Gate Automation Explained

Sliding or swing, safety to EN 12453, access control and duty cycle: how to choose and specify an automated gate for a busy UK site entrance.

  • ✓Third-party test evidence with every product
  • ✓Written specification you can issue to tender
  • ✓Supplied and installed across the UK
Prefer to talk?+44 7352 267239

Get a free project quote

Rating, written specification and budget range within one working day.

ArxBridge Quote Form

Confidential. No cost, no obligation.

Third-party tested

Evidence with every quote

UK manufactured

Made to your sizes

One accountable team

Specify, supply, install

Confidential handling

Details never shared

An automated gate is a leaf, an operator and a safety system ordered as one assembly. The leaf keeps the entrance closed, the operator moves it, and the safety devices decide when the leaf must stop. A gate that is specified as three separate purchases usually fails at the joints between them: the operator is too light for the leaf, the safety devices do not match the way the site uses the entrance, or the ground and the power were planned after the gate was ordered. Treat the three parts as one decision, because the entrance only works when they are ordered together.

Most automated gates in the UK are sliding or swing, and the choice between them is made by the ground, the space beside the entrance and the traffic that passes through it. A sliding leaf runs along the fence line and needs a run for the track or room for the overhang; a swing leaf opens in an arc and needs clear ground on one side. Neither type is better in itself. The right type is the one the site can support without rebuilding the entrance around it.

Safety sits above speed. EN 12453 covers safety in use of power operated doors, and EN 12445 covers the test methods for them. The safety design follows a risk assessment of the entrance: who walks past the leaf, where children and vehicles cross, and what happens when power fails. A gate that opens quickly but puts a pedestrian in the path of the leaf is a gate that was specified the wrong way round. Our security gates page covers the rated gate range, and our sliding vehicle gates page works through the sliding type in detail.

  • EN 12453Safety in use of power operated doors, current edition 2017 plus A1:2021
  • EN 12445Test methods for power operated doors
  • Duty cycleMatch the operator to how often the gate moves each day
  • Manual releaseEvery automated gate must open by hand when power fails

The operator is the gate: leaf, motor and controls as one assembly

The operator is the motor, the gearbox and the controls that drive the leaf, and it is sized to the leaf it moves, not to the entrance it guards. A heavy steel leaf, a wide leaf and a leaf that catches the wind all ask more of the operator than a light narrow one, and an operator sized below the leaf will strain, slow and wear out early. Ask the supplier to size the operator to the leaf as built, with the infill, the cladding and the wind load the site sees, and to put that sizing in writing with the order.

The controls are the logic between the access control and the leaf. They read the signal from the reader, the intercom or the remote, check the safety devices, and only then tell the operator to move. They also set the speed, the pause before closing and the way the leaf behaves when it meets an obstruction. A control board that cannot be set for the site will leave the gate closing too soon for a slow vehicle or standing open long after the last vehicle has passed, and both faults wear the entrance down over time.

The leaf, the operator and the controls were tested as an assembly where a rating is claimed, and the evidence belongs to that assembly. A leaf from one supplier, an operator from another and controls from a third may each be good on their own, but no test report covers the three together. Order the gate as one assembly from one supplier, with one test report and one schedule, and keep that evidence with the gate so the next inspection can check what was fitted against what was tested.

Sliding operators: tracked and cantilever, and the ground that decides

A sliding leaf moves along the fence line, so it needs no arc of clear ground in front of the entrance. That makes it the usual choice where the driveway is short, where vehicles queue close to the gate, or where the entrance opens onto a public road. The trade is that the leaf needs room to one side: a run for the track on a tracked gate, or side space for the overhanging leaf on a cantilever gate. Measure the side space before ordering, because a leaf that cannot fully open is a gate that cannot do its job.

Tracked and cantilever are the two ways a sliding leaf is carried, and the ground decides between them. A tracked gate needs a level, firm run for the track with drainage, so the track stays clear and the wheels stay true. A cantilever gate suits sloping or soft ground and sites where a track would collect debris, because the leaf hangs from rollers above the ground and needs no track in the ground at all. The cantilever leaf needs more side space for the overhang, and the rollers and the counterbalance need room of their own. Our sliding vehicle gates page sets out both types and the ground each one needs.

