Warehouse gate rules: rated gates for yards, loading bays and perimeters, with the vehicle line, automation and one schedule for the whole site.

  • ✓Third-party test evidence with every product
  • ✓Written specification you can issue to tender
  • ✓Supplied and installed across the UK
Prefer to talk?+44 7352 267239

Get a free project quote

Rating, written specification and budget range within one working day.

ArxBridge Quote Form

Confidential. No cost, no obligation.

Third-party tested

Evidence with every quote

UK manufactured

Made to your sizes

One accountable team

Specify, supply, install

Confidential handling

Details never shared

A warehouse yard never sits still. Lorries reverse into bays, forklifts cross the yard, staff walk between the gatehouse and the doors, and the gates on the boundary decide which of them get in and how fast they leave. The doors on the building hold one line, and the gates on the boundary hold the other.

A gate that stops a lorry and a gate that lets a pedestrian through are two different jobs, and a warehouse that orders one gate for both has ordered the wrong gate twice. The rating, the drive, the control and the gaps beside the gate each belong on the same schedule.

The columns such a schedule needs are set out in our how to specify security doors guide, and the warehouses and logistics sector page covers the buildings the gates protect.

  • LPS 1175 B3 / C5 / D10Forced entry ratings, three, five and ten minutes
  • ISO 22343-1Vehicle security barrier ratings
  • BS EN 12453Safety in use of power operated doors
  • ProtectUK 1,200 mm / 500 mmGap cap and height floor on the vehicle line

Yards, loading bays and the perimeter: where a warehouse puts its gates

A warehouse divides into parts that meet traffic in different ways, and each part puts its gates in a different place. The main gate takes the lorries, the service gate takes deliveries and waste, the loading bays take the vehicles that dock against the building, and the pedestrian gate takes the staff who arrive on foot.

The main gate works hardest at shift change, when lorries, vans and staff arrive together. A gate that holds traffic while the reader checks each vehicle needs a lane beside it for the queue, because a lorry held on the public road blocks the road and the gate at once.

Start at the boundary and list every opening a person or a vehicle can use, from the main gate to the gap where the fence meets the wall. A rear gate onto a lane nobody watches after dark faces more risk than the staffed main entrance, so the rating follows the gate, not the warehouse. Our warehouse security doors guide covers the doors on the building itself.

Sliding, swing and cantilever: the gate that fits the opening

A sliding gate runs on a track beside the opening, a swing gate turns on hinges into the yard, and a cantilever gate hangs from a beam above the opening with no track on the ground. Each type suits a different yard, and the ground, the space and the wind decide which one fits.

A sliding gate needs room beside the opening for the leaf to run back, and a track that stays clear of grit, ice and pallets. A swing gate needs room inside the yard for the leaf to open, and a leaf that swings across a slope will drag. A cantilever gate needs no track, so it suits a yard where the ground cannot hold one, but it needs a frame strong enough to carry the leaf from above.

Wind loads the leaf like a sail, so a tall gate on an exposed site needs a drive and fixings that hold it against the gusts the site sees. A pedestrian door beside the vehicle gate keeps staff off the lorry route, and the door goes on the same order as the gate. The sliding vehicle gates page covers the sliding type in full, and the security gates page covers the gate lines.

Need this specified for your project?Free rating, written specification and budget range within one working day.
Get a free quote

The vehicle line: ISO 22343-1, mass, speed and penetration

A vehicle barrier earns its rating in a live test, with a vehicle driven at it and the result written into one string. Cars from a 1,500 kg car up to trucks of 30,000 kg are driven at 48, 64 or 80 km/h, and the string records the vehicle class, the speed, the angle and the penetration, so a rating such as V/7500[N3]/80/90:0/0 can be written straight onto the schedule for the approach.

A schedule that still names PAS 68 names a standard no test house issues against now, so ISO 22343-1:2023 is the name the order should carry. The change from PAS 68 and IWA 14-1 to the current standard is worked through in our HVM standards guide, and the ratings in full are in our ISO 22343 vehicle security barriers guide.

