Listed Building Fire Doors
Fire doors for listed buildings: FD30 and FD60 leaves that hold their period without harming historic fabric, with consent, hardware and one schedule.
- ✓Third-party test evidence with every product
- ✓Written specification you can issue to tender
- ✓Supplied and installed across the UK
Get a free project quote
Rating, written specification and budget range within one working day.
Confidential. No cost, no obligation.
Third-party tested
Evidence with every quote
UK manufactured
Made to your sizes
One accountable team
Specify, supply, install
Confidential handling
Details never shared
A listed building needs fire doors that hold their period without harming the fabric they guard. The doors sit in openings cut long ago, in frames of old timber and walls of stone and brick, and a door that holds fire but damages the building has failed the second half of its job.
The order starts with the building, not with the leaf. A corridor in a listed hall asks for a different door from a stair core in a converted mill, and a room with panelled walls asks for a different leaf from a plain service corridor.
One list should hold every fire door in the building, with each one named plainly, so the right door lands on the right opening. The commercial buildings fire door regulations guide sets out the periods for the shared parts of a public building, and the steel versus timber fire doors guide works through the choice between leaf materials.
- FD30 / FD60Fire resistance periods tested to EN 1634-1
- BS EN 1634-3 Sa / S200Smoke control for doors on smoke paths
- 4 mmGap round a fire door leaf
- TS 007 3-starCylinder and handle sets
Where a listed building puts its fire doors: corridors, stair cores and rooms
Fire doors in a listed building guard the same routes as in any building, the corridors, the stair cores and the doors between rooms, but the openings they guard were not cut for a modern leaf. The flat entrance doors guide covers the door between a flat and the corridor. The opening must be measured as it stands, because a leaf ordered to a standard size will not fit a frame that has settled over the years, and the frame must be checked before the leaf is ordered.
Corridors in a listed building often carry the features that make the building worth listing, panelled walls, old plaster and carved architraves, so the door must sit in the opening without cutting them away. The leaf, the frame and the architrave belong on the same schedule line.
Stair cores are the escape routes, and the doors on them must shut on their own every time. A door that stands open on a stair core leaves the escape route open to fire and smoke, so the closer belongs on the order beside the leaf, and the fire door closers guide covers the sizes and the fitting.
FD30 and FD60 in a listed building: matching the period to the opening
Fire resistance is proved to EN 1634-1, with FD30 or FD60 naming the period and the letters E, EW or EI naming what the furnace measured. Most doors in a listed building carry thirty minutes, while doors on a compartment wall or a stair core with a heavier fire load carry sixty, and the period follows the fire load behind the door, not the age of the building.
A door on a smoke path takes FD30S, with the seal proved to BS EN 1634-3, to Sa for smoke at room temperature and S200 for smoke at 200 degrees Celsius. The gap round a fire door leaf must stay at 4 mm, because a wider gap lets fire and smoke past whatever the rating on the leaf says.
The period on the order should match the fire strategy for the building, and the strategy should be written before the doors are ordered. The fire ratings page sets out the periods in full, and the doors that guard the shared parts of the building take the period the strategy names for each opening.
The leaf that looks old and holds fire: bespoke leaves and historic fabric
A listed building rarely takes a standard leaf. The leaf must match the panels, the mouldings and the finish of the doors around it, so it is made to measure, with the fire proof built into a leaf that looks like the doors it stands beside.
Timber suits most listed buildings, because the doors around the new leaf are timber too, and a timber leaf can carry the panels and mouldings the room needs. A steel leaf suits a service area where the look matters less, and the plant room door requirements guide covers the doors on the rooms that feed the building.
The finish on the leaf must match the room, and the paint or stain belongs on the order with the leaf. A leaf painted after it is fitted may hide the seals, and a seal painted over leaves the gap open, so the finish should be applied before the seals are fitted.
Matching the old doors: panels, mouldings and the finish that hides the proof
The doors beside the new one set the pattern it must follow, and the pattern is read from the room itself. Panels, mouldings and finish on the old doors are measured on site, because a door built to a catalogue pattern will stand beside them and look wrong. The new door is built to order, with the fire proof inside a door built to the panels, the mouldings and the finish around it, so the corridor keeps its look and the proof stays inside the build. Most listed buildings take timber, because the doors around the new one are timber too, and a timber door can take the panels and mouldings the room asks for.
