

Details never shared

ISO 22343-1:2023 is the current international standard for testing vehicle security barriers. It sets the performance requirement, the vehicle impact test method and the performance rating for barriers built to stop a vehicle, and it is the designation to cite for new testing and new specifications. It cancels and replaces IWA 14-1:2013, and it supersedes PAS 68:2013. Test evidence earned under the older standards remains valid for the configuration tested. What changes is the reference for new work: a specification written today should name ISO 22343-1:2023 and the full rating, not the standard alone.

  • ISO 22343-1:2023Current international test standard
  • SupersedesIWA 14-1:2013 and PAS 68:2013
  • A rating statesVehicle, speed, angle, penetration, debris
  • Test vehicles1,500 kg car to 30,000 kg truck

What the standard covers

Part 1 covers the performance requirement, the vehicle impact test method and the performance rating. It applies to passive, active, portable and linear barriers that stop hostile vehicular access. A fixed bollard line, a rising blocker, a crash rated gate and a portable barrier unit all fall under the same test idea: a defined vehicle at a defined speed and angle, with the result measured afterwards.

Part 2 covers selection, installation and use, and it supersedes IWA 14-2 in the same way Part 1 supersedes IWA 14-1. Part 1 proves what a barrier stopped on the test track; Part 2 guides how it is chosen and installed on a real site.

The rating is a factual record of one test, not a grade on a scale. There is no ladder of levels of the kind LPS 1175 uses for doors, where A1, B3, C5 and D10 mark rising attack times. The test report is the only place the full conditions are recorded.

Reading the rating, field by field

The rating string reads left to right. Take V/7500[N3]/80/90:0/0 as the example: each part answers one question, and a rating with a field missing is incomplete. The seven fields are set out below.

Field What it states In this example
V Test method Vehicle impact test
7500 Vehicle mass (kg) 7,500 kg truck
[N3] Vehicle category N3
80 Impact speed 80 km/h
90 Impact angle 90 degrees, head on
:0 Penetration (m) 0 m, stopped
/0 Debris over 25 kg (m) 0 m, no debris

The first field, V, records that the barrier was tested with a real vehicle driven into it. PAS 68 also allowed simulated and pendulum tests, while IWA 14-1 used vehicle tests only.

The bracketed category names the class of the test vehicle: N3 is the heavy rigid truck here, beside the mass so a checker can see the weight and the kind of vehicle tested.

The two figures after the colon are the result. The first is penetration, the distance the vehicle travelled past the barrier line before it stopped, in metres. Zero means the vehicle did not get past the line. The second is debris dispersion, the furthest distance debris over 25 kg travelled, also in metres. Read the whole string together: a heavy vehicle at low speed can be a milder test than a lighter vehicle at high speed.

Need this specified for your project?Free rating, written specification and budget range within one working day.
Get a free quote

The test vehicles behind the numbers

The test vehicle is chosen to match the threat the site faces. A city centre pavement scheme may be tested against a car, while a power station is tested against a heavy goods vehicle. The common test vehicles run from a 1,500 kg car and a 2,500 kg 4×4, through a 3,500 kg van, to a 7,200 or 7,500 kg rigid truck and a 30,000 kg heavy truck.

The common test speeds are 48, 64 and 80 km/h, set by the threat assessment and the site layout. Impact energy rises steeply with speed, so the speed figure matters as much as the vehicle mass, and a barrier rated against a truck at 48 km/h has not demonstrated anything about the same truck at 80 km/h. The angle matters too: a glancing blow and a head-on impact load the barrier differently, and ninety degrees is the most severe case for most barriers.

Why the heavy truck weighs 7,200 kg in one rating and 7,500 kg in another

The two masses come from the two parent documents. PAS 68, the UK specification, tested the heavy rigid truck at 7,500 kg, while IWA 14-1, the international agreement, tested it at 7,200 kg and used the category N3C. The difference is a legacy of the two traditions the ISO standard brought together.

That difference is why ratings must be compared field by field, never by label alone: a 7,500 kg rating and a 7,200 kg rating describe different tests, even when the other figures look the same. The penetration datum also differs, PAS 68 measuring from the rear face and IWA 14-1 from the front face, so the same test could produce two different figures.

Debris is another split. PAS 68 recorded debris dispersion; IWA 14-1 did not, so an IWA 14-1 rating has no second figure after the colon, and a checker should not treat the missing figure as zero. ISO 22343-1 carries the full format forward, with penetration and debris both reported.