The gap beside a barrier and the height of the barrier both belong on the schedule, because ProtectUK guidance puts a 1,200 mm cap on the clear gap and a 500 mm floor under the height. Leave a wider gap and a vehicle slips past the barrier, and fit a lower barrier and a vehicle climbs it. The hostile vehicle mitigation page covers the line in full, and our anti-ram gates and barriers guide works through the options.

The gate that fits the yard: sliding, swing and cantilever

A warehouse yard takes the gate that fits its opening, and each type suits a different yard. A sliding gate runs along the fence line where there is room to slide, a swing gate opens inward where the yard is deep enough to take the swing, and a cantilever gate hangs clear of the ground. The gate on the order should name the type beside the opening, so the gate that arrives fits the yard it guards.

The vehicle line is the line a vehicle could drive through, and it is proved to ISO 22343-1, which supersedes PAS 68:2013. The test runs a vehicle of a set mass at a set speed into the barrier and measures how far it gets through, with masses from a 1,500 kg car to a 30,000 kg truck and speeds of 48, 64 or 80 km/h. The rating on the order names the mass, the speed and the penetration together.

The gaps between the gates need bollards and barriers of their own, because a line that stops a vehicle at the gate and leaves it open at the kerb is no line at all. The spacing on the line follows ProtectUK, with no more than 1,200 mm clear between bollards and a minimum height of 500 mm.

Access control for vehicles and staff must open for the lorries, the vans and the people who need the yard, and stay shut for the rest. The reader, the intercom and the fail safe state belong on the order beside the gate, and the fail position must be written on the order.

Powered gates and the alarm: what must open when the building empties

Powered gates must still open in an emergency, because the yard empties through the gate when the alarm sounds. The safety of a powered gate is proved to EN 12453, which sets out how a gate must behave when a person or a vehicle is in its path, and the release that lets the gate open by hand belongs on the schedule beside the motor.

The gate on the escape route must open when the alarm sounds, and it must open without a key, a code or a card. The release is tested on the round by sounding the alarm and watching the gate open.

The rooms the public never sees take a different gate from the yard, because the stores and the plant behind them hold a heavier fire load. A gate on a fire route takes the period the fire load behind it demands, so most gates take FD30 and the heaviest loads take FD60.

The round that looks after warehouse gates walks the yard, the loading bays and the perimeter in turn and looks at the motors, the rails, the locks and the release. Each fault is written against the gate it belongs to on the same day, with the part and the date beside it, so the repair follows the fault and the yard never stands open.

Position Gate Rating What to check
Main entrance Sliding gate ISO 22343-1 Motor, rail, release
Loading bay Cantilever gate ISO 22343-1 Motor, rail, lock
Staff entrance Swing gate LPS 1175 B3 Hinges, lock, closer
Escape route Swing gate Release on alarm Release, hinges, gap

Put the rating, the motor and the release on the same line as every warehouse gate on the order, so the gate that arrives is the gate that was tested. The ratings in full are set out in our ISO 22343 vehicle security barriers guide, and the rated options for the gate line are covered in our anti-ram gates and barriers guide. The automation, the safety and the release are covered in our gate automation guide, and the fences that close the line beside the gates are covered in our crash rated fences and HVM fencing guide.

The gaps between the gates: bollards, barriers and the kerb line

A gate line is only as strong as the gaps beside it. Bollards fill the space between the gate post and the wall, between the gate and the fence, and along the pavement where a vehicle could mount the kerb, so the line runs unbroken from one end of the boundary to the other.

Fixed bollards suit a gap that never needs to open, rising bollards suit a gap that must open for a vehicle and close behind it, and road blockers suit a lane where a vehicle must be stopped, not just slowed. The rating for that line comes from the vehicle test, not from the bollard alone, and our road blockers guide covers the blockers that rise from the road.

Foundations carry the rating as much as the bollard does. A bollard set in a shallow foundation pulls out under the load it was meant to stop, so the foundation depth and the fixings belong on the schedule beside the bollard. Our choosing HVM bollards guide works through the options, the security bollards page covers the bollards themselves, and the rising bollards page covers the type that rises from the road.