A track that fills with leaves, grit or ice will stop a tracked gate, so the run needs clearing as part of the routine. A cantilever gate has no track to clear, but its rollers carry the whole leaf, so they need checking for wear and for the alignment that keeps the leaf running true. Either type will drag, judder or stop if the ground moves under it, so the foundations for the track or the roller posts are part of the gate, not an afterthought. Where the entrance must also stop a vehicle, the impact rating is a separate question from the operator, and our ISO 22343 vehicle security barriers guide explains how that rating is read.

Need this specified for your project?Free rating, written specification and budget range within one working day.
Get a free quote

Swing operators: hinges, posts and the leaf that opens in an arc

A swing leaf opens in an arc, so it needs clear ground on one side of the entrance for the whole sweep of the leaf. That suits sites with room to spare, a single leaf for a narrow entrance, or a pair of leaves for a wide one. The arc must be kept clear of parked vehicles, bins and planting, because anything in the arc is in the path of the leaf. A swing gate that cannot open fully is a gate that invites vehicles to wait half in the road while it moves.

The posts carry the leaf and the operator load together, so they need foundations that hold them square for the life of the gate. A post that leans will drag the leaf, strain the operator and wear the hinges, and the fault grows a little each year. The hinges carry the leaf, and the operator arm pushes against the same leaf, so the hinge, the post and the operator are one load path. Order them together, with the post foundations in the same specification as the leaf.

Wind catches a swing leaf more than a sliding leaf, because the leaf stands open across the wind while it moves. A solid infill leaf acts as a sail, and a gust can push the leaf against the operator or hold it back from closing. The operator must be sized for the leaf as built, with the infill the site chose, and the site should be honest about the wind it sees. A gate on an exposed hilltop and a gate in a sheltered yard are not the same order, even when the entrance width is the same.

Safety in use: EN 12453, EN 12445 and the devices that stop the leaf

EN 12453 covers safety in use of power operated doors, and EN 12445 covers the test methods for them. The two standards work together: one sets out what safe use looks like, and the other sets out how the door is tested to prove it. A gate supplier should be able to name the risk assessment the safety design follows, because the safety devices are chosen for the entrance, not pulled from a shelf. The assessment asks who walks past the leaf, where children and vehicles cross, and what happens when power fails, and the answers decide which devices are fitted and where they sit.

The devices most often fitted are photocells that watch the path of the leaf and safety edges that stop the leaf when they touch an obstruction. Automated gates carry safety devices that stop or reverse the leaf if a person is in its path, and the devices must cover the whole travel of the leaf, not just the middle of it. A device that watches the centre of the entrance and misses the ends leaves a gap where a person can stand unseen. Test the devices after fitting and at every inspection, because a safety device that has failed silently is worse than no device at all.

Pedestrian routes are kept separate from the leaf travel wherever possible. A person on foot should not have to cross the path of a moving vehicle leaf to reach the entrance, and a separate pedestrian gate or a marked route beside the vehicle gate is the usual answer. Where the vehicle gate is the only way in, the safety design must treat pedestrians as the main risk, not as an afterthought. Our turnstile, speed gate and portal guide compares the pedestrian side of entrance control, and our pedestrian speed gates page covers the fast lane for people on foot.

Access control: who opens the gate, and how the gate knows

Access control is the list of people and vehicles the gate must let through, and the way the gate checks each one. The common methods are fobs and cards for staff, keypads for visitors with a code, intercoms for deliveries, and readers that open the gate for a vehicle that is already known to the site. Each method suits a different entrance: a staff car park needs fobs that work in the rain, a delivery yard needs an intercom that reaches a person, and a site with regular contractors needs codes that can be changed when the work ends.

The gate should open for the right people and stay closed for everyone else, and the control system should keep a record of who opened it and when. A log that names the fob, the time and the direction of travel is the record the site needs when a vehicle is found where it should not be. Codes should be changed when staff leave, fobs should be cancelled when they are lost, and the list of people who can open the gate should be checked as often as the gate itself.

