Layered Security for a Site: Deter, Detect, Delay, Mitigate, Respond

Five principles, five zones: how deter, detect, delay, mitigate and respond combine doors, glazing, barriers and access control into one specification.

  • ✓Third-party test evidence with every product
  • ✓Written specification you can issue to tender
  • ✓Supplied and installed across the UK
Prefer to talk?+44 7352 267239

Get a free project quote

Rating, written specification and budget range within one working day.

ArxBridge Quote Form

Confidential. No cost, no obligation.

Third-party tested

Evidence with every quote

UK manufactured

Made to your sizes

One accountable team

Specify, supply, install

Confidential handling

Details never shared

Layered security means an attacker meets a new obstacle at every step, from the road outside to the room that holds the asset. NPSA names five principles for those layers: deter, detect, delay, mitigate and respond.

  • Five principlesDeter, Detect, Delay, Mitigate, Response
  • 3DsDeter, Detect, Delay for forcible attack
  • BADBarriers, Access, Detect for surreptitious attack
  • One requirementThe layers in a single order

Five principles, one specification

NPSA’s protective security method rests on three core principles, deter, detect and delay, with mitigate and response beside them. The five together shape every layer of a site, from beyond the perimeter to the asset itself. The method is risk-based: the layers follow the threats the site faces, and the measures fit the assets that matter.

Two philosophies sit behind the five principles. Against a forcible attack, such as theft or terrorism, the 3Ds apply: deter the attacker from choosing the site, detect the attack at the earliest point, and delay the attacker long enough for a response before any loss. Against a surreptitious attack, such as espionage, the BAD philosophy applies: put barriers close to the asset, control access, and detect the attack, because the aim there is detection, not delay.

Both models use a layered approach that joins physical, personnel and cyber security. A single product, however strong, is not a layer. The layers work together only when one written requirement names them all, and the Operational Requirement guide shows how that requirement is built from the threat, the approaches and the locations.

Outside the perimeter: deter first

Deterrence starts before the boundary. A strong security appearance, clear messaging and visible measures can put an attacker off choosing the site at all, and the NPSA guidance on hostile reconnaissance notes that deterrent measures can be cheap and easy to deploy, often with colleagues in communications.

Within a building, deterrence also means keeping the asset’s profile low: limit what the corporate website and the signage say about the function of the building and the location of sensitive assets, and describe the security culture without disclosing details useful for attack planning. An attacker who learns nothing about what sits where, and nothing about which parts matter, has a harder plan to write.

Signage plays its part inside the site too. Signs that warn people to keep out, and directions that steer visitors away from critical areas, add deterrence without giving away how the systems work. Channel an adversary towards non-critical parts of the site, where a response force can intervene safely, rather than leaving the route to the asset open.

Need this specified for your project?Free rating, written specification and budget range within one working day.
Get a free quote

At the perimeter: detect and delay

The perimeter is where detection should start and delay should bite. Free-standing perimeter intrusion detection, supported by CCTV and light, spots an intruder at the boundary, and the control room should be set up so detection and the situational awareness it gives are both as high as they can be.

Delay at the perimeter comes from the barrier line. A vehicle security barrier holds the line while access control decides which vehicles may pass. The hostile vehicle mitigation guide sets out the barrier types, and fixed, shallow-mount, removable and automatic units are compared in the bollard choice guide, for a site where people must pass through.

Before any barrier is ordered, the evidence should be checked. The questions that separate a tested product from a claim are listed in the vehicle barrier due diligence guide, and the study that measures the approach speed is the subject of the Vehicle Dynamics Assessment guide.

Inside the site: slow the approach

Within the site, delay means confusion and obstruction. NPSA names natural obstacles, such as ditches, rises in ground level and planting, and man-made ones, such as demarcation fences, non-critical buildings and cable tidies, all used to slow an attack force. The aim is to maximise the area between the perimeter and the asset.

Stand-off belongs here too. Maximise the distance to critical assets, and put car parking outside the perimeter or at a significant distance from it, enforced where needed with vehicle security barriers. The traffic calming guide shows how the road is shaped so a vehicle arrives at the barrier at a speed the barrier can hold.

Detection inside the site means tracking, not only spotting. The control room should be able to follow an attack force within the perimeter, so the response force can be directed to the right place in time. A measure that detects without tracking leaves the response guessing.