What the rating does not prove

The rating proves what happened to one barrier, in one foundation, on one test track. The foundation is part of the tested system, so a tested barrier in an untested foundation has no rating. A rating earned in a deep reinforced foundation does not transfer to a shallow retrofit or a different soil.

The rating also says nothing about the wall or fence beside the barrier. A rated bollard line with an unrated fence beside it leaves a gap a vehicle can drive through. The whole line has to be designed as one system, with every metre of the approach covered.

The rating says nothing about the approach speed and angle on the real site either. A test at 90 degrees and 80 km/h proves the barrier against that impact, not against a vehicle arriving at a different angle or speed. The threat assessment has to set the real approach speed from the road layout, and the rating has to match it.

A rating belongs to the tested configuration. If the foundation, the spacing or the fixings differ from the test, the rating does not travel with the barrier, and the difference needs fresh evidence or a formal assessment from the test house.

Where the standard is used

The standard is used wherever a vehicle must be stopped before it reaches people or a building: perimeter lines around a site, forecourts in front of entrances, and venue frontages where crowds gather. Products run from fixed and removable security bollards and road blockers to crash rated gates and rated street furniture.

Transport hubs are a common case, because stations and airports combine vehicle approaches with crowds. A barrier line at a station forecourt has to stop the threat vehicle and keep debris away from the entrance. The same applies to public spaces and government sites, and any venue frontage where a vehicle could reach a crowd.

Martyn’s Law adds a legal reason to get the frontage right. Premises fall into the standard tier at 200 to 799 people and the enhanced tier at 800 or more, with the SIA as regulator, and venues in scope must plan for a vehicle attack. A rated barrier line at the frontage is one measure that plan can name. The Martyn’s Law guide for premises sets out the tiers and what they require, and the ProtectUK hostile vehicle mitigation guidance sets out how barrier lines, spacing and layout work together.

PAS 68 and ISO 22343-1 on one order: what changed

ISO 22343-1:2023 supersedes PAS 68:2013, and the change is a new rating, not a new barrier. A barrier proved to PAS 68 was proved against a vehicle, a speed and a penetration distance, and a barrier proved to ISO 22343-1 is proved against the same three things, so the rating on the order still names the vehicle, the speed and how far the vehicle moved past the line.

The rating reads from left to right, and every field matters. A rating such as V/7500[N3]/80/90:0/0 names a 7,500 kg vehicle at 80 km/h, an impact angle of 90 degrees, and no penetration and no debris past the line. A rating read without the last fields is a rating read half way, because the figures after the colon name what the barrier stopped.

Test speeds run at 48, 64 and 80 km/h, and the test vehicles run from a 1,500 kg car to a 30,000 kg truck, so the rating the order names must match the road the barrier guards, not the barrier the catalogue shows first. A barrier ordered for a slow yard proves nothing about a barrier that faces a fast road.

An old PAS 68 rating on a drawing is not a wrong rating, but the order carries the ISO 22343-1 rating beside it, so the barrier that arrives is the barrier the current standard names. The two ratings sit on the same schedule, and the schedule names which one the order follows.

The gap between the barriers: the 1,200 mm line the rating forgets

A rating proves one barrier, and the line between the barriers is proved by the gap. The clear gap between two barriers must stay at or below 1,200 mm, so no vehicle passes between them, and each barrier must stand at least 500 mm high, so no vehicle passes over it. A line of barriers with a gap wider than 1,200 mm is a line with a hole in it, whatever each barrier holds on its own.

The gap is measured on the site, not on the drawing, because the ground the barriers stand in is never as flat as the drawing shows. A barrier set on a slope or beside a kerb leaves a wider gap than the drawing allows, so the survey walks the line and measures each gap before the order is placed.

Step What it names What to check When
Approach Run-up, bends, junctions Speed a vehicle can reach Before the order
Vehicle Mass and speed the site faces Rating matches the road Before the order
Rating Vehicle, speed, penetration All fields on the order Before the order
Gap 1,200 mm max, 500 mm min height Measured on the site Before the order
Foundation Depth, size, ground in the test Site ground matches the test Before the order

The old rating and what it asks of the whole line is covered in the PAS 68 bollards guide, and the line as one system is covered in the choosing HVM bollards guide. The gates that must stop a vehicle as well as a person are covered in the LPS 1175 gates and grilles guide, and the line as a whole is set out in the hostile vehicle mitigation guide.

