Road Blocker Cost Factors Explained

What sets a road blocker quote: lane width and flow, wedge or rising plate, rating step, pit and foundations, power, duty cycle and controls. Factors only.

  • ✓Third-party test evidence with every product
  • ✓Written specification you can issue to tender
  • ✓Supplied and installed across the UK
Prefer to talk?+44 7352 267239

Get a free project quote

Rating, written specification and budget range within one working day.

ArxBridge Quote Form

Confidential. No cost, no obligation.

Third-party tested

Evidence with every quote

UK manufactured

Made to your sizes

One accountable team

Specify, supply, install

Confidential handling

Details never shared

A road blocker quote has no standard figure. The quote turns on the lane, the rating, the shape of the plate, the pit and the foundations, the power and the drive, the daily cycle, the controls and the service routine. Two entrances that look the same from the road can carry very different quotes, because the parts that set the figure sit below the road surface, inside the pit and inside the drive. Compare quotes like for like: same lane width, same rating with test evidence, same plate shape, same pit and foundation detail and same fitting scope. A quote that leaves out the pit, the drainage or the service routine is not cheaper. It is a different entrance.

The factors below follow the order a quote is built in. Start with the lane and the ground, then the shape of the plate, then the rating, then the pit and the foundations, then power and the drive, then the ground works and the controls. Our road blockers guide works through the two shapes, the rating and the pit in full, our hostile vehicle mitigation page covers the whole line of defence, and our guide to choosing HVM bollards compares the bollard side of the same decision.

This page names no figures, because a figure without the lane, the rating and the pit behind it would mislead. What follows is what each factor changes and what to ask for, so a quote can be read on its own terms and two quotes can be compared fairly.

  • ISO 22343-1:2023Current vehicle barrier test standard
  • Fastest cycle timeOf any anti-ram option
  • 1,200 mmMaximum clear gap in a rated line
  • Pit and foundationsThe part of the quote below the road

The lane sets the baseline: width, flow and the ground under it

Every road blocker quote starts with the lane: the width of the opening to close and the flow of vehicles it must pass. A blocker closes one lane, so a wide entrance needs more than one blocker, and each blocker adds a plate, a pit, a drive and fitting time. The flow decides the drive: a car park entry passes vehicles all day with short gaps between them, a service yard passes lorries in bursts, and a depot entrance passes a steady stream from the first shift to the last. A lane measured wrong produces a quote for an entrance that does not close, and the gap at the end is the weak point a vehicle will find.

The ground decides the pit before the blocker is chosen. Firm ground takes a deep foundation, ground with services or shallow cover takes a shallow structure, and soft or made ground needs a design of its own. Venues that expect duties under Martyn’s Law, which sets tiers for premises that hold 200 or more people, should start from the threat vehicle and the speed it could reach on the approach. Our ISO 22343 vehicle security barriers guide explains how to read the rating, and our vehicle impact ratings page sets out how the three standards sit together.

Access decides the shape before the rating is chosen. A lane that must stay open to traffic all day takes a blocker, a route that can close permanently takes fixed bollards, and a pedestrian route takes a gate of its own. Our rising bollards page covers the bollard that moves for a lane that must open for authorised vehicles. List every opening separately, with its own width, flow and ground, rather than asking for a single figure for the site.

Wedge or rising plate: the shape decides the quote

A rising plate blocker is a flat plate that rises vertically from a pit to block the full width of the lane. When it is down it sits flush with the road surface, so vehicles drive over it. When it rises, the plate stands across the lane from kerb to kerb, so there is no gap beside it for a vehicle to use. It suits a lane where the approach is short and the vehicle arrives slowly.

A wedge blocker is a wedge shaped plate that rises from the pit and presents an angled face to an approaching vehicle, guiding the front of the vehicle upward while the barrier takes the load. It suits a straight approach where a vehicle could arrive at speed, and the shape is chosen for the approach, not for the rating. Both shapes sit flush when down and both close the lane when up, and the choice between them does not change the foundation rule: the rating covers the installed system, not the product on its own.