At the building: doors, glazing and access control

The building is the last layer before the asset, and its access points are the portals, the walls, the doors, the windows and the roofs. Delay here comes from the building structure and the protective furniture beside it: strengthen the fabric, and create multiple approved security layers, walls, portals, floors and locks, between the fabric and the asset, using different measures in the path.

Doors carry the delay at each opening, and the rating must match the threat at that opening. Fire and security ratings on one doorset are the subject of the dual certification guide. The dual-certified door guide covers keeping both ratings valid once the door is in service.

Glazing needs the same care as the leaf beside it. Where glazing forms part of the building fabric, the material must be chosen to minimise the hazards it poses during an attack. Access control zones the building, so the most sensitive areas sit behind the fewest routes, and the system can lock down access points from the control room. The access control doors guide covers the hardware that makes zoning work. The NPSA guidance on protecting a building sets out the five principles for the building layer in full.

Mitigate and respond: the two principles buyers forget

Mitigation limits what an attack achieves when it reaches the asset. At the building, that means protection measures that minimise the impact of an attack while considering whether the measures themselves add to its effect, and access points that can be rapidly secured. Within the site, it means stand-off, and limiting access to critical equipment.

Response is the principle that turns detection into action. The buyer must determine what response each threat needs, tie the measures into response plans, and exercise those plans with the people who will carry them out. A response plan that has never been exercised is a hope, not a plan.

At the building, response includes clear reception procedures for alerting the control room, CCTV that tracks an intruder and directs officers, and a decision on whether to hold people inside or move them out. The response force must also be able to reach the incident, even where the attack has affected the access points. The NPSA guidance on protecting a site sets out the five principles for the area inside the perimeter.

Zone Principle What the buyer specifies
Beyond the perimeter Deter Visible measures, signage, low profile
At the perimeter Detect, Delay Intrusion detection, CCTV, barriers
Within the site Delay, Mitigate Stand-off, obstacles, parking outside
At the building Delay, Mitigate Rated doors, glazing, access zoning
At the asset Respond Response plans, exercised, tracked

Writing the layers into one order

One order should name every layer, the principle each layer serves, and the measure that delivers it. A buyer who orders doors without the barriers, or barriers without the detection, has bought parts, not a specification. The order should also name the evidence for each measure: the test report for a door, the rating for a barrier, and the record that proves the detection works.

Check each measure against the three Ds before the order goes out: does it deter, does it detect, does it delay, and do the three together cover the attack the site faces? NPSA puts it plainly: considering the impact a measure has on deter, detect and delay matters, so the measures are complementary and all three have been covered.

What the buyer learns before the tender shapes the layers too. The preliminary market engagement guide shows how a public buyer talks to the market before the tender, and the test report guide explains how to read the evidence behind a door.

A layer is not a product. It is a principle, a place and a measure, written into one requirement so every step of the attack meets a fresh obstacle.

What are the five NPSA principles?

Deter, Detect, Delay, Mitigate and Response. The three Ds are the core, with mitigate and response beside them at every zone of the site.

What is the difference between the 3Ds and BAD?

The 3Ds counter a forcible attack. BAD counters a surreptitious attack such as espionage, with layers built close to the asset.

Where does deterrence start?

Before the boundary. Visible measures, clear messaging, signs that steer people away from critical areas, and a low profile for the asset all deter an attacker.

How does delay work inside the site?

By confusion and obstruction: natural obstacles such as ditches and planting, man-made ones such as fences and non-critical buildings, and stand-off that maximises the distance to the asset.

What should one order name for every layer?

The zone, the principle the layer serves, the measure that delivers it, and the proof behind it: a report for a door, a rating for a barrier, and a record for the detection.

Specifying layered security for a site?Send the site, the threats named, and the asset the layers must protect.
Contact us for a free quote