The finish is the part that hides the proof, and it belongs on the order with the door, put on before the seals are fitted. Paint or stain that matches the room is applied in the workshop, so the seals go into clean grooves and the strip is never painted over. A door that is painted once it is fitted can hide the seals from the round, and the choice between door materials is worked through in the steel versus timber fire doors guide. The panel the door can carry is set out in the fire door vision panels guide, with glass, beads and fixings proved with the door.
| What the room asks for | What the new door carries | What the order must name |
|---|---|---|
| Panelled face | Panels cut to match the old doors | Panel size, depth and position |
| Mouldings round the panels | Mouldings run to the old profile | Profile named, sample kept |
| Finish to match the room | Paint or stain applied before the seals | Finish named, seals fitted after |
| Vision panel in the door | Glass proved with the door | Glass, beads and fixings named |
The copy against the furnace: what the test asks of a made-to-measure door
A door built to match the old ones still faces the same test as any other fire door, and the furnace judges the build, not the look. The furnace tests one build, and the report holds what that build was made of, so the copy on the wall must match it part for part, or the proof does not reach it. A copy that changes the core to carry the panels, or thins the door to take a moulding, is a different door from the one the furnace proved.
The period on the order follows the fire load behind the opening, not the age of the building, and most doors in a listed building take thirty minutes, and a door on a compartment wall takes sixty. The periods the shared parts of a public building take are carried in the fire door regulations commercial buildings guide. The gap must hold at four millimetres, because a gap wider than that lets fire and smoke pass, whatever the rating says. The fire door hardware guide lists the grades and parts a fire door needs, and the fire door inspection checklist carries what the round should look at. Give every door its place, its period, its hardware and its consent, and the security door enquiry checklist goes with the schedule.
Hinges, closers and locks: hardware that suits the door
Hardware on a listed door must work with the leaf and suit the building. Hinges to BS EN 1935 carry the leaf through 200,000 cycles, with grade 13 rated for 120 kg and grade 14 for 160 kg, so the hinge should be chosen for the weight of the leaf it carries.
Closers on a listed door need a power size of EN 3 or above to BS EN 1154, and the closer must pull the leaf shut every time without slamming it against an old frame. A concealed closer suits a door where the hardware must not show, while a surface closer suits a service door, and the choice follows the room the door guards.
Locks and handles on a listed door should suit the building and still hold the proof. A TS 007 3-star set, made of a 1-star cylinder with a 2-star handle or escutcheon, keeps the lock proved, and the fire door hardware guide covers the grades and the parts behind a working fire door.
Glazing and vision panels: light through an old door
Old doors often carry glass, and the glass in a fire door must be proved for the job. Fire rated glazing is proved to EN 1634-1 together with the frame and the fixings, and the period follows the fire load behind the door, so the glass, the beads and the fixings belong on the same line as the leaf, because a pane in the wrong frame carries no proof at all.
Vision panels let staff see through a door without opening it, and the panel must be small enough to keep the leaf proved. A large pane in a small leaf leaves too little timber to hold the fire, so the size of the panel belongs on the order with the leaf, and the fire rated glazed doors page covers the glazed leaves that carry the higher periods.
The glass in a listed door should suit the building, and old glass that cannot be proved must be replaced with glass that can. The fire rated windows guide covers the windows that share the same wall.
Consent and the conservation officer: the approval before the order
Work that changes a listed building needs listed building consent, and the consent must be in place before the doors are ordered. A door ordered before the consent arrives may arrive at the wrong size or the wrong finish, and a leaf changed after it is made costs the leaf twice over.
The conservation officer is the person who reads the application, and the application should name every door that will change. A schedule that names each opening, each leaf and each piece of hardware gives the officer what is needed to judge the work.
Some doors in a listed building may already hold a proof, and those doors should be kept where they can be. A door that has held its period for years should not be replaced because the schedule names a new leaf, so each existing door should be checked before the order goes out.
A condition on the consent becomes a line on the schedule
Listed building consent must be in place before the doors are ordered, and the consent may carry conditions on the leaf, the finish, the hardware and the glazing. Each condition belongs on the schedule beside the door it governs, because a leaf made to the schedule and not to the consent arrives as a door the building was never allowed to have. The application should name every door that will change, and the schedule that names each opening, each leaf and each piece of hardware gives the conservation officer what is needed to judge the work.