Access control and the safety system must work together, not against each other. A gate that closes on a timer can close on a vehicle that is still in the entrance, so the safety devices must hold the leaf open until the path is clear. Our vehicle barriers in the West Midlands page sets out access control barriers beside HVM rated barriers, and shows how the two are kept apart in one entrance.

Duty cycle: matching the operator to how often the gate moves

Duty cycle is the share of the day the operator is expected to work, and it is the figure that decides whether an operator lasts years or months. A gate on a quiet driveway moves a few times a day and rests between movements. A gate on a business park moves through the morning and evening peaks and rests in between. A gate on a logistics yard or a distribution depot moves all day, with vehicles arriving and leaving from the first shift to the last.

An operator worked harder than its rating will run hot, slow and wear out early, and the gate will start to stop halfway through its travel. Count how often the gate will move on the busiest day the site sees, not on an average day, and give that figure to the supplier before the operator is chosen. A gate that copes with the busiest day will cope with every other day too.

Traffic that grows will outgrow an operator that was sized for the site as it was, not as it will be. A business park that adds tenants, a depot that adds a shift, or a school that adds a bus route will all ask the gate to move more often than it did on the day it was ordered. If the site expects growth, say so when the operator is specified, and choose an operator with room for the traffic the site will see in the years ahead.

Power, ground and weather: the site work that comes before the gate

An automated gate needs a dedicated electrical supply, planned before the civil work begins. The exact requirement depends on the motor and the site access control, so the supply should be agreed with the gate design early, with ducting laid before the ground is finished. Plan the power, the ducting and the drainage at the same time as the gate, not after it.

The ground under the gate decides how long the gate stays true. The track, the roller posts and the swing posts all need foundations that hold them square, and the foundations need a survey of the ground and the services under it. Utilities, drains and cables run under most entrances, and a foundation dug without a survey will find them the hard way.

Weather works on a gate every day, and the operator, the leaf and the safety devices must be built for the site they stand on. Rain fills a track, ice stops a wheel, and wind pushes a leaf. A gate on an exposed site needs protection the sheltered one does not, and the safety devices need housings that keep them working in rain and frost. Our hostile vehicle mitigation page covers the wider entrance line the gate stands in.

Writing the order: one specification for operator, leaf and safety

Ordering an automated gate is a specification exercise, not a shopping exercise. The order should name the leaf type and width, the operator type and its duty rating, the safety devices and the risk assessment they follow, the access control method, the manual release and the test evidence. Our how to specify security doors guide covers the same discipline for rated doors, and our HVM standards guide explains PAS 68, IWA 14-1 and ISO 22343-1:2023 for entrances that must also stop a vehicle.

Finally, order the evidence with the gate. The test report, the risk assessment, the duty rating and the safety device schedule should arrive with the gate, and the handover pack should name the inspection routine the site will follow. A site that files the evidence on the day the gate arrives has a record it can use for the whole life of the entrance. For the impact side of the entrance, our vehicle impact ratings page sets out how PAS 68, IWA 14-1 and ISO 22343-1:2023 ratings are read.

Question Sliding Swing
Ground needed Level firm run with drainage for tracked, or firm roller posts for cantilever Level ground through the whole arc of the leaf
Space beside the entrance Room to one side for the track run or the overhanging leaf Clear ground on one side for the arc, kept free of vehicles and planting
Wind Leaf runs low along the fence line, less exposed while moving Solid leaf acts as a sail while open, operator must be sized for it
Leaf weight Rollers carry the leaf, wear shows as drag or judder Hinges and posts carry the leaf, wear shows as sag or drag
Where it suits Short driveways, queues close to the gate, entrances onto a public road Sites with room to spare, narrow entrances, pairs of leaves for wide openings

A gate that cannot be opened by hand when power fails is a gate that traps vehicles and people at the entrance.

Can a standard electric gate stop a vehicle?