How to write the requirement

Name the standard and the full rating, never the standard alone: “Tested to ISO 22343-1” says nothing about the threat. The rating string carries the vehicle, the speed, the angle and the penetration, and that is what the design stands on. Write one line per product, then add the arrangement, spacing, line layout and foundation, as tested.

Require the certificate naming the exact barrier and the exact foundation, as supplied, including sleeves, finishes and fixings, and the foundation type and depth from the test. A certificate naming a different model, or a foundation the site cannot build, is not evidence for the barrier being ordered.

Check the foundation design against the test before the order is placed. The installation page covers the ground conditions a rated barrier needs, and installers should confirm the depth, reinforcement and ground interface match the test report. Where services or shallow ground force a different foundation, use a shallow mount unit tested in that arrangement, not a deep foundation rating applied to a shallow hole.

Ask for the test report and read it, not just the certificate summary: it records the exact product, the vehicle, the speed, the angle, the ground conditions and the measured penetration and debris. For entry points, security gates and sliding vehicle gates carry the same requirement: the rating must name the gate as supplied, in its tested foundation.

Reading a supplier claim that names only one standard

One test certifies one standard: a product tested to PAS 68 carries a PAS 68 rating, and not automatically an ISO 22343-1 rating. Writing “tested to PAS 68 / IWA 14-1” for a product tested to only one of them is inaccurate, and a checker will ask for the report. The HVM standards guide explains how the three designations relate.

Old evidence is still good evidence for what it tested: a bollard or gate tested to PAS 68 or IWA 14-1 keeps its evidence for the configuration tested. If a tender still names PAS 68, ask whether ISO 22343-1 evidence is acceptable before excluding a product on paperwork alone.

The direction of travel is clear: PAS 68:2013 was superseded by BS ISO 22343-1:2023, and IWA 14-1:2013 was cancelled and replaced by ISO 22343-1:2023. New testing should be carried out to ISO 22343-1. During the transition, keep clear records, noting the date and the standard on every test report filed.

Is a PAS 68 certificate still valid?

Yes. PAS 68:2013 was superseded by BS ISO 22343-1:2023, but test evidence already earned remains valid for the configuration tested. New testing should be carried out to ISO 22343-1:2023.

What does 0/0 after the colon mean?

The first figure is penetration in metres: 0 means the vehicle did not pass the barrier line. The second is debris dispersion in metres: 0 means no debris over 25 kg passed the line.

Why does the heavy truck weigh 7,200 kg in one rating and 7,500 kg in another?

PAS 68 tested the heavy rigid truck at 7,500 kg, IWA 14-1 at 7,200 kg. The difference comes from the two parent documents, so compare the raw figures, not the labels.

Does the rating cover the foundation?

The rating describes the tested arrangement, and the test report states the ground and fixing conditions used. A tested barrier in an untested foundation has no rating.

Which standard should a new specification name?

ISO 22343-1:2023, with the full rating string. Name the standard the evidence supports, and require the certificate naming the exact barrier and foundation.

The penetration figure: what the numbers after the colon mean

A rating such as V/7500[N3]/80/90:0/0 reads from left to right, and every field matters. The first field names the vehicle and its mass, the second names the impact speed, the third names the impact angle, and the figures after the colon name the penetration distance and the debris. A rating read without the last fields is a rating read halfway, and a barrier chosen on half a rating is a barrier chosen on a guess.

The heavy truck weighs 7,200 kg in one rating and 7,500 kg in another, and both figures appear in real ratings. The difference sits in the test vehicle the rating names, not in a mistake, so the rating must be read whole: the vehicle, the mass, the speed and the angle together decide what the barrier stopped. A claim that names only the mass has left out the speed, and a claim that names only the speed has left out the mass.

The current vehicle barrier test standard is ISO 22343-1:2023, which supersedes PAS 68:2013 and cancels and replaces IWA 14-1:2013. The test uses vehicles from a 1,500 kg car to a 30,000 kg truck, at speeds of 48, 64 and 80 km per hour. Ask for the test report naming the barrier, the foundation and the ground, because the rating belongs to the whole system, not to the post alone.

Matching the barrier to the approach, not to the catalogue

A barrier should be chosen for the approach it faces, not for the highest rating in the catalogue. A road where vehicles travel at 30 km per hour asks a different question from a road where they travel at 80 km per hour, and the run-up, the angle and the vehicle mix all change the test speed to specify. A barrier rated at 80 km per hour on a 30 km per hour approach costs more than the opening asks for, and a barrier rated at 48 km per hour on an 80 km per hour approach fails the approach.