Powered gates that must still open in an emergency: automation, safety and the release

A powered gate moves a heavy leaf on a motor, so the safety of the people beside it belongs in the specification beside the drive. BS EN 12453 sets out the safety in use of power operated doors, and the devices on the gate, photocells, safety edges and force limits, are what keep a person clear of the leaf while it moves.

When the alarm sounds, the gate line must let people out. The release on alarm belongs on the inspection round beside the reader, because a gate that stays shut in an evacuation has failed the one job it was fitted for, and the release must work when the power is gone as well as when the alarm sounds. Our gate automation guide covers how a gate is driven, and the turnstile versus speed gate versus portal guide works through which lane suits which entrance.

Access control for vehicles and staff: who passes the gate

Access control at a warehouse gate decides which vehicles and which people pass, and when. Lorries take a tag or a number plate read, staff take a card or a fob, and a visitor with no card takes the intercom at the gatehouse, because a visitor with no other way in needs a voice at the gate.

One system should run the whole site, not one system per gate. A card that opens the main gate should open the staff areas and the service yard as well, and the office that issues the cards should be able to stop one card without stopping the rest. Readers, fobs and biometrics in the lane are covered in our security turnstiles guide.

Deliveries need a route that keeps them off the pedestrian paths. A delivery vehicle that shares a lane with staff on foot puts people beside reversing lorries, so the gate plan should separate the two, with the pedestrian gate on its own path and the vehicle gate on its own lane. The loading bay doors guide covers the bays where the vehicles dock.

The gate on the escape route: what must open when the alarm sounds

A gate that sits on an escape route must open when the alarm sounds, and the release belongs in the specification beside the reader. A pedestrian gate beside the vehicle gate gives staff a way out that does not cross the lorry lane, and the gate on the route should open in one push, without a key and without a card.

The personnel door beside the gate can carry FD30 where the route needs it, with a 4 mm gap round the leaf and a smoke seal proved to BS EN 1634-3. The closer on that door must pull the leaf shut every time, with no fire door taking less than EN 3 to BS EN 1154, and the grades and the parts behind a working fire door are covered in our fire door hardware guide.

Test the release on every inspection round, because a gate that worked last month may not work this one. The record should name the gate, the release, the test and the date, so the next team can see what was checked and what was fixed. What each check looks for is set out in the fire door inspection checklist.

Ordering for the whole site: one schedule, every gate on it

Set the enquiry out as a specification, one line for every gate on the site. Each line names the position, the gate type, the forced entry rating, the vehicle rating where one is needed, the drive and the access control, and the leaf, the frame, the fixings and the hardware as one assembly. Where a gate must resist a vehicle as well as a person, ask for the rating on the whole line, not on the leaf alone.

File the test report, the rating and the drive specification with the gate when it arrives, and write the inspection routine into the handover pack, so the record covers the whole life of the line. The keeping an LPS 1175 rating valid guide sets out what breaks a rating, and our security gates cost factors guide works through what each step up the line adds to the build.

Position Gate Rating What to check
Main vehicle gate Sliding gate ISO 22343-1 Drive, safety devices, release
Loading bay gate Swing gate LPS 1175 C5 Lock, hinges, closer
Pedestrian gate Swing security gate LPS 1175 B3 Reader, closer, latch
Service yard gate Cantilever gate LPS 1175 B3 Motor, fixings, release
Perimeter gaps Bollards and barriers ISO 22343-1 Spacing, height, foundations

A warehouse gate guards the yard, the bays and the building behind them, so the vehicle rating, the automation and the gaps beside the gate must all sit on the same schedule.

What security rating do warehouse gates need?

The site decides, by the attack each gate could face. A pedestrian gate often takes B3, a loading bay gate takes C5, and the vehicle line takes its own rating to ISO 22343-1, with the risk assessment naming the rating for each gate.

Can a warehouse gate stop a vehicle?

Only where the line carries a vehicle rating. ISO 22343-1 proves a barrier against vehicles from a 1,500 kg car to a 30,000 kg truck, at 48, 64 or 80 km/h, and the rating must name the whole line, not the gate leaf alone.

Do powered warehouse gates need to release on alarm?