No. A standard electric gate is built for access control, not impact. Its leaf, posts and motor are not designed to take the load of a moving vehicle, and its shallow foundations will not hold it on impact. Only a crash tested gate with its tested posts and foundations can stop a determined driver. The rating states four things: the vehicle type and mass, the impact speed, the impact angle and the penetration distance. Test vehicles run from a 1,500 kg car to a 30,000 kg truck, and test speeds are 48, 64 and 80 km per hour. Our ISO 22343 vehicle security barriers guide explains how to read the rating.

What happens to an automated gate when the power fails?

Every automated gate has a manual release so the leaf can be worked by hand. Agree the procedure with the security team in advance, so the entrance stays controlled during manual operation and the gate is put back into automatic use properly when power returns. A gate left in manual mode after a power cut is a gate that is not controlled at all.

Which is better, a sliding gate or a swing gate?

Neither is better in itself. The ground and the space decide. A sliding gate suits a short driveway or an entrance onto a public road, with a tracked run where the ground is level and firm, or a cantilever leaf where the ground slopes or is soft. A swing gate suits a site with room for the arc of the leaf. Measure the ground and the side space before ordering, because the site, not the catalogue, makes the choice.

What safety devices does an automated gate need?

The safety design follows a risk assessment under EN 12453, and the devices are chosen for the entrance. Automated gates carry safety devices that stop or reverse the leaf if a person is in its path, most often photocells that watch the path of the leaf and safety edges that stop the leaf when they touch an obstruction. Pedestrian routes are kept separate from the leaf travel wherever possible, and the devices are tested after fitting and at every inspection.

Can one gate carry both LPS 1175 and PAS 68 ratings?

Yes. Dual rated assemblies are tested for forced entry and for vehicle impact, and the evidence must name both ratings. Ask for both test reports before accepting the gate as dual rated. The forced entry rating follows LPS 1175, with tool sets from A1 to H20, and the impact rating follows PAS 68, IWA 14-1 or ISO 22343-1:2023, which supersedes PAS 68:2013. Secured by Design is a scheme, not a rating, and it does not replace either test.

What a gate operator rating does not prove

A rating on a gate operator proves one thing: the tested assembly held its rating in the test. It proves nothing else. Treat the certificate as a narrow statement, and ask what it leaves out before the order is placed.

It does not prove the operator suits the leaf. A heavy steel leaf, a wide leaf and a leaf that catches the wind all ask more of the operator than a light narrow one, and an operator sized below the leaf will strain, slow and wear out early. Ask the supplier to size the operator to the leaf as built, with the infill, the cladding and the wind load the site sees.

It does not prove the gate is safe. EN 12453 covers safety in use of power operated doors, and EN 12445 covers the test methods for them. The safety design follows a risk assessment of the entrance: who walks past the leaf, where children and vehicles cross, and what happens when power fails. Photocells watch the path of the leaf and safety edges stop the leaf when they touch an obstruction.

It does not prove the gate will keep moving. Duty cycle is the share of the day the operator is expected to work, and an operator worked harder than its rating will run hot, slow and wear out early. Count how often the gate will move on the busiest day the site sees, and give that figure to the supplier before the operator is chosen.

It does not prove the gate stops a vehicle. A standard electric gate is built for access control, not impact. Only a crash tested gate with its tested posts and foundations can stop a determined driver. The impact rating follows PAS 68, IWA 14-1 or ISO 22343-1:2023, and test vehicles run from a 1,500 kg car to a 30,000 kg truck, at test speeds of 48, 64 and 80 km per hour.

Mistakes that leave a gate entrance open

Most gate entrances fail in small ways. Each mistake below has the same result: an entrance that looks controlled and lets vehicles through unchecked.

Mistake Why it fails What to do instead
Operator sized below the leaf The gate strains, slows and wears out early. Size the operator to the leaf as built, with the wind load.
Safety devices only in the middle A person can stand unseen at the ends of the travel. Cover the whole travel of the leaf.
No manual release agreed A power cut traps vehicles and people at the entrance. Agree the manual release procedure with the security team.
Gate left in manual mode A gate in manual mode is a gate that is not controlled at all. Put the gate back into automatic use when power returns.
Access control with no log Nobody can say who opened the gate or when. Log every opening and check the log.

