Fire Door Regulations for Snooker Clubs

A snooker club keeps quiet tables beside a bar and a members room, so each leaf takes the fire period its room needs, FD30 at the front and FD60 behind it.

  • ✓Third-party test evidence with every product
  • ✓Written specification you can issue to tender
  • ✓Supplied and installed across the UK
Prefer to talk?+44 7352 267239

Get a free project quote

Rating, written specification and budget range within one working day.

ArxBridge Quote Form

Confidential. No cost, no obligation.

Third-party tested

Evidence with every quote

UK manufactured

Made to your sizes

One accountable team

Specify, supply, install

Confidential handling

Details never shared

A snooker club gives its entrance, its bar, its snooker hall and its members room an FD30 leaf, and its kitchen, its back office and its plant room an FD60 leaf. The rooms at the front hold fire back for 30 minutes, and the rooms at the back hold it back for 60, because the heat and the papers behind them ask for longer.

EN 1634-1 tests a doorset against fire and gives the period in minutes, from FD30 up to FD120. The letter after the number names what the leaf held back, E for flame alone, EW for flame with part of the heat, and EI for flame with the heat as well. A leaf marked FD30 therefore holds flame back for 30 minutes, and a leaf marked FD60 holds it back for 60 minutes.

A snooker club runs its evening on tables and frames in a quiet hall, which sets it apart from a bowling alley where the evening runs on lanes with pins at the far end. No machine stands in place of a table, so the club is not an arcade, and no caller runs the evening, so it is not a bingo hall. The fire door regulations for bowling alleys guide covers the lane venue, the fire door regulations for arcades guide covers the machine hall, and the fire door regulations for bingo halls guide covers the called session, while this guide stays with the tables, the bar and the members room of the snooker club.

  • FD30 / FD60Periods to EN 1634-1
  • Snooker hallWhere FD30 guards the tables
  • KitchenFD60 behind the cookers
  • One listEvery club leaf named

Seven rooms in a snooker club: the period each leaf takes

Seven rooms make up the club, and the period follows what each room holds. The seven rooms are the entrance, the bar, the snooker hall, the members room, the kitchen, the back office and the plant room.

FD30 sits on the entrance, the bar, the snooker hall and the members room, because all four stand where members and visitors pass through the evening. FD60 goes on the kitchen, the back office and the plant room, because the rooms at the back ask for a longer hold.

Room Period Grade What to check
Entrance FD30 B3 Leaf, closer, seals
Bar FD30 B3 Leaf, closer, gaps
Snooker hall FD30 B3 Leaf, closer, vision panel
Members room FD30 B3 Leaf, closer, seals
Kitchen FD60 C5 Leaf, closer, seals
Back office FD60 C5 Leaf, closer, gaps
Plant room FD60 C5 Leaf, closer, seals

Where the club wants a leaf that also resists forced entry, the fire period and the grade are proved on the same doorset, so one report holds both and the order names both together. The fire and security doors dual certification guide names how the two proofs sit on one leaf.

What FD30 and FD60 hold back in a snooker club

FD30 holds flame back for 30 minutes, and FD60 holds it back for 60, and the letter after the number says whether the heat was held back with the flame. A leaf marked E held the flame alone, a leaf marked EW held the flame with part of the heat, and a leaf marked EI held the flame with the heat as well.

The club needs the longer period where the fire would start hot and grow fast, and the shorter period where the room opens onto the way out. The kitchen, the back office and the plant room take FD60 for that reason, while the entrance, the bar, the hall and the members room take FD30. The fire door certification guide names what proof a leaf must carry before the club accepts it.

Need this specified for your project?Free rating, written specification and budget range within one working day.
Get a free quote

Sixty minutes behind the kitchen, office and plant room leaves

The kitchen holds the cookers and the gas that feed suppers between frames, so FD60 sits on its leaf and the leaf stays shut while the cookers are hot, because a fire that starts at a cooker grows fast and the hall beside it holds members at the tables. The fire door regulations for restaurants guide covers the kitchen that serves meals through the day.

The back office holds the membership lists, the fixture lists and the papers that run the club, so FD60 sits on its leaf as well and the leaf stays shut when the room is empty, because the papers behind it would feed a fire and the club would lose the records it runs on. The count from the cash desk runs in the back office too, behind the same FD60 leaf, once the bar shuts and the till is carried through.