The leaf that looks old and holds fire is made to measure, with the fire proof built into a leaf that matches the panels, the mouldings and the finish of the doors around it. Timber suits most listed buildings, because the doors around the new leaf are timber too, and the steel versus timber fire doors guide works through the choice between leaf materials. A steel leaf suits a service area where the look matters less. The fire door regulations commercial buildings guide carries the periods for a public building’s shared parts. The finish on the leaf must match the room, and the paint or stain belongs on the order with the leaf, because a leaf painted after it is fitted may hide the seals, and a seal painted over leaves the gap open.
| Consent condition | What it asks for | What goes on the schedule |
|---|---|---|
| Leaf finish | Paint or stain to match the room | Finish applied before the seals are fitted |
| Hardware visible | Hinges and closers that suit the building | Concealed closer where the hardware must not show |
| Glazing size | A panel small enough to keep the leaf proved | Glass, beads and fixings proved with the leaf |
| Architrave kept | Old timber round the opening | Leaf, frame and architrave on one line |
| Frame kept | The old frame stays in the opening | Leaf measured as the opening stands |
A leaf changed after consent needs consent again
Order the door before the consent lands and it can arrive at the wrong size or in the wrong finish, and changing a leaf after it is made means paying for the leaf twice. Where the consent names a finish and the room asks for another, the change goes back to the conservation officer before the leaf is made, because a leaf fitted on a changed consent has no permission behind it. The vision panel belongs on the order with the leaf, and the fire door vision panels guide sets out the panel the leaf can carry.
From the day the doors arrive, keep the test reports and the consent beside them, so the proof and the permission never part from the leaf they belong to. The fire door hardware guide names the grades and the parts that make a fire door work, and the fire door inspection checklist sets out what each round should check. Give every door its position, period, leaf, hardware and consent on the schedule, and the security door enquiry checklist shows what the enquiry needs alongside it.
Seals, gaps and the inspection round: keeping the proof alive
A fire door only holds its proof while the leaf, the frame and the hardware match the doorset that was tested. Intumescent seals expand at around 200 to 250 degrees, and the seal must be checked on every round, because a seal that has come away or been painted over leaves the gap open, and the gap round the leaf must stay at 4 mm.
The round in a listed building should look at the closers, the seals, the locks and the glazing, and each fault should be written down the same day, with the door named and the date noted. The person who runs the building owns the record, and each entry should name the door and the fault, say what was done about it, and carry the date the work was finished.
Old frames move with the seasons, so the gaps round the leaf should be checked through the year, not once. A frame that has swelled in winter may hold the leaf open, and a frame that has shrunk in summer may leave the gap wide, and the fire door inspection checklist names what each round should look for.
One schedule for the whole building: every door on one line
Put the order together as one list with a line for every door in the building, naming the position, the fire period, the leaf, the hardware and the consent beside each one, so the door that arrives matches the door that was proved and the door that was allowed. A schedule that names one door for the whole building leaves the joiner to guess which leaf goes where, and a guess is not a proof.
Read every quote against the list before anything is ordered. Parts left off a quote do not vanish; they turn up later, fitted round a door that is already in place, at a higher cost than ordering them with the door. The security door cost factors guide works through what each step up the scale adds.
Keep the test reports and the consent with the doors from the day they arrive, so the proof and the permission stay with the leaf they belong to, and the how to specify security doors guide sets out the columns the schedule needs. The security door maintenance checklist covers the doors that must hold both fire and forced entry, and the keeping an LPS 1175 rating valid guide sets out what breaks a rating once the door is fitted.
| Position | Door | Rating | What to check |
|---|---|---|---|
| Corridor | Bespoke timber fire door | FD30 | Seals, closer, gap |
| Stair core | Bespoke timber fire door | FD60 | Closer, seals, release |
| Room door | Panelled fire door | FD30 | Hinges, lock, seals |
| Service area | Steel fire door | FD60 | Seals, closer, latch |
| Escape route | Glazed fire door | FD30S | Glass, seals, release |
A listed building fire door must hold its period without harming the fabric, so the leaf, the hardware and the consent must all sit on the same schedule.
What rating do listed building fire doors need?
It depends on the opening. Most doors carry FD30, and doors on a compartment wall or a stair core with a heavier fire load carry FD60, with the period following the fire strategy for the building.
Do listed buildings need consent for new fire doors?
Yes, where the work changes the listed building. Listed building consent must be in place before the doors are ordered, and the application should name every door that will change.
Can a fire door look like an old door?
Yes. The leaf is made to measure, with the fire proof built into a leaf that matches the panels, mouldings and finish of the doors around it, and the test report must name the leaf as built.
What hardware suits a listed fire door?
Hardware chosen for the leaf it guards. Hinges to BS EN 1935, closers of EN 3 or above to BS EN 1154, and a TS 007 3-star lock set, with the test report naming the hardware as fitted.
Who checks listed building fire doors?
The person who runs the building, on the routine the fire risk assessment sets. Each round looks at the closers, the seals, the locks and the glazing, and each fault is written down the same day.
Get a free quote
Related
More in guides for specifiers
Products
One supplier for the whole building envelope
Ready to specify your project?
Free assessment, written specification and test evidence. Reply within one working day.