Yes. A powered gate must release when the alarm sounds and fail safe when the power goes, so people can still leave, and the release belongs on the inspection round beside the reader.

What fills the gaps beside a warehouse gate?

Bollards and barriers, carrying the same vehicle rating as the gate. ProtectUK guidance caps the clear gap at 1,200 mm and sets the minimum height at 500 mm, so a wider gap lets a vehicle through beside the gate.

Who checks warehouse security gates?

The site team, on the routine the security plan sets. Each record names the gate, the fault, the repair and the date it was fixed.

Specifying security gates for a warehouse?Send the gate schedule and the site plan for a tested gate quotation.
Get a free quote

Related

More in guides for specifiers

10 mistakes when specifying certified security doors 10 steps to specify an LPS 1175 door Acceptance and Snagging of a Security Door or Barrier Job Access Control Doors Acoustic Doors: Ratings and Specification After a Forced Entry Attempt: Checking a Security Door Airport Security Doors Anti-Ligature Doors for Mental Health Wards Anti-Ram Bollards Anti-ram gates and barriers: protecting vehicle entrances Arcade Security Doors Explained Automatic Doors Automatic Gates Cost Factors Automatic Vehicle Barriers Ballistic Panels Bank Security Doors Bingo Hall Security Doors Explained Blast doors: glazed vs solid and how they are rated Blast protection window film: what it does and what it cannot do Blast resistant windows: what drives the cost and how to specify them Bollard Cost Factors Explained Bollard regulations in the UK: spacing, height and depth Bookmaker Security Doors Explained Builders Merchant Security Doors Bullet Resistant Glass Cost Factors Bullet resistant glass ratings explained: BR1 to BR7 and SG classes Bullet resistant vs bulletproof glass: what the difference means Buying Security Doors and HVM Through Public Frameworks Car Park Security Doors Explained Car Showroom Security Doors Casino Security Doors Explained CDM 2015 Duties When Security Doors, Shutters or HVM Are Installed Cinema Security Doors Cleanroom Doors Cold Store Doors College Security Doors Commissioning, Handover and the O&M Manual for Security Doors and HVM Communal entrance doors for flats: Secured by Design and what to specify Community Centre Security Doors Control Room Doors Court Security Doors Crash Rated Fences and HVM Fencing Explained Data centre physical security: doors, glazing, HVM and shielding by zone Dental Practice Security Doors Depot Security Doors Explained Door Entry Systems Due Diligence When Selecting Vehicle Security Barriers Emergency Exit Doors EMP Shielding Cost Factors Explained Exhibition Centre Fire Door Rules Exhibition Centre Security Doors Factory Security Doors Faraday cage vs RF shielded room: what a business needs FB4 vs FB6 vs FB7: how to choose a ballistic rating Fire and security doors: how dual certification works Fire Compartmentation Fire Curtains Fire Door Certification Fire Door Closers Explained Fire Door Cost Factors Fire Door Duties of the Accountable Person Fire Door Gaps Fire Door Hardware Explained Fire door inspection checklist for steel and timber doors Fire Door Maintenance Fire Door Regulations Care Homes Fire Door Regulations for A and E Departments Fire Door Regulations for Airports Explained Fire Door Regulations for Bowls Clubs Fire door regulations for commercial buildings in the UK Fire Door Regulations for Dialysis Centres Fire Door Regulations for Hockey Clubs Fire Door Regulations for Hospitals Explained Fire Door Regulations for Offices Explained Fire Door Regulations for Operating Theatres Fire Door Regulations for Retail Explained Fire Door Regulations for Schools Explained Fire Door Regulations for Snooker Clubs Fire Door Regulations for Stadiums Fire Door Regulations for Student Accommodation Fire Door Regulations for Warehouses Fire Door Regulations Leisure Centres Fire Door Regulations Restaurants Fire Door Remediation Programme for Housing Providers Fire Door Rules for Badminton Clubs Fire Door Rules for Bingo Halls Fire Door Rules for Bookmakers Fire Door Rules for Bowling Alleys Fire Door Rules