The plant room holds the boards and the equipment that keep the water hot and the lights on, so its leaf takes FD60 as well. The plant room fire doors guide names in full what a leaf on that room must do, and the leaf stays shut because the boards behind it feed the whole club.

Entrance and bar: FD30 where members arrive for the evening

Members arrive at the entrance with cue cases over their shoulders, and visitors follow them in for a drink before the first frame, so the entrance leaf takes FD30 and stands on the way out as well as the way in. The leaf opens to members and their guests while the session runs, and it must open freely when the hall empties at the end of the evening.

A member pushing the entrance leaf meets a limit set by BS 8300 and Approved Document M, under 30 N across the first 30 degrees of swing and under 22.5 N after that, so the leaf opens for a person carrying a cue case or leaning on a stick.

The bar takes the takings of the evening behind an FD30 leaf that stays shut once the last drink is served, and the cash desk behind the bar counts the till behind that shut leaf. The counting room sits behind the bar as well, and its door stays shut while the count runs. The fire door regulations for casinos guide covers a venue that counts cash through the night.

Snooker hall and members room: FD30 beside the tables

The snooker hall holds the tables, the cue racks, the chalk and the scoreboards, and a frame can run long into the evening, so its leaf takes FD30 and stays shut while members are at the tables.

The hall leaf carries a small vision panel, so a member can see whether a table is free without opening the leaf and breaking the quiet of the hall. The fire door vision panels guide names what a pane in a fire leaf must hold.

A route that serves more than 60 people needs a leaf that opens under a crowd, so the leaves on it carry a push bar proved to BS EN 1125, and the bar spans no less than 60 percent of the leaf width. A member pressed forward by the crowd behind them opens the leaf with a single push, and the bar answers whether the supply is on or off. The panic hardware guide names what the bar must do when a crowd presses against the leaf, and the emergency exit doors guide covers the leaves on the way out.

Members sit in the members room between frames, with armchairs, a notice board and the league tables on the wall, so the leaf takes FD30 and stays shut while the room is empty.

Smoke in the club: Sa and S200 beside the period

Smoke reaches the hall before flame does, so the leaf needs a smoke seal beside its period, and the seal is proved to BS EN 1634-3. A leaf marked Sa holds smoke back at room temperature, and a leaf marked S200 holds it back at 200 degrees, so the mark on the order names which smoke the leaf was proved against.

The corridor from the hall to the entrance carries the smoke of a fire in the kitchen or the plant room, so the leaves on that corridor take smoke seals with their period. The smoke control doors guide names where a smoke seal sits beside a fire period.

Closers, seals and gaps: what the club period rests on

The closer that draws the leaf shut after each member carries a proof to BS EN 1154, where EN 1 is the smallest power size the standard names and no fire leaf takes a power size below EN 3. A closer that is too weak for the leaf leaves it ajar, and a leaf left ajar holds no period at all.

The intumescent seal round the leaf swells when the heat reaches it, and the swell closes the gap round the leaf edge. The seal starts to expand at around 200 to 250 degrees, and the intumescent seals guide names how the seal is fitted and what it must hold.

The gap round a fire leaf is 4 mm, and the gap is measured round the leaf edge and the head, not guessed by eye. The fire door gaps guide names where the gap is measured and what a wide gap costs the leaf.

Hinges proved to BS EN 1935 carry the club leaves, grade 13 through 200,000 cycles with a leaf of 120 kg and grade 14 through the same cycles with a leaf of 160 kg. The fire door hardware guide names what each piece on a fire leaf must carry.

The snooker club fire door order: every leaf, its period and its proof

The whole order sits on one list, with a line for every opening that names the leaf, the period, the seals and the closer beside it. A leaf with no line of its own may end up hung where it does not belong, and an FD60 leaf on the members room would hold for 60 minutes where 30 would do.

The club secretary takes the door list round the club each month and tries each leaf in turn, and the closer, the seals and the gap on each leaf are looked at as the leaf is tried. A leaf that will not shut, a seal that is torn and a gap that has grown are noted on the list, and the fire door inspection checklist names what the walk round the club should cover.

The larger sports hall beside a club is covered in the fire door regulations for leisure centres guide, and the fire compartmentation guide names how the rooms of the club are held apart from each other. The fire door maintenance guide names what keeps a leaf holding its period after the order.