Keep the evidence with the gate. The test report, the risk assessment, the duty rating and the safety device schedule should arrive with the gate. For the impact side of the entrance, see our ISO 22343 vehicle security barriers guide, and for the factors behind a gate quote, see our security gates cost factors guide.

Specifying an automated gate?Send the entrance width, the ground conditions and the daily traffic for a tested gate quotation.
Get a free quote

Related

More in guides for specifiers

10 mistakes when specifying certified security doors 10 steps to specify an LPS 1175 door Acceptance and Snagging of a Security Door or Barrier Job Access Control Doors Acoustic Doors: Ratings and Specification After a Forced Entry Attempt: Checking a Security Door Airport Security Doors Anti-Ligature Doors for Mental Health Wards Anti-Ram Bollards Anti-ram gates and barriers: protecting vehicle entrances Arcade Security Doors Explained Automatic Doors Automatic Gates Cost Factors Automatic Vehicle Barriers Ballistic Panels Bank Security Doors Bingo Hall Security Doors Explained Blast doors: glazed vs solid and how they are rated Blast protection window film: what it does and what it cannot do Blast resistant windows: what drives the cost and how to specify them Bollard Cost Factors Explained Bollard regulations in the UK: spacing, height and depth Bookmaker Security Doors Explained Builders Merchant Security Doors Bullet Resistant Glass Cost Factors Bullet resistant glass ratings explained: BR1 to BR7 and SG classes Bullet resistant vs bulletproof glass: what the difference means Buying Security Doors and HVM Through Public Frameworks Car Park Security Doors Explained Car Showroom Security Doors Casino Security Doors Explained CDM 2015 Duties When Security Doors, Shutters or HVM Are Installed Cinema Security Doors Cleanroom Doors Cold Store Doors College Security Doors Commissioning, Handover and the O&M Manual for Security Doors and HVM Communal entrance doors for flats: Secured by Design and what to specify Community Centre Security Doors Control Room Doors Court Security Doors Crash Rated Fences and HVM Fencing Explained Data centre physical security: doors, glazing, HVM and shielding by zone Dental Practice Security Doors Depot Security Doors Explained Door Entry Systems Due Diligence When Selecting Vehicle Security Barriers Emergency Exit Doors EMP Shielding Cost Factors Explained Exhibition Centre Fire Door Rules Exhibition Centre Security Doors Factory Security Doors Faraday cage vs RF shielded room: what a business needs FB4 vs FB6 vs FB7: how to choose a ballistic rating Fire and security doors: how dual certification works Fire Compartmentation Fire Curtains Fire Door Certification Fire Door Closers Explained Fire Door Cost Factors Fire Door Duties of the Accountable Person Fire Door Gaps Fire Door Hardware Explained Fire door inspection checklist for steel and timber doors Fire Door Maintenance Fire Door Regulations Care Homes Fire Door Regulations for A and E Departments Fire Door Regulations for Airports Explained Fire Door Regulations for Bowls Clubs Fire door regulations for commercial buildings in the UK Fire Door Regulations for Dialysis Centres Fire Door Regulations for Hockey Clubs Fire Door Regulations for Hospitals Explained Fire Door Regulations for Offices Explained Fire Door Regulations for Operating Theatres Fire Door Regulations for Retail Explained Fire Door Regulations for Schools Explained Fire Door Regulations for Snooker Clubs Fire Door Regulations for Stadiums Fire Door Regulations for Student Accommodation Fire Door Regulations for Warehouses Fire Door Regulations Leisure Centres Fire Door Regulations Restaurants Fire Door Remediation Programme for Housing Providers Fire Door Rules for Badminton Clubs Fire Door Rules for Bingo Halls Fire Door Rules for Bookmakers Fire Door Rules for Bowling Alleys Fire Door Rules for Car Parks Fire Door Rules for Car Showrooms Fire Door Rules for Cinemas Fire Door Rules for Climbing Centres Fire Door Rules for Colleges Fire Door Rules for Community Centres Fire