A blocker that carries no rating is a traffic device, not a security barrier. It may control the flow of vehicles, but it has no test evidence behind it and no rating to check. Ask for the test evidence by name before the order is placed, and ask for the full rating, not the standard alone. Our road blockers guide works through the two shapes in full.

Need this specified for your project?Free rating, written specification and budget range within one working day.
Get a free quote

The rating step: PAS 68, IWA 14-1 and ISO 22343 on one blocker

A rating is the largest single step in a road blocker quote after the lane itself. A rating states the vehicle stopped, the speed, the angle and how far the vehicle travelled past the line. The example rating V/7500[N3]/80/90:0/0 shows the parts: the vehicle type and mass, the impact speed, the impact angle and the penetration distance. Each step up needs a heavier plate, a stronger pit and its own test evidence, and each step changes the quote.

The impact rating is tested under PAS 68, IWA 14-1 or ISO 22343-1:2023, which supersedes PAS 68:2013 and cancels and replaces IWA 14-1:2013. Test vehicles run from a 1,500 kg car to a 30,000 kg truck, and test speeds are 48, 64 and 80 km per hour. A 1,500 kg car at 48 km per hour suits urban footways, forecourts and retail frontages, a 2,500 kg 4×4 at 64 km per hour suits city centres and venue approaches, and a 7,500 kg truck at 80 km per hour suits government sites and critical infrastructure. Start from the threat vehicle and the speed it could reach on the approach, and ask for the test report, not the rating string alone.

The rating belongs to the complete tested installation, not to the plate alone. The pit, the foundations and the ground are part of the tested blocker, so a rated plate in an untested pit is not a rated blocker. Ask for the certificate naming the exact blocker, its pit detail and its configuration. A certificate for a different model does not cover the order, and a blocker described as heavy duty without a certificate has no proven rating at all. ISO 22343-1 Part 2 covers selection, installation and use, and Part 1 proves what a barrier stopped on the test track. Our PAS 68 bollards guide works through the same rating on a bollard line.

The pit and the foundations: where the quote really lives

The pit does the stopping, not the plate. The impact load travels down the plate and into the pit and the foundations, and the foundations are what hold the line. A deep foundation is a concrete block that spreads the load into the ground below, while a shallow foundation is a wider raft that spreads the load across the surface where depth is limited. Our PAS 68 bollard foundations guide sets out the deep and shallow choice in full.

The rating covers the blocker on its tested foundation, in tested ground. A blocker that passed its test in one foundation detail does not carry the rating in a different one, and a pit built without the design behind it is a guess, not a rating. Ask for the foundation design with the order, naming the depth, the width, the concrete and the ground it was designed for.

The pit must drain. Standing water in a pit corrodes the mechanism, freezes in cold weather and can stop the plate rising when it is needed. Drainage is part of the specification, not an afterthought, and the pit detail should show how water leaves it. A quote that prices the plate without the pit is not a quote for a rated line, and every blocker in a line needs the same tested foundation, not just the ones in easy ground.

The rating step: what the vehicle test adds to the quote

A road blocker is priced as a line, not as a plate. The lane width, the flow of vehicles through it, the ground under it and the rating it must carry set the starting point, and every part after them adds its own line to the quote.

The rating on a road blocker comes from a live test, with a vehicle driven at it and the result written into one string. ISO 22343-1:2023 is the standard a schedule should name now, and it supersedes PAS 68:2013, so a line that still asks for PAS 68 asks for a rating no test house issues. The test covers vehicles from a 1,500 kg car to a 30,000 kg truck, driven at 48, 64 or 80 km/h, and the string records the vehicle class, the speed, the angle and the penetration.

Each step up the rating adds steel, depth and foundation to the blocker, because a heavier vehicle at a higher speed needs more to stop it. A rating above the threat adds weight and ground works without adding safety, so the rating on the order should match the vehicle the lane must stop. The ratings in full are in our ISO 22343 vehicle security barriers guide.

A wedge blocker and a rising plate blocker do the same job in different shapes, and the shape decides the pit, the mechanism and the quote. The wedge rises from the road and the plate lifts flat, so the choice follows the lane, the flow and the ground, not the catalogue. Our road blockers guide covers the blockers that rise from the road.

