ArxBridge
Fire Door Rules for Self Storage
A self-storage site fills with customers who do not know its corridors, so each fire door takes its period from the room behind the leaf, corridor by corridor.
- ✓Third-party test evidence with every product
- ✓Written specification you can issue to tender
- ✓Supplied and installed across the UK
Get a free project quote
Rating, written specification and budget range within one working day.
Confidential. No cost, no obligation.
Third-party tested
Evidence with every quote
UK manufactured
Made to your sizes
One accountable team
Specify, supply, install
Confidential handling
Details never shared
A self-storage site is a building of corridors and small rooms, where customers come and go with boxes and furniture they have never carried through these doors before. The fire doors sit between the corridors and the units, and each one holds the fire where it starts long enough for the people inside to reach the way out.
What a storage door must hold is decided by the room behind the leaf, not by the leaf itself. A door off a unit corridor faces rows of locked units full of boxes, a door into the stores faces goods stacked to the ceiling, and a door into the plant room faces machinery that runs all day, so the three doors take different periods even when they look the same from the front.
Storage shares rules with warehouses and shops, and those shared rules are covered in the fire door regulations warehouses guide, while the rules for the retail units that sit beside many storage sites are covered in the fire door regulations retail guide. The site order lists each opening with its period and its hardware beside it.
- FD30 / FD60Fire periods to EN 1634-1
- E / EW / EI 30-120What the letters beside the period mean
- 4 mmThe gap round the leaf
- One listEvery storage door named
Units, corridors and the office: one site, three periods
A self-storage site works as three places joined together: the corridors where the customers walk, the units where their goods sit, and the office where the bookings are kept. The rules follow those places, because a door from one place to the next must hold the fire on the side where it started while the customers on the corridor find the way out.
The unit corridors take doors that stay open to the trolleys and shut when the alarm sounds, and each leaf must open for a customer carrying boxes who has never seen the building before. The stores take doors that guard the goods, and each leaf must hold fire back where the stock sits in boxes and on pallets.
Before any leaf is ordered the site sets down its fire strategy, naming every opening and the door beside it, and the order follows that strategy. A leaf ordered with no room beside its name may turn up in the wrong corridor, guarding the wrong thing.
The site stands empty at close; every corridor door must shut on its own
After close a self-storage site stands empty, with nobody left to push a door shut. Every door on the site must then shut on its own, because a line of doors left open lets smoke run clear down a corridor through the night. Each door on the site is drawn back to its frame by a closer proved to BS EN 1154, size EN 3 or above, so the site closes itself behind the last customer through.
The night check walks the rows and tries each door in turn, unit corridor first and office last. The checker pulls a door wide, lets it go, and watches it meet the frame, because a door that stops short is the one that will stand open all night. The checker notes a strip out of its groove and a closer gone slack beside their own doors before moving on. The inspection checklist sets out what that nightly walk should look for on each door.
Smoke gets to a corridor long before flame does, so the route doors take a smoke rating beside their fire period. The two smoke ratings sit in BS EN 1634-3. Sa holds smoke at room temperature, S200 holds it at 200 degrees, and a seal guards the route only where it meets the frame without a break. The loading bay door is held open for deliveries through the day by a BS EN 1155 device, which lets go the moment the alarm sounds. The smoke control guide sets out how a corridor door holds smoke back while the site empties.
| Row | Door | Night try |
|---|---|---|
| Unit corridor | FD30, shuts after each pass | Door meets the frame alone |
| Stores corridor | FD60, shuts after each pass | Seal touches the frame throughout |
| Loading bay | FD30, held open till alarm | Device lets go and door shuts |
| Office route | FD60, shuts after each pass | Lock turns and bolt throws cleanly |
One walk, every row, no door left open
One route, one proof: the shortest hold among its doors sets how long the whole route stands, and every door on the route takes the proof the route needs. The night walk is the proof that the paper order matches the building. The compartmentation guide shows where the doors divide one part of the site from the next.
Through the day the bay door stands open while trolleys roll through, and at close it must shut like every other door on the site. A driver with a trolley has both hands full, so the bar is proved to BS EN 1125 and spans no less than six tenths of the door, and a shoulder or a trolley throws the latch in one push. The loading bay guide sets out which doors take the deliveries in through the day, and the closer guide lists the sizes a corridor door takes.
The site list is sent to the enquiry checklist with the period and the closer written beside each door, so the empty corridors still close themselves after the last customer has gone.
FD30 and FD60 across a self-storage site: the periods each part takes
Each part of a storage site asks a different period of its doors, because the load behind each leaf is different. The unit corridors hold customers and the goods in their boxes, the stores hold stock in boxes and crates, and the plant room holds the machinery that serves the whole building, so the period on each door follows the room, not the leaf.