Door Rules for Cricket Clubs Fire Door Rules for Dental Practices Fire Door Rules for Depots Explained Fire Door Rules for Golf Clubs Fire Door Rules for GP Surgeries Fire Door Rules for Gyms Explained Fire Door Rules for Ice Rinks Fire Door Rules for Maternity Units Fire Door Rules for Mental Health Units Fire Door Rules for Museums Fire Door Rules for Oncology Units Fire Door Rules for Opticians Fire Door Rules for Pawnbrokers Fire Door Rules for Petrol Stations Fire Door Rules for Pharmacies Fire Door Rules for Ports Fire Door Rules for Post Offices Fire Door Rules for Prisons Fire Door Rules for Rehabilitation Centres Fire Door Rules for Self Storage Fire Door Rules for Shopping Centres Fire Door Rules for Squash Clubs Fire Door Rules for Supermarkets Fire Door Rules for Swimming Pools Fire Door Rules for Tennis Clubs Fire Door Rules for Theatres Fire Door Rules for UK Arcades Fire Door Rules for UK Casinos Fire Door Rules for UK Hospices Fire Door Rules for Walk-in Centres Fire Door Signage Fire Door Vision Panels Fire Doors and Gateway 2 in Higher-Risk Buildings Fire Rated Glass Cost Explained Fire Rated Sliding Doors Explained Fire Rated Windows Cost Factors Fire Rated Windows Explained Fire Safety Enforcement Notices and Fire Doors: What the Responsible Person Must Do Flat Entrance Doors: PAS 24 and Fire Rated Forced Entry vs Ballistic vs Blast: Which Rating a Site Needs Garage Security Doors Explained Golden Thread Records for Fire Doors GP Surgery Security Doors Explained Gym Security Doors Explained High Speed Doors HMO Fire Doors Hospice Security Doors Explained Hospital Security Doors: Wards, A&E, Plant Hospital Security Gates Hotel Fire Doors Hotel Security Doors How to choose HVM bollards: fixed, shallow mount, removable and automatic How to keep an LPS 1175 door rating valid after installation How to Specify Fire Doors in a Housing Tender How to specify security doors: a checklist for architects How to Verify a Secured by Design Listing How to Verify an LPS 1175 Certificate on Red Book Live How to Write an Operational Requirement for Physical Security HVM planters and street furniture: protection that blends in In-Service Care of Vehicle Security Barriers Installation Handover: LPS 1175 Doors and PAS 68 Barriers Intumescent Seals ISO 16933 explained: EXV and SB classes and hazard ratings ISO 22343 vehicle security barriers explained Keeping a Dual-Certified Fire and Security Door Valid in Service Laboratory Security Doors Layered Security for a Site: Deter, Detect, Delay, Mitigate, Respond Lead Times and Programme Risks for LPS 1175 Doors Leisure Centre Security Doors Library Security Doors Listed Building Fire Doors Loading Bay Doors Explained Lockdown and Access Control Hardware on an LPS 1175 Door LPS 1175 Gates and Grilles Explained LPS 1175 Issue 8 explained: from SR1 to SR8 to A1 to H20 LPS 1175 Roller Shutters LPS 1175 vs ASTM F2781 and Other US Ratings Explained LPS 1175 vs EN 1627: how UK and European burglar resistance ratings compare LPS 1175 vs PAS 24: which security standard does your door need? LPS 1175 Windows and Walling Explained Martyn’s Law and Places of Worship: What a Buyer Checks for Doors and Entry Control Martyn’s Law Enhanced Tier: Physical Measures and the Specifier Brief Martyn’s Law Standard Tier: Procedures, Doors and Shutters Martyn’s Law Timeline and the SIA Regulator Martyn’s Law: what premises must do and which physical measures to consider Master Key Systems MRI and RF shielded rooms: how they work and what to specify Museum Security Doors NPSA Catalogue of Security Equipment (CSE) Explained NPSA Forced Entry and Blast Guidance for Government Sites NPSA Guidance on Lockdown and Marauding Attack: What It Asks of Doors and Entrances Office Security Doors Optician Security Doors Explained Panic Hardware PAS 24 requirements for doors and windows explained PAS 68 Bollard Foundations Explained PAS 68 bollards: ratings, spacing and cost factors PAS 68 vs IWA 14 vs ISO 22343: hostile vehicle mitigation standards explained Pawnbroker Security Doors Explained Pedestrian Gates Petrol