The lane sets the baseline: its width decides how many blockers the line needs, its flow decides how often each one cycles, and the ground under it decides what the pit must be built into. A lane that carries heavy vehicles all day needs a blocker built for that cycle, and the cycle count belongs on the schedule beside the rating.

Power, hydraulics and the lane that must keep working

The blocker is driven by power and hydraulics, and the motor, the pump and the hoses all add lines to the quote. A blocker that must rise in seconds needs a power supply that can give it, and the supply is sized for the cycle, not for the plate alone.

The pit is dug into ground that may hold cables, drains and services, so the ground works, the utilities and the consent the quote must cover all sit on the same schedule. A survey before the dig finds what lies under the lane, and the consent for the works is sought before the order is placed.

The people around the lane need a way through that does not lift the blocker, so access control, safety devices and the pedestrian route sit beside the blocker on the order. The safety devices stop the plate from rising under a vehicle or a person, and the release on alarm lets the lane open when it must. The options are worked through in our anti-ram gates and barriers guide, and the choosing HVM bollards guide works through the options for the gaps beside the lane.

When the power goes, the blocker must fail in the position the site needs, and the position is named on the schedule before the order is placed. A blocker that stays up traps vehicles inside, and a blocker that drops lets them through, so the site decides which failure it can live with.

What sets the cost Why it adds What the order names
Rating More steel, deeper pit Vehicle, speed, angle
Lane width and flow More blockers, more cycles Width, flow, cycle count
Pit and foundations Dig, concrete, drainage Depth, ground, drainage
Power and hydraulics Motor, pump, supply Power, cycle time

Compare quotes line by line, rating, lane, pit, power and safety, so the cheaper quote is not the one that left a line out.

Power, hydraulics and the daily cycle of a blocker

A road blocker needs a dedicated electrical supply, planned before the civil work begins. The supply should be agreed with the blocker design early, with ducting laid before the ground is finished, and each powered part needs its own supply, with cable routes that do not cross the pedestrian line, so a fault in one part does not take the whole line down.

Duty cycle is how often the blocker moves, and it decides whether the drive lasts years or months. A blocker on a quiet entrance moves a few times a day and rests between movements, while a blocker on a busy entrance moves all day, with vehicles arriving and leaving from the first shift to the last. A drive worked harder than its rating will run hot, slow and wear out early. A road blocker gives the fastest cycle time of any anti-ram option, which is why it is the choice where the flow never stops, and the flow figure should sit in the enquiry so the drive is sized correctly. Count how often the blocker will move on the busiest day the site sees, and give that figure to the supplier before the drive is chosen.

The drive is hydraulics or electrics, and both need regular servicing of the moving parts. The guides, the seals and the drive wear with every cycle, and a blocker that is never serviced will fail at the moment it is needed. The service routine should be written into the handover pack, with the intervals the supplier states. What happens when the power fails must be agreed in advance: a blocker that fails down leaves the line open, and a blocker that fails up blocks the vehicles that need to pass, so ask how each failure is handled and how staff release the blocker by hand, and test the fail state at handover with the power off.

Ground works, utilities and the consent the quote must cover

Utilities sit at foundation depth under most entrances. Cables, drains, gas and water run under roads and yards, and a pit dug without a map will find them the hard way. Map the utilities before the order is placed, and let the map decide where each blocker can stand and how deep its pit can go. A ground survey finds what sits below the surface, how firm the ground is and where the water sits, and the design follows what the survey finds.

Consent sits beside the digging. A line on the highway needs consent from the highway authority, a line that changes the street needs planning consent, and a line that closes a road needs a temporary traffic order. Where any part of the works touches public land, the council route runs separately from the security design, and planning approval, where it is needed, runs on its own timetable. Start the planning early, and put the time it takes in the programme from the start.

Access for plant and traffic management are part of the quote too. An entrance on a busy road needs barriers, signs and a working area kept clear, and a yard that must stay open needs the work done without closing the route vehicles use. The reinstatement after the digging, the surface made good and the markings repainted, belongs in the quote, not after it.