Walk the approach before ordering, and note the speed vehicles reach, the angle they would take and the ground the barrier will fix into. A straight run-up lets a vehicle reach full speed, and a bend or a junction slows it before the line. The foundation, the posts and the fixings belong on the same schedule as the barrier, so a change to one part is checked against the rest.

ProtectUK guidance sets the maximum clear gap between barriers in a line at 1,200 mm and the minimum height at 500 mm, so check the whole frontage. A gap wider than 1,200 mm lets a vehicle through between two rated barriers, and a line with a gap in it has no rating at all. Our HVM standards guide works through PAS 68, IWA 14-1 and ISO 22343-1 side by side, and our road blockers guide sets out the barriers that close a vehicle route.

Field What it names What to check
Vehicle and mass Vehicle type and test mass The mass must match the threat
Speed Impact speed in km per hour The speed must match the approach
Angle Impact angle, usually 90 degrees A different angle changes the result
Penetration Distance past the line, after the colon Zero penetration is the strictest result

Ask for the test report with the barrier, and file it with the design and the ground survey, so the next specifier can see what the rating rests on.

Specifying vehicle security barriers?Send the threat vehicle, the approach speed and the site constraints for a quote on a tested barrier line.
Get a free quote

Related

More in guides for specifiers

10 mistakes when specifying certified security doors 10 steps to specify an LPS 1175 door Acceptance and Snagging of a Security Door or Barrier Job Access Control Doors Acoustic Doors: Ratings and Specification After a Forced Entry Attempt: Checking a Security Door Airport Security Doors Anti-Ligature Doors for Mental Health Wards Anti-Ram Bollards Anti-ram gates and barriers: protecting vehicle entrances Arcade Security Doors Explained Automatic Doors Automatic Gates Cost Factors Automatic Vehicle Barriers Ballistic Panels Bank Security Doors Bingo Hall Security Doors Explained Blast doors: glazed vs solid and how they are rated Blast protection window film: what it does and what it cannot do Blast resistant windows: what drives the cost and how to specify them Bollard Cost Factors Explained Bollard regulations in the UK: spacing, height and depth Bookmaker Security Doors Explained Builders Merchant Security Doors Bullet Resistant Glass Cost Factors Bullet resistant glass ratings explained: BR1 to BR7 and SG classes Bullet resistant vs bulletproof glass: what the difference means Buying Security Doors and HVM Through Public Frameworks Car Park Security Doors Explained Car Showroom Security Doors Casino Security Doors Explained CDM 2015 Duties When Security Doors, Shutters or HVM Are Installed Cinema Security Doors Cleanroom Doors Cold Store Doors College Security Doors Commissioning, Handover and the O&M Manual for Security Doors and HVM Communal entrance doors for flats: Secured by Design and what to specify Community Centre Security Doors Control Room Doors Court Security Doors Crash Rated Fences and HVM Fencing Explained Data centre physical security: doors, glazing, HVM and shielding by zone Dental Practice Security Doors Depot Security Doors Explained Door Entry Systems Due Diligence When Selecting Vehicle Security Barriers Emergency Exit Doors EMP Shielding Cost Factors Explained Exhibition Centre Fire Door Rules Exhibition Centre Security Doors Factory Security Doors Faraday cage vs RF shielded room: what a business needs FB4 vs FB6 vs FB7: how to choose a ballistic rating Fire and security doors: how dual certification works Fire Compartmentation Fire Curtains Fire Door Certification Fire Door Closers Explained Fire Door Cost Factors Fire Door Duties of the Accountable Person Fire Door Gaps Fire Door Hardware Explained Fire door inspection checklist for steel and timber doors Fire Door Maintenance Fire Door Regulations Care Homes Fire Door Regulations for A and E Departments Fire Door Regulations for Airports Explained Fire Door Regulations for Bowls Clubs Fire door regulations for commercial buildings in the UK Fire Door Regulations for Dialysis Centres Fire Door Regulations for Hockey Clubs Fire Door Regulations for Hospitals Explained Fire Door Regulations for Offices Explained Fire Door Regulations for Operating Theatres Fire Door Regulations for