Station Security Doors Pharmacy Security Doors Planning Permission for Security Shutters, Gates and Bollards on Commercial Premises Plant room doors: fire, security and ventilation requirements Plant Room Fire Doors Port Security Doors Post Office Security Doors Explained Powder coating vs galvanising vs paint for steel Preliminary Market Engagement for Security Doors and HVM Prison Security Doors Programming a Security Door and Barrier Package on a Live Site Public-Sector Tender Response Checklist for Security Door and HVM Supply Reading a PAS 24 and SBD Door Test Report Regulation 38 Fire Safety Information at Handover for Fire-Rated Security Doorsets Replacing Security Doors in an Occupied Building Restaurant Security Doors Retail Security Doors Revolving Doors RF shielding standards and how shielded rooms are tested Rising Bollard Cost Factors Road Blocker Cost Factors Explained Road Blockers Explained Roller Shutter Cost Factors: What Drives the Price Roller shutter regulations in the UK: safety and maintenance Safe room and panic room doors: specification basics Safety Duties for Powered Doors, Gates and Barriers on Commercial Sites School Security Doors Sectional Doors Secured by Design explained: is it mandatory for doors? Secured by Design vs NPSA vs LPCB: Which One You Need Security Door Locks Security Door Maintenance Checklist Security Doors and Access for Everyone: What Approved Document M Asks Security Doors for A and E Departments Security Doors for Badminton Clubs Security Doors for Bowling Alleys Security Doors for Bowls Clubs Security Doors for Climbing Centres Security Doors for Cricket Clubs Security Doors for Dialysis Centres Security Doors for Golf Clubs Security Doors for Hockey Clubs Security Doors for Ice Rinks Security Doors for Maternity Units Security Doors for Mental Health Units Security Doors for Oncology Units Security Doors for Operating Theatres Security Doors for Rehabilitation Centres Security Doors for Snooker Clubs Security Doors for Squash Clubs Security Doors for Swimming Pools Security Doors for Tennis Clubs Security Doors for Walk-in Centres Security Doors West Midlands Explained Security Fencing Security Gates Cost Factors Explained Security shutters vs high performance roller doors Security shutters vs retractable grilles: which suits retail and commercial openings? Security Turnstiles Explained Security Window Film Security Windows for Schools Explained Self Storage Security Doors Server Room Doors Explained Shopping Centre Security Doors Smoke Control Doors Explained Smoke Curtains Specification Mistakes When Mixing LPS 1175, PAS 24 and SBD in One Tender SR2 vs SR3 vs SR4 security doors: choosing the right LPS 1175 level Stadium Security Doors Steel Door Frames Steel vs aluminium security doors: strength, ratings and looks Steel vs timber fire doors: which suits your building? Student Accommodation Security Doors Substation doors: security, ventilation and specification Supermarket Security Doors Telescopic Bollards Tender Evaluation Criteria and Scoring for Security Doors and HVM The Scope of a Maintenance Contract for Security Doors and Barriers Theatre Security Doors Thermal and Weather Performance of External Security Doorsets Thermally broken steel security doors: U-values and certification Traffic Calming as Hostile Vehicle Mitigation Transport hub security requirements Turnstile Cost Factors Explained Turnstile vs speed gate vs security portal: choosing entrance control Types of security doors for commercial buildings University Security Doors Explained Vehicle Dynamics Assessment: What It Tells the Buyer Before a Barrier Is Specified Warehouse Security Doors Explained Warehouse Security Gates Warranty, Defects Liability and Guarantees for Security Doors and Barriers What affects the cost of a bullet resistant door What affects the cost of a high-security door in the UK Window Security Bars View all →

Products

One supplier for the whole building envelope

Ready to specify your project?

Free assessment, written specification and test evidence. Reply within one working day.