A fire door earns its period in a furnace test to EN 1634-1, where the leaf is held against flames and heat while the minutes are counted. The result pairs a number with letters: the number counts the minutes the leaf held, and the letters say whether flames alone were stopped, flames with some heat, or flames with the heat as well.
A leaf proved for 60 minutes carries more weight than one proved for 30, and the frame must be deeper to hold it, so the figure on the order climbs with the period. Fitting a 30-minute leaf where the opening asks for 60 leaves the shortest proof to fail first.
The unit corridors: rows of doors and the route between them
The unit corridors run in rows, and the doors on them must hold their proof while letting customers pass with boxes and trolleys all day. A glazed leaf lets a customer see the corridor beyond it without opening the leaf, and the pane takes the same proof as the leaf, because the leaf and the glass are proved as one doorset.
The goods in the units carry a fire load of their own, and the doors between the corridor and the stores must hold the fire where it starts. A leaf between the corridor and the stores takes the period the stores demand, because the fire that starts among the goods must stay among the goods while the customers move out.
The fire rated windows guide covers the windows that share the same wall, and what the glass itself costs is worked through in the fire rated glass cost guide. The doors that guard a warehouse take the same care with their corridors, as the warehouse security doors guide shows.
Stores and the loading bay: the doors behind the units
The stores take the heaviest fire load on the site, because the goods sit there in boxes and crates all day and the trolleys move through it without stopping. A stores leaf takes FD60, and the period follows the fire load, not the size of the site.
The loading bay takes deliveries all day, so its doors stand open while the trolleys pass. A leaf held open through the day needs a hold-open device proved to BS EN 1155, which shuts the leaf on its own the moment the alarm sounds. A leaf wedged open with a trolley holds nothing back when the fire comes.
The doors that take the deliveries in are covered in the loading bay doors guide, and a site takes the same care with its loading bay as a warehouse takes with its own.
The office and the plant room: what the back of the site must hold
The office holds the bookings and the records, and the leaf that guards it takes the period the room beside it takes. An office leaf takes FD60 where the office sits beside the stores, because the fire that starts among the goods must not reach the bookings and the records.
The plant room needs the same care, because the machinery and the electrical boards sit behind its doors all day, so a plant room leaf takes FD60.
The office and the stores need a leaf that holds fire back and holds an intruder out, so some storage leaves carry both proofs on one doorset. LPS 1175 Issue 8.2, dated September 2024, sets the forced entry categories at three, five and ten minutes, named B3, C5 and D10. How the two ratings sit beside each other is set out in the LPS 1175 vs PAS 24 guide, what can break a rating once a door is fitted is named in the keeping an LPS 1175 rating valid guide, and how one doorset carries both proofs is worked through in the fire and security doors dual certification guide.
When the alarm sounds: the routes customers use
Customers in a storage site follow the route the building gives them, and the way out must be clear when the alarm sounds. Each door on the route opens with one push, whether the power is there or not.
A route door needs a smoke rating beside its fire period, and BS EN 1634-3 gives it: Sa where the smoke is at room temperature, S200 where it is at 200 degrees. Either rating works only where the seal meets the frame all round, because smoke reaches the route before the flames do. The smoke control doors guide works through how the doors hold smoke back while people move past them.
Every leaf on one route holds for the same time, because the shortest proof among them sets how long the whole route lasts. Where one leaf holds for less time than the rest, the route holds only as long as that leaf, so no leaf on the route takes a shorter proof than the route needs. The fire door regulations leisure centres guide shows the same care taken with the visitors in a leisure centre.
| Position | Door | Period | What to check |
|---|---|---|---|
| Unit corridor | Glazed leaf | FD30 | Leaf, glass, closer |
| Stores | Steel leaf | FD60 | Leaf, lock, seals |
| Office | Steel leaf | FD60 | Leaf, lock, seals |
| Plant room | Fire leaf | FD60 | Leaf, seals, gap |
| Public route | Fire leaf | FD30 | Leaf, bar, closer |
| Back of house | Steel leaf | FD60 | Leaf, closer, seals |
The corridor leaf shuts behind each customer when the alarm sounds
A customer who arrives with boxes has never walked the corridors, and the route out is new to them. Each unit door along the corridor must fall shut behind the customer who passes it, because a line of leaves left open gives smoke a clear run down the corridor. A closer proved to BS EN 1154 at EN 3 or above draws each leaf back to its frame without a hand on it, so the corridor closes itself behind the last customer through.
Smoke gets to the corridor while customers are still finding the exit, so the route leaves carry a smoke rating with their fire period. BS EN 1634-3 gives two: Sa, which holds smoke at room temperature, and S200, which holds it at 200 degrees, and either one works only where the seal touches the frame without a break. The smoke control guide shows how a corridor leaf keeps smoke on one side while customers pass.