Retail Explained Fire Door Regulations for Schools Explained Fire Door Regulations for Snooker Clubs Fire Door Regulations for Stadiums Fire Door Regulations for Student Accommodation Fire Door Regulations for Warehouses Fire Door Regulations Leisure Centres Fire Door Regulations Restaurants Fire Door Remediation Programme for Housing Providers Fire Door Rules for Badminton Clubs Fire Door Rules for Bingo Halls Fire Door Rules for Bookmakers Fire Door Rules for Bowling Alleys Fire Door Rules for Car Parks Fire Door Rules for Car Showrooms Fire Door Rules for Cinemas Fire Door Rules for Climbing Centres Fire Door Rules for Colleges Fire Door Rules for Community Centres Fire Door Rules for Cricket Clubs Fire Door Rules for Dental Practices Fire Door Rules for Depots Explained Fire Door Rules for Golf Clubs Fire Door Rules for GP Surgeries Fire Door Rules for Gyms Explained Fire Door Rules for Ice Rinks Fire Door Rules for Maternity Units Fire Door Rules for Mental Health Units Fire Door Rules for Museums Fire Door Rules for Oncology Units Fire Door Rules for Opticians Fire Door Rules for Pawnbrokers Fire Door Rules for Petrol Stations Fire Door Rules for Pharmacies Fire Door Rules for Ports Fire Door Rules for Post Offices Fire Door Rules for Prisons Fire Door Rules for Rehabilitation Centres Fire Door Rules for Self Storage Fire Door Rules for Shopping Centres Fire Door Rules for Squash Clubs Fire Door Rules for Supermarkets Fire Door Rules for Swimming Pools Fire Door Rules for Tennis Clubs Fire Door Rules for Theatres Fire Door Rules for UK Arcades Fire Door Rules for UK Casinos Fire Door Rules for UK Hospices Fire Door Rules for Walk-in Centres Fire Door Signage Fire Door Vision Panels Fire Doors and Gateway 2 in Higher-Risk Buildings Fire Rated Glass Cost Explained Fire Rated Sliding Doors Explained Fire Rated Windows Cost Factors Fire Rated Windows Explained Fire Safety Enforcement Notices and Fire Doors: What the Responsible Person Must Do Flat Entrance Doors: PAS 24 and Fire Rated Forced Entry vs Ballistic vs Blast: Which Rating a Site Needs Garage Security Doors Explained Gate Automation Explained Golden Thread Records for Fire Doors GP Surgery Security Doors Explained Gym Security Doors Explained High Speed Doors HMO Fire Doors Hospice Security Doors Explained Hospital Security Doors: Wards, A&E, Plant Hospital Security Gates Hotel Fire Doors Hotel Security Doors How to choose HVM bollards: fixed, shallow mount, removable and automatic How to keep an LPS 1175 door rating valid after installation How to Specify Fire Doors in a Housing Tender How to specify security doors: a checklist for architects How to Verify a Secured by Design Listing How to Verify an LPS 1175 Certificate on Red Book Live How to Write an Operational Requirement for Physical Security HVM planters and street furniture: protection that blends in In-Service Care of Vehicle Security Barriers Installation Handover: LPS 1175 Doors and PAS 68 Barriers Intumescent Seals ISO 16933 explained: EXV and SB classes and hazard ratings Keeping a Dual-Certified Fire and Security Door Valid in Service Laboratory Security Doors Layered Security for a Site: Deter, Detect, Delay, Mitigate, Respond Lead Times and Programme Risks for LPS 1175 Doors Leisure Centre Security Doors Library Security Doors Listed Building Fire Doors Loading Bay Doors Explained Lockdown and Access Control Hardware on an LPS 1175 Door LPS 1175 Gates and Grilles Explained LPS 1175 Issue 8 explained: from SR1 to SR8 to A1 to H20 LPS 1175 Roller Shutters LPS 1175 vs ASTM F2781 and Other US Ratings Explained LPS 1175 vs EN 1627: how UK and European burglar resistance ratings compare LPS 1175 vs PAS 24: which security standard does your door need? LPS 1175 Windows and Walling Explained Martyn’s Law and Places of Worship: What a Buyer Checks for Doors and Entry Control Martyn’s Law Enhanced Tier: Physical Measures and the Specifier Brief Martyn’s Law Standard Tier: Procedures, Doors and Shutters Martyn’s Law Timeline and the SIA Regulator Martyn’s Law: what premises must do and which physical measures to consider Master Key Systems MRI and RF shielded rooms: how they work and what to specify Museum Security Doors NPSA Catalogue of Security Equipment (CSE) Explained NPSA Forced Entry and Blast Guidance for Government Sites NPSA Guidance on Lockdown and Marauding Attack: What It Asks of Doors and Entrances Office Security Doors