The Scope of a Maintenance Contract for Security Doors and Barriers
A maintenance contract names the visits, the parts and the record. This guide shows what a buyer asks for, and what the law already asks for.
- ✓Third-party test evidence with every product
- ✓Written specification you can issue to tender
- ✓Supplied and installed across the UK
Get a free project quote
Rating, written specification and budget range within one working day.
Confidential. No cost, no obligation.
Third-party tested
Evidence with every quote
UK manufactured
Made to your sizes
One accountable team
Specify, supply, install
Confidential handling
Details never shared
A maintenance contract names the visits, the parts and the record. The buyer writes the duties the law already sets, and the contract adds the dates, the response and the proof.
- Routine checksQuarterly communal, annual flat entrance
- RepairsCompetent contractor, soon as practicable
- ServicingRegular, before faults turn serious
- RecordWritten, with the certificate schedule
What the law already asks for
The Regulatory Reform (Fire Safety) Order 2005 puts a responsible person in charge of every business premises, and that person must put in place, and maintain, appropriate fire safety measures. The fire risk assessment must be carried out and reviewed on a regular basis, and the findings must be recorded in writing, with an emergency plan and training beside them. A contract that names no visits and no record does not meet that duty, because the duty is to maintain, not only to fit.
The Fire Safety (England) Regulations 2022 add the routine for fire doors. Communal doors are checked every three months, and flat entrance doors once a year where the top storey sits above 11 metres, and the checks are simple and visual, with no tools. Repairs go to a competent contractor, and the work happens as soon as reasonably practicable, with a record of the steps taken, including any access that was refused. The gov.uk page on fire safety in the workplace sets out the five duties of the responsible person in full.
The visits: what each one covers
Each visit covers the doors, the barriers and the access control, and the contract names the interval for each one. The door round checks the closer, the gap, the seals and the hinges, and the security door maintenance checklist spells out the full round for a rated leaf. The barrier round checks the line, the gaps and the controls, and the in-service care guide for vehicle barriers sets out the round for a barrier that must still stop a vehicle.
The access control round checks the readers, the releases and the override, and the programming guide for a door and barrier package sets out how the system is set and tested. The fire door round checks the leaf, the closer and the seals against the fire door rules, and the fire door maintenance guide walks through the checks that keep the fire rating valid. A visit that only looks at the doors and skips the barriers leaves half the site untested.
The parts: what is covered and what is not
The contract must say which parts are covered and which are not. Wear parts, such as seals and closers that wear with use, belong in the contract. Damage by misuse does not, and neither does a change the buyer asks for, such as a new lock or a new reader. A part that was never tested with the doorset is a guess, and the contract should say that the parts fitted must match the certificate schedule.
A change to the tested build needs fresh evidence, and the keeping the rating valid guide sets out which changes need it and which do not. A closer of a different model, a hinge of a different grade, a lock with a different cylinder: each one changes the set that was tested, and the contract should name who checks the schedule before the swap. The test report guide shows what the evidence behind a door must prove, so the buyer knows what the schedule must name.
The response: what happens when a door fails
A fault found on the round is given a date, and the contract names how fast each class of fault is attended. A closer that leaves the leaf open, a seal that has come away, a lock that will not hold: each one leaves the door unable to do its job, and the contract should say whether the door is closed the same day or left in use with a note. The buyer should not leave that decision to the day, because the day is when the pressure is highest.
A fault found between visits gets the same treatment. The contract should name who the buyer calls, what the contractor asks for on the call, and what happens if the part is not on the van. The fire door inspection checklist holds the checks that find the faults, and the acceptance and snagging guide covers the handover test that sets the baseline the contract is measured against.
The record: what the contractor leaves behind
Every visit leaves a record: the date, the person who checked, the door or the barrier, the fault found, and the fix made. The record is the proof that the duty to maintain was met, and it is the brief for the next visit, because the faults that repeat are the faults that need a different fix. The Fire Safety (England) Regulations ask for the steps taken to be recorded, including any access that was refused, and the buyer should keep that record with the certificate schedule.
The record also feeds the golden thread where one is kept, and the golden thread records guide sets out what the thread holds for a fire door and who keeps it. A record kept only on the contractor’s system is a record the buyer does not hold, and the contract should say that a copy comes to the buyer after every visit. The installation handover guide covers the documents that pass from the installer to the buyer at the start, and the maintenance record continues that file.
The exclusions: what the contract does not cover
The exclusions must be written, not assumed. Damage by misuse, work outside the schedule, and changes the buyer makes without telling the contractor: each one sits outside the contract, and the buyer should know that before the first visit. A change made quietly can void a certification, and the keeping the rating valid guide lists the changes that need fresh evidence before they are made.
The exclusions also cover the parts the contract does not hold. A barrier that has been hit by a vehicle, a leaf that has been forced, a reader that has been flooded: each one needs a repair outside the routine, and the contract should say how that repair is priced and who approves it. The places of worship guide shows how the procedures shape the doors a contract must cover, and the lockdown hardware guide shows the three duties the hardware must pass, which the contract must test.
Signing the contract: the checks before the signature
Before the signature, the buyer checks four things. The contractor is competent, with evidence the buyer has seen. The certificate schedule is in hand, so the parts and the changes can be checked against it. The first visit is set as a baseline, so the contract starts from the state of the doors as they are, not as they were sold. And the review date is set, so the contract is read again each year, not left to run.
The contract should name the visits, the parts, the response and the record, and the buyer should keep a copy with the fire risk assessment, because the two belong together. NPSA puts the reason plainly for barriers: a scheme must be kept well maintained, because failure to do so will lead to products breaking down, and regular servicing flags issues before they turn into serious problems. The same reason holds for a door. The gov.uk fire door guidance for the Fire Safety (England) Regulations 2022 sets out the routine checks and the repairs in full.
| Item | How often the contract names it | What the visit leaves behind |
|---|---|---|
| Security doors | Each round, with the closer, gap, seals and hinges | Date, checker, door, fault, fix |
| Vehicle barriers | Each round, with the line, gaps and controls | Date, checker, barrier, fault, fix |
| Access control | Each round, with readers, releases and override | Date, checker, system, fault, fix |
| The record | After every visit, with the certificate schedule | A copy to the buyer, filed with the assessment |
A contract is a list of duties with dates. If a duty has no date, it has no owner.
What does the law ask for on maintenance?
The responsible person must put the fire safety measures in place and keep them working, and the fire risk assessment must be reviewed on a regular basis. Repairs are done by a competent contractor, and they happen without delay once the fault is found, with the steps taken recorded.
What should each visit cover?
Each item gets its own round: doors, barriers and access control. The door round looks at the closer and the seals, the gap and the hinges. The barrier round looks at the line and the controls. The access round looks at the readers, the releases and the override.
Are parts included in the contract?
Wear parts belong in the contract: the seals and the closers that wear with use. Damage by misuse sits outside it, and so does a change the buyer asks for. The parts fitted must be the ones the certificate schedule names.
What happens when a door fails between visits?
The contract should name the number to call and the questions the contractor will ask, and what happens when the part is not on the van. A fault found between visits is treated the same as a fault found on the round, with a date for the fix.
What record should the contractor leave?
The date, the checker, the door or barrier, the fault, and the fix. A copy reaches the buyer after every visit, and the buyer keeps it with the certificate schedule and the fire risk assessment.
Contact us for a free quote
Related
More in guides for specifiers