for Car Parks Fire Door Rules for Car Showrooms Fire Door Rules for Cinemas Fire Door Rules for Climbing Centres Fire Door Rules for Colleges Fire Door Rules for Community Centres Fire Door Rules for Cricket Clubs Fire Door Rules for Dental Practices Fire Door Rules for Depots Explained Fire Door Rules for Golf Clubs Fire Door Rules for GP Surgeries Fire Door Rules for Gyms Explained Fire Door Rules for Ice Rinks Fire Door Rules for Maternity Units Fire Door Rules for Mental Health Units Fire Door Rules for Museums Fire Door Rules for Oncology Units Fire Door Rules for Opticians Fire Door Rules for Pawnbrokers Fire Door Rules for Petrol Stations Fire Door Rules for Pharmacies Fire Door Rules for Ports Fire Door Rules for Post Offices Fire Door Rules for Prisons Fire Door Rules for Rehabilitation Centres Fire Door Rules for Self Storage Fire Door Rules for Shopping Centres Fire Door Rules for Squash Clubs Fire Door Rules for Supermarkets Fire Door Rules for Swimming Pools Fire Door Rules for Tennis Clubs Fire Door Rules for Theatres Fire Door Rules for UK Arcades Fire Door Rules for UK Casinos Fire Door Rules for UK Hospices Fire Door Rules for Walk-in Centres Fire Door Signage Fire Door Vision Panels Fire Doors and Gateway 2 in Higher-Risk Buildings Fire Rated Glass Cost Explained Fire Rated Sliding Doors Explained Fire Rated Windows Cost Factors Fire Rated Windows Explained Fire Safety Enforcement Notices and Fire Doors: What the Responsible Person Must Do Flat Entrance Doors: PAS 24 and Fire Rated Forced Entry vs Ballistic vs Blast: Which Rating a Site Needs Garage Security Doors Explained Gate Automation Explained Golden Thread Records for Fire Doors GP Surgery Security Doors Explained Gym Security Doors Explained High Speed Doors HMO Fire Doors Hospice Security Doors Explained Hospital Security Doors: Wards, A&E, Plant Hospital Security Gates Hotel Fire Doors Hotel Security Doors How to choose HVM bollards: fixed, shallow mount, removable and automatic How to keep an LPS 1175 door rating valid after installation How to Specify Fire Doors in a Housing Tender How to specify security doors: a checklist for architects How to Verify a Secured by Design Listing How to Verify an LPS 1175 Certificate on Red Book Live How to Write an Operational Requirement for Physical Security HVM planters and street furniture: protection that blends in In-Service Care of Vehicle Security Barriers Installation Handover: LPS 1175 Doors and PAS 68 Barriers Intumescent Seals ISO 16933 explained: EXV and SB classes and hazard ratings ISO 22343 vehicle security barriers explained Keeping a Dual-Certified Fire and Security Door Valid in Service Laboratory Security Doors Layered Security for a Site: Deter, Detect, Delay, Mitigate, Respond Lead Times and Programme Risks for LPS 1175 Doors Leisure Centre Security Doors Library Security Doors Listed Building Fire Doors Loading Bay Doors Explained Lockdown and Access Control Hardware on an LPS 1175 Door LPS 1175 Gates and Grilles Explained LPS 1175 Issue 8 explained: from SR1 to SR8 to A1 to H20 LPS 1175 Roller Shutters LPS 1175 vs ASTM F2781 and Other US Ratings Explained LPS 1175 vs EN 1627: how UK and European burglar resistance ratings compare LPS 1175 vs PAS 24: which security standard does your door need? LPS 1175 Windows and Walling Explained Martyn’s Law and Places of Worship: What a Buyer Checks for Doors and Entry Control Martyn’s Law Enhanced Tier: Physical Measures and the Specifier Brief Martyn’s Law Standard Tier: Procedures, Doors and Shutters Martyn’s Law Timeline and the SIA Regulator Martyn’s Law: what premises must do and which physical measures to consider Master Key Systems MRI and RF shielded rooms: how they work and what to specify Museum Security Doors NPSA Catalogue of Security Equipment (CSE) Explained NPSA Forced Entry and Blast Guidance for Government Sites NPSA Guidance on Lockdown and Marauding Attack: What It Asks of Doors and Entrances Office Security Doors Optician Security Doors Explained Panic Hardware PAS 24 requirements for doors and windows explained PAS 68 Bollard Foundations Explained PAS 68 bollards: ratings, spacing and cost factors PAS 68 vs IWA 14 vs