Before the order is signed, each leaf on it is read through once more, and the proof for every leaf is checked against the list before the order leaves the club.

The period on a snooker club leaf follows the room behind it, so the leaf, the closer and the seals are ordered together and checked together against the tables and the takings behind the leaf.

What period does a snooker club entrance take?

FD30 to EN 1634-1, which holds flame back for 30 minutes, because the entrance stands on the way out through the evening.

What period does the kitchen take?

FD60 to EN 1634-1, which holds flame back for 60 minutes, because the cookers behind the leaf ask for a longer hold than the rooms at the front.

What period does the plant room take?

FD60 to EN 1634-1, which holds flame back for 60 minutes, because the boards behind the leaf feed the whole club.

What gap does a fire door leaf need?

A gap of 4 mm round the leaf edge and the head, because a wider gap lets flame and smoke past the leaf before the period runs out.

Who checks the snooker club fire doors?

The club secretary checks the fire leaves each month, with the closer, the seals and the gap on each leaf looked at as the leaf is tried.

Specifying fire doors for a snooker club?Send the door list with the period and the proof each room must hold for a tested door quotation.
Get a free quote

Related

More in guides for specifiers

10 mistakes when specifying certified security doors 10 steps to specify an LPS 1175 door Acceptance and Snagging of a Security Door or Barrier Job Access Control Doors Acoustic Doors: Ratings and Specification After a Forced Entry Attempt: Checking a Security Door Airport Security Doors Anti-Ligature Doors for Mental Health Wards Anti-Ram Bollards Anti-ram gates and barriers: protecting vehicle entrances Arcade Security Doors Explained Automatic Doors Automatic Gates Cost Factors Automatic Vehicle Barriers Ballistic Panels Bank Security Doors Bingo Hall Security Doors Explained Blast doors: glazed vs solid and how they are rated Blast protection window film: what it does and what it cannot do Blast resistant windows: what drives the cost and how to specify them Bollard Cost Factors Explained Bollard regulations in the UK: spacing, height and depth Bookmaker Security Doors Explained Builders Merchant Security Doors Bullet Resistant Glass Cost Factors Bullet resistant glass ratings explained: BR1 to BR7 and SG classes Bullet resistant vs bulletproof glass: what the difference means Buying Security Doors and HVM Through Public Frameworks Car Park Security Doors Explained Car Showroom Security Doors Casino Security Doors Explained CDM 2015 Duties When Security Doors, Shutters or HVM Are Installed Cinema Security Doors Cleanroom Doors Cold Store Doors College Security Doors Commissioning, Handover and the O&M Manual for Security Doors and HVM Communal entrance doors for flats: Secured by Design and what to specify Community Centre Security Doors Control Room Doors Court Security Doors Crash Rated Fences and HVM Fencing Explained Data centre physical security: doors, glazing, HVM and shielding by zone Dental Practice Security Doors Depot Security Doors Explained Door Entry Systems Due Diligence When Selecting Vehicle Security Barriers Emergency Exit Doors EMP Shielding Cost Factors Explained Exhibition Centre Fire Door Rules Exhibition Centre Security Doors Factory Security Doors Faraday cage vs RF shielded room: what a business needs FB4 vs FB6 vs FB7: how to choose a ballistic rating Fire and security doors: how dual certification works Fire Compartmentation Fire Curtains Fire Door Certification Fire Door Closers Explained Fire Door Cost Factors Fire Door Duties of the Accountable Person Fire Door Gaps Fire Door Hardware Explained Fire door inspection checklist for steel and timber doors Fire Door Maintenance Fire Door Regulations Care Homes Fire Door Regulations for A and E Departments Fire Door Regulations for Airports Explained Fire Door Regulations for Bowls Clubs Fire door regulations for commercial buildings in the UK Fire Door Regulations for Dialysis Centres Fire Door Regulations for Hockey Clubs Fire Door Regulations for Hospitals Explained Fire Door Regulations for Offices Explained Fire Door Regulations for Operating Theatres Fire Door Regulations for Retail Explained Fire Door Regulations for Schools Explained Fire Door