Related

More in guides for specifiers

10 mistakes when specifying certified security doors 10 steps to specify an LPS 1175 door Acceptance and Snagging of a Security Door or Barrier Job Access Control Doors Acoustic Doors: Ratings and Specification After a Forced Entry Attempt: Checking a Security Door Airport Security Doors Anti-Ligature Doors for Mental Health Wards Anti-Ram Bollards Anti-ram gates and barriers: protecting vehicle entrances Arcade Security Doors Explained Automatic Doors Automatic Gates Cost Factors Automatic Vehicle Barriers Ballistic Panels Bank Security Doors Bingo Hall Security Doors Explained Blast doors: glazed vs solid and how they are rated Blast protection window film: what it does and what it cannot do Blast resistant windows: what drives the cost and how to specify them Bollard Cost Factors Explained Bollard regulations in the UK: spacing, height and depth Bookmaker Security Doors Explained Builders Merchant Security Doors Bullet Resistant Glass Cost Factors Bullet resistant glass ratings explained: BR1 to BR7 and SG classes Bullet resistant vs bulletproof glass: what the difference means Buying Security Doors and HVM Through Public Frameworks Car Park Security Doors Explained Car Showroom Security Doors Casino Security Doors Explained CDM 2015 Duties When Security Doors, Shutters or HVM Are Installed Cinema Security Doors Cleanroom Doors Cold Store Doors College Security Doors Commissioning, Handover and the O&M Manual for Security Doors and HVM Communal entrance doors for flats: Secured by Design and what to specify Community Centre Security Doors Control Room Doors Court Security Doors Crash Rated Fences and HVM Fencing Explained Data centre physical security: doors, glazing, HVM and shielding by zone Dental Practice Security Doors Depot Security Doors Explained Door Entry Systems Due Diligence When Selecting Vehicle Security Barriers Emergency Exit Doors EMP Shielding Cost Factors Explained Exhibition Centre Fire Door Rules Exhibition Centre Security Doors Factory Security Doors Faraday cage vs RF shielded room: what a business needs FB4 vs FB6 vs FB7: how to choose a ballistic rating Fire and security doors: how dual certification works Fire Compartmentation Fire Curtains Fire Door Certification Fire Door Closers Explained Fire Door Cost Factors Fire Door Duties of the Accountable Person Fire Door Gaps Fire Door Hardware Explained Fire door inspection checklist for steel and timber doors Fire Door Maintenance Fire Door Regulations Care Homes Fire Door Regulations for A and E Departments Fire Door Regulations for Airports Explained Fire Door Regulations for Bowls Clubs Fire door regulations for commercial buildings in the UK Fire Door Regulations for Dialysis Centres Fire Door Regulations for Hockey Clubs Fire Door Regulations for Hospitals Explained Fire Door Regulations for Offices Explained Fire Door Regulations for Operating Theatres Fire Door Regulations for Retail Explained Fire Door Regulations for Schools Explained Fire Door Regulations for Snooker Clubs Fire Door Regulations for Stadiums Fire Door Regulations for Student Accommodation Fire Door Regulations for Warehouses Fire Door Regulations Leisure Centres Fire Door Regulations Restaurants Fire Door Remediation Programme for Housing Providers Fire Door Rules for Badminton Clubs Fire Door Rules for Bingo Halls Fire Door Rules for Bookmakers Fire Door Rules for Bowling Alleys Fire Door Rules for Car Parks Fire Door Rules for Car Showrooms Fire Door Rules for Cinemas Fire Door Rules for Climbing Centres Fire Door Rules for Colleges Fire Door Rules for Community Centres Fire Door Rules for Cricket Clubs Fire Door Rules for Dental Practices Fire Door Rules for Depots Explained Fire Door Rules for Golf Clubs Fire Door Rules for GP Surgeries Fire Door Rules for Gyms Explained Fire Door Rules for Ice Rinks Fire Door Rules for Maternity Units Fire Door Rules for Mental Health Units Fire Door Rules for Museums Fire Door Rules for Oncology Units Fire Door Rules for Opticians Fire Door Rules for Pawnbrokers Fire Door Rules for Petrol Stations Fire Door Rules for Pharmacies Fire Door Rules for Ports Fire Door Rules for Post Offices Fire Door Rules for Prisons Fire Door Rules for Rehabilitation Centres Fire Door Rules for Self Storage Fire Door Rules for Shopping Centres Fire Door Rules for Squash Clubs Fire Door Rules for Supermarkets Fire Door Rules for Swimming Pools Fire Door Rules for Tennis Clubs Fire Door Rules for Theatres Fire Door Rules for UK Arcades Fire Door Rules for UK