The loading bay leaf is the exit for a driver whose hands are full of trolley, and it has to open without a free hand. Through the day it is held open for deliveries by a BS EN 1155 hold-open, which lets go of the leaf the moment the alarm sounds, so the bay leaf is already shut when the driver turns for the exit. The loading bay guide names the doors that take deliveries in through the day.
| Route | Who uses it | Leaf |
|---|---|---|
| Unit corridor | Customers with boxes | FD30, shuts after each pass |
| Stores corridor | Staff with trolleys | FD60, shuts after each pass |
| Loading bay | Driver with a trolley | FD30, held open till alarm |
| Office route | Staff and visitors | FD60, shuts after each pass |
Boxes, trolleys and strangers: the loading bay leaf carries them all out
All day the bay leaf stands open while trolleys roll through, and when the alarm sounds the whole site funnels through it. A driver with a trolley has no hand to spare, so the bar on the leaf is proved to BS EN 1125 and covers no less than six tenths of the leaf, letting a shoulder or a trolley throw the latch in one push. The panic hardware guide explains the bar a driver opens with a shoulder when both hands hold a trolley.
One route, one proof: the leaf with the shortest hold on a route sets how long the whole route stands. A leaf that holds for less time than its neighbours shortens the route to its own figure, so every leaf on the route is given the proof the route needs. The compartmentation guide shows the line the leaves draw between one part of the site and the next.
Once a week the door list is walked round the site, office door first, bay leaf last. A leaf that drags, a seal out of its groove and a closer that has lost its pull are noted beside their own doors before the day is out. The inspection checklist sets out what that weekly walk should look for on each leaf, and the site list is sent to the security door enquiry checklist, each door carrying its period and its closer.
Closers, seals and gaps on storage doors: what the period rests on
The closer on a storage leaf works harder than the closer on most other doors, because customers pass through it all day with boxes and trolleys. Under BS EN 1154 the smallest closer power on a fire door is EN 3, and the check is to open the leaf and watch it shut on its own. A closer that has lost its pull leaves the leaf standing open after the customer has passed.
The gap beside the leaf is kept to 4 mm, so the leaf swings free and the seal can close the opening when the leaf shuts. When the heat nears 200 to 250 degrees the intumescent seal swells to close the gap, unless a coat of paint stops it swelling. Any seal found out of its groove goes in the record against its door on the day it is found, with the part and the date beside it.
Each hinge carries its share of the leaf through every opening of the day, and one that works loose lets the leaf drop until it drags and smoke slips through the gap above it. The lock the key turns is named in the fire door hardware guide, and closer sizes and fitting are worked through in the fire door closers guide.
Ordering for a self-storage site: one list, every door on it
The whole site order sits on one list, and each door has its own line with the leaf, the period, the lock and the closer beside it, so what arrives matches the room it was ordered for. A list that names one leaf for the whole site leaves the fitter to guess which part takes which period, and a leaf in the wrong corridor guards the wrong thing.
Each door on the order carries its own figure, and the figures are checked against the schedule one door at a time before the order is sent, because a door left off the quotation is a door the site still pays for, and a part added once the order has gone out costs more than the same part added before it. The how to specify security doors guide lists what the schedule must hold for every door, and the security door cost factors guide sets out what each step up the grade adds to the figure.
Each week the site manager walks the corridors and tries the leaves in turn, starting at the office and finishing at the loading bay. Any leaf that drags, any seal out of its groove and any closer that has lost its pull is written against its own door on the day it is found, and the repair is booked while the fault is still small. The record stays with the site file, and what the visit should cover is set out in the fire door inspection checklist.
A storage leaf holds only as long as the units behind it and the route beside it, so the period, the release and the closer must all sit on the same list.
What period should a self-storage door carry?
A storage door takes FD30 or FD60, proved to EN 1634-1, and the room behind the leaf decides which of the two it needs. The letters beside the minutes name what the doorset held back.
Can one leaf hold fire and forced entry?
Yes, a doorset proved for both jobs in one test programme carries one report that holds the proof for fire and for forced entry.
Do self-storage doors need panic hardware?
Yes, the leaf on the way out takes a panic bar proved to BS EN 1125, across at least 60 percent of the leaf, so one push throws the latch and the customers behind it can get out.
What grade should a stores door carry?
The grade follows the room: B3, C5 or D10 to LPS 1175, with the stores taking a higher category than the unit corridors.
Who checks the self-storage doors?
The site manager walks the round that covers every door, and each visit is written into the record the site keeps.
Get a free quote
Related
More in guides for specifiers
Products
One supplier for the whole building envelope
Ready to specify your project?
Free assessment, written specification and test evidence. Reply within one working day.