Regulations for Stadiums Fire Door Regulations for Student Accommodation Fire Door Regulations for Warehouses Fire Door Regulations Leisure Centres Fire Door Regulations Restaurants Fire Door Remediation Programme for Housing Providers Fire Door Rules for Badminton Clubs Fire Door Rules for Bingo Halls Fire Door Rules for Bookmakers Fire Door Rules for Bowling Alleys Fire Door Rules for Car Parks Fire Door Rules for Car Showrooms Fire Door Rules for Cinemas Fire Door Rules for Climbing Centres Fire Door Rules for Colleges Fire Door Rules for Community Centres Fire Door Rules for Cricket Clubs Fire Door Rules for Dental Practices Fire Door Rules for Depots Explained Fire Door Rules for Golf Clubs Fire Door Rules for GP Surgeries Fire Door Rules for Gyms Explained Fire Door Rules for Ice Rinks Fire Door Rules for Maternity Units Fire Door Rules for Mental Health Units Fire Door Rules for Museums Fire Door Rules for Oncology Units Fire Door Rules for Opticians Fire Door Rules for Pawnbrokers Fire Door Rules for Petrol Stations Fire Door Rules for Pharmacies Fire Door Rules for Ports Fire Door Rules for Post Offices Fire Door Rules for Prisons Fire Door Rules for Rehabilitation Centres Fire Door Rules for Self Storage Fire Door Rules for Shopping Centres Fire Door Rules for Squash Clubs Fire Door Rules for Supermarkets Fire Door Rules for Swimming Pools Fire Door Rules for Tennis Clubs Fire Door Rules for Theatres Fire Door Rules for UK Arcades Fire Door Rules for UK Casinos Fire Door Rules for UK Hospices Fire Door Rules for Walk-in Centres Fire Door Signage Fire Door Vision Panels Fire Doors and Gateway 2 in Higher-Risk Buildings Fire Rated Glass Cost Explained Fire Rated Sliding Doors Explained Fire Rated Windows Cost Factors Fire Rated Windows Explained Fire Safety Enforcement Notices and Fire Doors: What the Responsible Person Must Do Flat Entrance Doors: PAS 24 and Fire Rated Forced Entry vs Ballistic vs Blast: Which Rating a Site Needs Garage Security Doors Explained Gate Automation Explained Golden Thread Records for Fire Doors GP Surgery Security Doors Explained Gym Security Doors Explained High Speed Doors HMO Fire Doors Hospice Security Doors Explained Hospital Security Doors: Wards, A&E, Plant Hospital Security Gates Hotel Fire Doors Hotel Security Doors How to choose HVM bollards: fixed, shallow mount, removable and automatic How to keep an LPS 1175 door rating valid after installation How to Specify Fire Doors in a Housing Tender How to specify security doors: a checklist for architects How to Verify a Secured by Design Listing How to Verify an LPS 1175 Certificate on Red Book Live How to Write an Operational Requirement for Physical Security HVM planters and street furniture: protection that blends in In-Service Care of Vehicle Security Barriers Installation Handover: LPS 1175 Doors and PAS 68 Barriers Intumescent Seals ISO 16933 explained: EXV and SB classes and hazard ratings ISO 22343 vehicle security barriers explained Keeping a Dual-Certified Fire and Security Door Valid in Service Laboratory Security Doors Layered Security for a Site: Deter, Detect, Delay, Mitigate, Respond Lead Times and Programme Risks for LPS 1175 Doors Leisure Centre Security Doors Library Security Doors Listed Building Fire Doors Loading Bay Doors Explained Lockdown and Access Control Hardware on an LPS 1175 Door LPS 1175 Gates and Grilles Explained LPS 1175 Issue 8 explained: from SR1 to SR8 to A1 to H20 LPS 1175 Roller Shutters LPS 1175 vs ASTM F2781 and Other US Ratings Explained LPS 1175 vs EN 1627: how UK and European burglar resistance ratings compare LPS 1175 vs PAS 24: which security standard does your door need? LPS 1175 Windows and Walling Explained Martyn’s Law and Places of Worship: What a Buyer Checks for Doors and Entry Control Martyn’s Law Enhanced Tier: Physical Measures and the Specifier Brief Martyn’s Law Standard Tier: Procedures, Doors and Shutters Martyn’s Law Timeline and the SIA Regulator Martyn’s Law: what premises must do and which physical measures to consider Master Key Systems MRI and RF shielded rooms: how they work and what to specify Museum Security Doors NPSA Catalogue of Security Equipment (CSE) Explained NPSA Forced Entry and Blast Guidance for Government Sites NPSA Guidance on Lockdown and Marauding Attack: What It Asks of Doors and Entrances Office Security Doors Optician Security Doors Explained