ISO 22343: hostile vehicle mitigation standards explained Pawnbroker Security Doors Explained Pedestrian Gates Petrol Station Security Doors Pharmacy Security Doors Planning Permission for Security Shutters, Gates and Bollards on Commercial Premises Plant room doors: fire, security and ventilation requirements Plant Room Fire Doors Port Security Doors Post Office Security Doors Explained Powder coating vs galvanising vs paint for steel Preliminary Market Engagement for Security Doors and HVM Prison Security Doors Programming a Security Door and Barrier Package on a Live Site Public-Sector Tender Response Checklist for Security Door and HVM Supply Reading a PAS 24 and SBD Door Test Report Regulation 38 Fire Safety Information at Handover for Fire-Rated Security Doorsets Replacing Security Doors in an Occupied Building Restaurant Security Doors Retail Security Doors Revolving Doors RF shielding standards and how shielded rooms are tested Rising Bollard Cost Factors Road Blocker Cost Factors Explained Road Blockers Explained Roller Shutter Cost Factors: What Drives the Price Roller shutter regulations in the UK: safety and maintenance Safe room and panic room doors: specification basics Safety Duties for Powered Doors, Gates and Barriers on Commercial Sites School Security Doors Sectional Doors Secured by Design explained: is it mandatory for doors? Secured by Design vs NPSA vs LPCB: Which One You Need Security Door Locks Security Door Maintenance Checklist Security Doors and Access for Everyone: What Approved Document M Asks Security Doors for A and E Departments Security Doors for Badminton Clubs Security Doors for Bowling Alleys Security Doors for Bowls Clubs Security Doors for Climbing Centres Security Doors for Cricket Clubs Security Doors for Dialysis Centres Security Doors for Golf Clubs Security Doors for Hockey Clubs Security Doors for Ice Rinks Security Doors for Maternity Units Security Doors for Mental Health Units Security Doors for Oncology Units Security Doors for Operating Theatres Security Doors for Rehabilitation Centres Security Doors for Snooker Clubs Security Doors for Squash Clubs Security Doors for Swimming Pools Security Doors for Tennis Clubs Security Doors for Walk-in Centres Security Doors West Midlands Explained Security Fencing Security Gates Cost Factors Explained Security shutters vs high performance roller doors Security shutters vs retractable grilles: which suits retail and commercial openings? Security Turnstiles Explained Security Window Film Security Windows for Schools Explained Self Storage Security Doors Server Room Doors Explained Shopping Centre Security Doors Smoke Control Doors Explained Smoke Curtains Specification Mistakes When Mixing LPS 1175, PAS 24 and SBD in One Tender SR2 vs SR3 vs SR4 security doors: choosing the right LPS 1175 level Stadium Security Doors Steel Door Frames Steel vs aluminium security doors: strength, ratings and looks Steel vs timber fire doors: which suits your building? Student Accommodation Security Doors Substation doors: security, ventilation and specification Supermarket Security Doors Telescopic Bollards Tender Evaluation Criteria and Scoring for Security Doors and HVM The Scope of a Maintenance Contract for Security Doors and Barriers Theatre Security Doors Thermal and Weather Performance of External Security Doorsets Thermally broken steel security doors: U-values and certification Traffic Calming as Hostile Vehicle Mitigation Transport hub security requirements Turnstile Cost Factors Explained Turnstile vs speed gate vs security portal: choosing entrance control Types of security doors for commercial buildings University Security Doors Explained Vehicle Dynamics Assessment: What It Tells the Buyer Before a Barrier Is Specified Warehouse Security Doors Explained Warranty, Defects Liability and Guarantees for Security Doors and Barriers What affects the cost of a bullet resistant door What affects the cost of a high-security door in the UK Window Security Bars View all →

Products

One supplier for the whole building envelope

Ready to specify your project?

Free assessment, written specification and test evidence. Reply within one working day.