Optician Security Doors Explained Panic Hardware PAS 24 requirements for doors and windows explained PAS 68 Bollard Foundations Explained PAS 68 bollards: ratings, spacing and cost factors PAS 68 vs IWA 14 vs ISO 22343: hostile vehicle mitigation standards explained Pawnbroker Security Doors Explained Pedestrian Gates Petrol Station Security Doors Pharmacy Security Doors Planning Permission for Security Shutters, Gates and Bollards on Commercial Premises Plant room doors: fire, security and ventilation requirements Plant Room Fire Doors Port Security Doors Post Office Security Doors Explained Powder coating vs galvanising vs paint for steel Preliminary Market Engagement for Security Doors and HVM Prison Security Doors Programming a Security Door and Barrier Package on a Live Site Public-Sector Tender Response Checklist for Security Door and HVM Supply Reading a PAS 24 and SBD Door Test Report Regulation 38 Fire Safety Information at Handover for Fire-Rated Security Doorsets Replacing Security Doors in an Occupied Building Restaurant Security Doors Retail Security Doors Revolving Doors RF shielding standards and how shielded rooms are tested Rising Bollard Cost Factors Road Blocker Cost Factors Explained Road Blockers Explained Roller Shutter Cost Factors: What Drives the Price Roller shutter regulations in the UK: safety and maintenance Safe room and panic room doors: specification basics Safety Duties for Powered Doors, Gates and Barriers on Commercial Sites School Security Doors Sectional Doors Secured by Design explained: is it mandatory for doors? Secured by Design vs NPSA vs LPCB: Which One You Need Security Door Locks Security Door Maintenance Checklist Security Doors and Access for Everyone: What Approved Document M Asks Security Doors for A and E Departments Security Doors for Badminton Clubs Security Doors for Bowling Alleys Security Doors for Bowls Clubs Security Doors for Climbing Centres Security Doors for Cricket Clubs Security Doors for Dialysis Centres Security Doors for Golf Clubs Security Doors for Hockey Clubs Security Doors for Ice Rinks Security Doors for Maternity Units Security Doors for Mental Health Units Security Doors for Oncology Units Security Doors for Operating Theatres Security Doors for Rehabilitation Centres Security Doors for Snooker Clubs Security Doors for Squash Clubs Security Doors for Swimming Pools Security Doors for Tennis Clubs Security Doors for Walk-in Centres Security Doors West Midlands Explained Security Fencing Security Gates Cost Factors Explained Security shutters vs high performance roller doors Security shutters vs retractable grilles: which suits retail and commercial openings? Security Turnstiles Explained Security Window Film Security Windows for Schools Explained Self Storage Security Doors Server Room Doors Explained Shopping Centre Security Doors Smoke Control Doors Explained Smoke Curtains Specification Mistakes When Mixing LPS 1175, PAS 24 and SBD in One Tender SR2 vs SR3 vs SR4 security doors: choosing the right LPS 1175 level Stadium Security Doors Steel Door Frames Steel vs aluminium security doors: strength, ratings and looks Steel vs timber fire doors: which suits your building? Student Accommodation Security Doors Substation doors: security, ventilation and specification Supermarket Security Doors Telescopic Bollards Tender Evaluation Criteria and Scoring for Security Doors and HVM The Scope of a Maintenance Contract for Security Doors and Barriers Theatre Security Doors Thermal and Weather Performance of External Security Doorsets Thermally broken steel security doors: U-values and certification Traffic Calming as Hostile Vehicle Mitigation Transport hub security requirements Turnstile Cost Factors Explained Turnstile vs speed gate vs security portal: choosing entrance control Types of security doors for commercial buildings University Security Doors Explained Vehicle Dynamics Assessment: What It Tells the Buyer Before a Barrier Is Specified Warehouse Security Doors Explained Warehouse Security Gates Warranty, Defects Liability and Guarantees for Security Doors and Barriers What affects the cost of a bullet resistant door What affects the cost of a high-security door in the UK Window Security Bars View all →

Products

One supplier for the whole building envelope

Ready to specify your project?

Free assessment, written specification and test evidence. Reply within one working day.