Panic Hardware PAS 24 requirements for doors and windows explained PAS 68 Bollard Foundations Explained PAS 68 bollards: ratings, spacing and cost factors PAS 68 vs IWA 14 vs ISO 22343: hostile vehicle mitigation standards explained Pawnbroker Security Doors Explained Pedestrian Gates Petrol Station Security Doors Pharmacy Security Doors Planning Permission for Security Shutters, Gates and Bollards on Commercial Premises Plant room doors: fire, security and ventilation requirements Plant Room Fire Doors Port Security Doors Post Office Security Doors Explained Powder coating vs galvanising vs paint for steel Preliminary Market Engagement for Security Doors and HVM Prison Security Doors Programming a Security Door and Barrier Package on a Live Site Public-Sector Tender Response Checklist for Security Door and HVM Supply Reading a PAS 24 and SBD Door Test Report Regulation 38 Fire Safety Information at Handover for Fire-Rated Security Doorsets Replacing Security Doors in an Occupied Building Restaurant Security Doors Retail Security Doors Revolving Doors RF shielding standards and how shielded rooms are tested Rising Bollard Cost Factors Road Blocker Cost Factors Explained Road Blockers Explained Roller Shutter Cost Factors: What Drives the Price Roller shutter regulations in the UK: safety and maintenance Safe room and panic room doors: specification basics Safety Duties for Powered Doors, Gates and Barriers on Commercial Sites School Security Doors Sectional Doors Secured by Design explained: is it mandatory for doors? Secured by Design vs NPSA vs LPCB: Which One You Need Security Door Locks Security Door Maintenance Checklist Security Doors and Access for Everyone: What Approved Document M Asks Security Doors for A and E Departments Security Doors for Badminton Clubs Security Doors for Bowling Alleys Security Doors for Bowls Clubs Security Doors for Climbing Centres Security Doors for Cricket Clubs Security Doors for Dialysis Centres Security Doors for Golf Clubs Security Doors for Hockey Clubs Security Doors for Ice Rinks Security Doors for Maternity Units Security Doors for Mental Health Units Security Doors for Oncology Units Security Doors for Operating Theatres Security Doors for Rehabilitation Centres Security Doors for Snooker Clubs Security Doors for Squash Clubs Security Doors for Swimming Pools Security Doors for Tennis Clubs Security Doors for Walk-in Centres Security Doors West Midlands Explained Security Fencing Security Gates Cost Factors Explained Security shutters vs high performance roller doors Security shutters vs retractable grilles: which suits retail and commercial openings? Security Turnstiles Explained Security Window Film Security Windows for Schools Explained Self Storage Security Doors Server Room Doors Explained Shopping Centre Security Doors Smoke Control Doors Explained Smoke Curtains Specification Mistakes When Mixing LPS 1175, PAS 24 and SBD in One Tender SR2 vs SR3 vs SR4 security doors: choosing the right LPS 1175 level Stadium Security Doors Steel Door Frames Steel vs aluminium security doors: strength, ratings and looks Steel vs timber fire doors: which suits your building? Student Accommodation Security Doors Substation doors: security, ventilation and specification Supermarket Security Doors Telescopic Bollards Tender Evaluation Criteria and Scoring for Security Doors and HVM The Scope of a Maintenance Contract for Security Doors and Barriers Theatre Security Doors Thermal and Weather Performance of External Security Doorsets Thermally broken steel security doors: U-values and certification Traffic Calming as Hostile Vehicle Mitigation Transport hub security requirements Turnstile Cost Factors Explained Turnstile vs speed gate vs security portal: choosing entrance control Types of security doors for commercial buildings University Security Doors Explained Vehicle Dynamics Assessment: What It Tells the Buyer Before a Barrier Is Specified Warehouse Security Doors Explained Warehouse Security Gates Warranty, Defects Liability and Guarantees for Security Doors and Barriers What affects the cost of a bullet resistant door What affects the cost of a high-security door in the UK Window Security Bars View all →

Products

One supplier for the whole building envelope

Ready to specify your project?

Free assessment, written specification and test evidence. Reply within one working day.