Access control, safety devices and the people around the lane

Access control decides who may lower the blocker and when. A key switch, a code or a remote release are the usual methods, and the choice follows who needs to pass and how often. The method should be agreed before the line is built, not improvised after it, and the routine for changing codes and issuing keys should be written down with the rest of the site procedure. The control system should keep a record of who lowered the blocker and when.

Safety in use of power operated doors is covered by EN 12453, and the safety devices must be fitted and working before the blocker is put into service. A blocker must not close on a vehicle or a person, and the safety devices need scheduled checks like any other part of the system. Our gate automation guide works through EN 12453, EN 12445 and the devices that stop a leaf, and the same discipline applies to the plate in the road.

Pedestrians need a separate route with its own gate and access control, kept clear of the moving plate. Walking through the vehicle lane exposes people to moving steel and lets an attacker tailgate a legitimate vehicle. A turnstile lane beside the vehicle route handles foot traffic without opening the vehicle lane, and our turnstile, speed gate and portal guide compares the three ways of moving people through a line. Emergency access must be agreed before the line is built: fire, ambulance and police vehicles must be able to pass, and the method must be agreed with the services.

Reading two road blocker quotes side by side: what to check before you order

Ordering a road blocker is a specification exercise, not a shopping exercise. The order should name the lane width and flow, the rating with its test evidence, the plate shape, the pit and foundation detail, the power and the drive, the access control and the safety devices, the finish and the service routine. Our how to specify security doors guide covers the same discipline for rated doors, and the same habit serves a blocker line.

Read two quotes side by side against the same list: same lane width and flow, same rating with test evidence, same plate shape, same pit and foundation detail, same ground works with utilities survey, same power and drive, same access control and safety devices, same finish, same evidence pack and same service routine. A quote that leaves out the pit, the drainage, the power or the evidence is not cheaper. It is a different entrance, and the missing parts will be bought later, when the entrance is already in use.

Finally, order the evidence with the blocker. The test report, the foundation drawing and the service schedule should arrive with the blocker, and the handover pack should name the inspection routine the site will follow. A site that files the evidence on the day the blocker arrives has a record it can use for the whole life of the line. For the wider entrance the blocker stands in, our hostile vehicle mitigation page covers the whole line of defence, our security gates cost factors guide covers the gate side in the same factors-only form, and our bollard cost factors guide covers the bollard line in the same factors-only form.

Factor What changes it What to ask
Lane and flow Opening width, vehicle flow, ground Lane schedule, flow on the busiest day
Plate shape Wedge or rising plate, approach speed Shape, approach, rating
Rating ISO 22343 step, threat vehicle, speed Certificate naming the exact blocker
Pit and foundations Depth, width, drainage, services Foundation design, pit detail, utility map
Power, drive and duty cycle Supply, hydraulics, movements per day Power plan, drive type, fail state
Controls and safety Access method, EN 12453 devices, record Control list, safety devices, log

A cheaper quote that leaves out the pit, the drainage or the service routine is not cheaper. It is a different entrance.

Why is there no standard price for a road blocker?

No two entrances are alike. The lane width, the flow, the rating, the plate shape, the pit, the power and the ground works all differ from site to site, so a figure without those behind it would mislead. A quote is built from the lane schedule and the rating, and the only fair comparison is between two quotes for the same lane, rating and pit.

What is the biggest single factor in a road blocker quote?

The lane and the rating step, taken together. A wide entrance needs more blockers, more pits and more fitting time, and each step up in rating needs a heavier plate, a stronger pit and its own test evidence. After those two, the pit and the ground works are the next steps.

Does a wedge blocker cost more than a rising plate blocker?

In general terms, the two shapes are quoted on the same factors: the lane, the rating, the pit and the drive. The shape follows the approach, a wedge for a straight approach where a vehicle could arrive at speed and a rising plate for a short approach, and the two should never be compared as if the shape alone set the quote.

What does the pit do to the quote?

The pit is often the largest part of the ground works. A deep pit needs more digging, more concrete and more time than a shallow structure, and ground with services needs a survey and a design of its own. A quote that leaves the pit out is not a road blocker quote at all.

What should a road blocker quote include?

The blockers, the pits and foundations, the utilities survey, the power and the drive, the access control and safety devices, the finish, the test evidence and the service routine. Ask for each item by name before the order is placed, and compare two quotes against the same list.

Specifying a road blocker for an entrance?Send the lane width, the daily flow and the threat vehicle for a tested blocker quotation.
Get a free quote

Related

More in guides for specifiers

10 mistakes when specifying certified security doors 10 steps to specify an LPS 1175 door Acceptance and Snagging of a Security Door or Barrier Job Access Control Doors Acoustic Doors: Ratings and Specification After a Forced Entry Attempt: Checking a Security Door Airport Security Doors Anti-Ligature Doors for Mental Health Wards Anti-Ram Bollards Anti-ram gates and barriers: protecting vehicle entrances Arcade Security Doors Explained Automatic Doors Automatic Gates Cost Factors Automatic Vehicle Barriers Ballistic Panels Bank Security Doors Bingo Hall Security Doors Explained Blast doors: glazed vs solid and how they are rated Blast protection window film: what it does and what it cannot do Blast resistant windows: what drives the cost and how to specify them Bollard Cost Factors Explained Bollard regulations in the UK: spacing, height and depth Bookmaker Security Doors Explained Builders Merchant Security Doors Bullet Resistant Glass Cost Factors Bullet resistant glass ratings explained: BR1 to BR7 and SG classes Bullet resistant vs bulletproof glass: what the difference means Buying Security Doors and HVM Through Public Frameworks Car Park Security Doors Explained Car Showroom Security Doors Casino Security Doors Explained CDM 2015 Duties When Security Doors, Shutters or HVM Are Installed Cinema Security Doors Cleanroom Doors Cold Store Doors College Security Doors Commissioning, Handover and the O&M Manual for Security Doors and HVM Communal entrance doors for flats: Secured by Design and what to specify Community Centre Security Doors Control Room Doors Court Security Doors Crash Rated Fences and HVM Fencing Explained Data centre physical security: doors, glazing, HVM and shielding by zone Dental Practice Security Doors Depot Security Doors Explained Door Entry Systems Due Diligence When Selecting Vehicle Security Barriers Emergency Exit Doors EMP Shielding Cost Factors Explained Exhibition Centre Fire Door Rules Exhibition Centre Security Doors Factory Security Doors Faraday cage vs RF shielded room: what a business needs FB4 vs FB6 vs FB7: how to choose a ballistic rating Fire and security doors: how dual certification works Fire Compartmentation Fire Curtains Fire Door Certification Fire Door Closers Explained Fire Door Cost Factors Fire Door Duties of the Accountable Person Fire Door Gaps Fire Door Hardware Explained Fire door inspection checklist for steel and timber doors Fire Door Maintenance Fire Door Regulations Care Homes Fire Door Regulations for A and E Departments Fire Door Regulations for Airports Explained Fire Door Regulations for Bowls Clubs Fire door regulations for commercial buildings in the UK Fire Door Regulations for Dialysis Centres Fire Door Regulations for Hockey Clubs Fire Door Regulations for Hospitals Explained Fire Door Regulations for Offices Explained Fire Door Regulations for Operating Theatres Fire Door Regulations for Retail Explained Fire Door Regulations for Schools Explained Fire Door Regulations for Snooker Clubs Fire Door Regulations for Stadiums Fire Door Regulations for Student Accommodation Fire Door Regulations for Warehouses Fire Door Regulations Leisure Centres Fire Door Regulations Restaurants Fire Door Remediation Programme for Housing Providers Fire Door Rules for Badminton Clubs Fire Door Rules for Bingo Halls Fire Door Rules for Bookmakers Fire Door Rules for Bowling Alleys Fire Door Rules for Car Parks Fire Door Rules for Car Showrooms Fire Door Rules for Cinemas Fire Door Rules for Climbing Centres Fire Door Rules for Colleges Fire Door Rules for Community Centres Fire Door Rules for Cricket Clubs Fire Door Rules for Dental Practices Fire Door Rules for Depots Explained Fire Door Rules for Golf Clubs Fire Door Rules for GP Surgeries Fire Door Rules for Gyms Explained Fire Door Rules for Ice Rinks Fire Door Rules for Maternity Units Fire Door Rules for Mental Health Units Fire Door Rules for Museums Fire Door Rules for Oncology Units Fire Door Rules for Opticians Fire Door Rules for Pawnbrokers Fire Door Rules for Petrol Stations Fire Door Rules for Pharmacies Fire Door Rules for Ports Fire Door Rules for Post Offices Fire Door Rules for Prisons Fire Door Rules for Rehabilitation Centres Fire Door Rules for Self Storage Fire Door Rules for Shopping Centres Fire Door Rules for Squash Clubs Fire Door Rules for Supermarkets Fire Door Rules for Swimming Pools Fire Door Rules for Tennis Clubs Fire Door Rules for Theatres Fire Door Rules for UK Arcades Fire Door Rules for UK Casinos Fire Door Rules for UK Hospices Fire Door Rules for Walk-in Centres Fire Door Signage Fire Door Vision Panels Fire Doors and Gateway 2 in Higher-Risk Buildings Fire Rated Glass Cost Explained Fire Rated Sliding Doors Explained Fire Rated Windows Cost Factors Fire Rated Windows Explained Fire Safety Enforcement Notices and Fire Doors: What the Responsible Person Must Do Flat Entrance Doors: PAS 24 and Fire Rated Forced Entry vs Ballistic vs Blast: Which Rating a Site Needs Garage Security Doors Explained Gate Automation Explained Golden Thread Records for Fire Doors GP Surgery Security Doors Explained Gym Security Doors Explained High Speed Doors HMO Fire Doors Hospice Security Doors Explained Hospital Security Doors: Wards, A&E, Plant Hospital Security Gates Hotel Fire Doors Hotel Security Doors How to choose HVM bollards: fixed, shallow mount, removable and automatic How to keep an LPS 1175 door rating valid after installation How to Specify Fire Doors in a Housing Tender How to specify security doors: a checklist for architects How to Verify a Secured by Design Listing How to Verify an LPS 1175 Certificate on Red Book Live How to Write an Operational Requirement for Physical Security HVM planters and street furniture: protection that blends in In-Service Care of Vehicle Security Barriers Installation Handover: LPS 1175 Doors and PAS 68 Barriers Intumescent Seals ISO 16933 explained: EXV and SB classes and hazard ratings ISO 22343 vehicle security barriers explained Keeping a Dual-Certified Fire and Security Door Valid in Service Laboratory Security Doors Layered Security for a Site: Deter, Detect, Delay, Mitigate, Respond Lead Times and Programme Risks for LPS 1175 Doors Leisure Centre Security Doors Library Security Doors Listed Building Fire Doors Loading Bay Doors Explained Lockdown and Access Control Hardware on an LPS 1175 Door LPS 1175 Gates and Grilles Explained LPS 1175 Issue 8 explained: from SR1 to SR8 to A1 to H20 LPS 1175 Roller Shutters LPS 1175 vs ASTM F2781 and Other US Ratings Explained LPS 1175 vs EN 1627: how UK and European burglar resistance ratings compare LPS 1175 vs PAS 24: which security standard does your door need? LPS 1175 Windows and Walling Explained Martyn’s Law and Places of Worship: What a Buyer Checks for Doors and Entry Control Martyn’s Law Enhanced Tier: Physical Measures and the Specifier Brief Martyn’s Law Standard Tier: Procedures, Doors and Shutters Martyn’s Law Timeline and the SIA Regulator Martyn’s Law: what premises must do and which physical measures to consider Master Key Systems MRI and RF shielded rooms: how they work and what to specify Museum Security Doors NPSA Catalogue of Security Equipment (CSE) Explained NPSA Forced Entry and Blast Guidance for Government Sites NPSA Guidance on Lockdown and Marauding Attack: What It Asks of Doors and Entrances Office Security Doors Optician Security Doors Explained Panic Hardware PAS 24 requirements for doors and windows explained PAS 68 Bollard Foundations Explained PAS 68 bollards: ratings, spacing and cost factors PAS 68 vs IWA 14 vs ISO 22343: hostile vehicle mitigation standards explained Pawnbroker Security Doors Explained Pedestrian Gates Petrol Station Security Doors Pharmacy Security Doors Planning Permission for Security Shutters, Gates and Bollards on Commercial Premises Plant room doors: fire, security and ventilation requirements Plant Room Fire Doors Port Security Doors Post Office Security Doors Explained Powder coating vs galvanising vs paint for steel Preliminary Market Engagement for Security Doors and HVM Prison Security Doors Programming a Security Door and Barrier Package on a Live Site Public-Sector Tender Response Checklist for Security Door and HVM Supply Reading a PAS 24 and SBD Door Test Report Regulation 38 Fire Safety Information at Handover for Fire-Rated Security Doorsets Replacing Security Doors in an Occupied Building Restaurant Security Doors Retail Security Doors Revolving Doors RF shielding standards and how shielded rooms are tested Rising Bollard Cost Factors Road Blockers Explained Roller Shutter Cost Factors: What Drives the Price Roller shutter regulations in the UK: safety and maintenance Safe room and panic room doors: specification basics Safety Duties for Powered Doors, Gates and Barriers on Commercial Sites School Security Doors Sectional Doors Secured by Design explained: is it mandatory for doors? Secured by Design vs NPSA vs LPCB: Which One You Need Security Door Locks Security Door Maintenance Checklist Security Doors and Access for Everyone: What Approved Document M Asks Security Doors for A and E Departments Security Doors for Badminton Clubs Security Doors for Bowling Alleys Security Doors for Bowls Clubs Security Doors for Climbing Centres Security Doors for Cricket Clubs Security Doors for Dialysis Centres Security Doors for Golf Clubs Security Doors for Hockey Clubs Security Doors for Ice Rinks Security Doors for Maternity Units Security Doors for Mental Health Units Security Doors for Oncology Units Security Doors for Operating Theatres Security Doors for Rehabilitation Centres Security Doors for Snooker Clubs Security Doors for Squash Clubs Security Doors for Swimming Pools Security Doors for Tennis Clubs Security Doors for Walk-in Centres Security Doors West Midlands Explained Security Fencing Security Gates Cost Factors Explained Security shutters vs high performance roller doors Security shutters vs retractable grilles: which suits retail and commercial openings? Security Turnstiles Explained Security Window Film Security Windows for Schools Explained Self Storage Security Doors Server Room Doors Explained Shopping Centre Security Doors Smoke Control Doors Explained Smoke Curtains Specification Mistakes When Mixing LPS 1175, PAS 24 and SBD in One Tender SR2 vs SR3 vs SR4 security doors: choosing the right LPS 1175 level Stadium Security Doors Steel Door Frames Steel vs aluminium security doors: strength, ratings and looks Steel vs timber fire doors: which suits your building? Student Accommodation Security Doors Substation doors: security, ventilation and specification Supermarket Security Doors Telescopic Bollards Tender Evaluation Criteria and Scoring for Security Doors and HVM The Scope of a Maintenance Contract for Security Doors and Barriers Theatre Security Doors Thermal and Weather Performance of External Security Doorsets Thermally broken steel security doors: U-values and certification Traffic Calming as Hostile Vehicle Mitigation Transport hub security requirements Turnstile Cost Factors Explained Turnstile vs speed gate vs security portal: choosing entrance control Types of security doors for commercial buildings University Security Doors Explained Vehicle Dynamics Assessment: What It Tells the Buyer Before a Barrier Is Specified Warehouse Security Doors Explained Warehouse Security Gates Warranty, Defects Liability and Guarantees for Security Doors and Barriers What affects the cost of a bullet resistant door What affects the cost of a high-security door in the UK Window Security Bars View all →

Products

One supplier for the whole building envelope

Ready to specify your project?

Free assessment, written specification and test evidence. Reply within one working day.