Casinos Fire Door Rules for UK Hospices Fire Door Rules for Walk-in Centres Fire Door Signage Fire Door Vision Panels Fire Doors and Gateway 2 in Higher-Risk Buildings Fire Rated Glass Cost Explained Fire Rated Sliding Doors Explained Fire Rated Windows Cost Factors Fire Rated Windows Explained Fire Safety Enforcement Notices and Fire Doors: What the Responsible Person Must Do Flat Entrance Doors: PAS 24 and Fire Rated Forced Entry vs Ballistic vs Blast: Which Rating a Site Needs Garage Security Doors Explained Gate Automation Explained Golden Thread Records for Fire Doors GP Surgery Security Doors Explained Gym Security Doors Explained High Speed Doors HMO Fire Doors Hospice Security Doors Explained Hospital Security Doors: Wards, A&E, Plant Hospital Security Gates Hotel Fire Doors Hotel Security Doors How to choose HVM bollards: fixed, shallow mount, removable and automatic How to keep an LPS 1175 door rating valid after installation How to Specify Fire Doors in a Housing Tender How to specify security doors: a checklist for architects How to Verify a Secured by Design Listing How to Verify an LPS 1175 Certificate on Red Book Live How to Write an Operational Requirement for Physical Security HVM planters and street furniture: protection that blends in In-Service Care of Vehicle Security Barriers Installation Handover: LPS 1175 Doors and PAS 68 Barriers Intumescent Seals ISO 16933 explained: EXV and SB classes and hazard ratings ISO 22343 vehicle security barriers explained Keeping a Dual-Certified Fire and Security Door Valid in Service Laboratory Security Doors Lead Times and Programme Risks for LPS 1175 Doors Leisure Centre Security Doors Library Security Doors Listed Building Fire Doors Loading Bay Doors Explained Lockdown and Access Control Hardware on an LPS 1175 Door LPS 1175 Gates and Grilles Explained LPS 1175 Issue 8 explained: from SR1 to SR8 to A1 to H20 LPS 1175 Roller Shutters LPS 1175 vs ASTM F2781 and Other US Ratings Explained LPS 1175 vs EN 1627: how UK and European burglar resistance ratings compare LPS 1175 vs PAS 24: which security standard does your door need? LPS 1175 Windows and Walling Explained Martyn’s Law and Places of Worship: What a Buyer Checks for Doors and Entry Control Martyn’s Law Enhanced Tier: Physical Measures and the Specifier Brief Martyn’s Law Standard Tier: Procedures, Doors and Shutters Martyn’s Law Timeline and the SIA Regulator Martyn’s Law: what premises must do and which physical measures to consider Master Key Systems MRI and RF shielded rooms: how they work and what to specify Museum Security Doors NPSA Catalogue of Security Equipment (CSE) Explained NPSA Forced Entry and Blast Guidance for Government Sites NPSA Guidance on Lockdown and Marauding Attack: What It Asks of Doors and Entrances Office Security Doors Optician Security Doors Explained Panic Hardware PAS 24 requirements for doors and windows explained PAS 68 Bollard Foundations Explained PAS 68 bollards: ratings, spacing and cost factors PAS 68 vs IWA 14 vs ISO 22343: hostile vehicle mitigation standards explained Pawnbroker Security Doors Explained Pedestrian Gates Petrol Station Security Doors Pharmacy Security Doors Planning Permission for Security Shutters, Gates and Bollards on Commercial Premises Plant room doors: fire, security and ventilation requirements Plant Room Fire Doors Port Security Doors Post Office Security Doors Explained Powder coating vs galvanising vs paint for steel Preliminary Market Engagement for Security Doors and HVM Prison Security Doors Programming a Security Door and Barrier Package on a Live Site Public-Sector Tender Response Checklist for Security Door and HVM Supply Reading a PAS 24 and SBD Door Test Report Regulation 38 Fire Safety Information at Handover for Fire-Rated Security Doorsets Replacing Security Doors in an Occupied Building Restaurant Security Doors Retail Security Doors Revolving Doors RF shielding standards and how shielded rooms are tested Rising Bollard Cost Factors Road Blocker Cost Factors Explained Road Blockers Explained Roller Shutter Cost Factors: What Drives the Price Roller shutter regulations in the UK: safety and maintenance Safe room and panic room doors: specification basics Safety Duties for Powered Doors, Gates and Barriers on Commercial Sites School Security Doors Sectional Doors Secured by Design explained: is it mandatory for doors? Secured by Design vs NPSA vs LPCB: Which One You Need Security Door Locks Security Door Maintenance Checklist Security Doors and Access for Everyone: What Approved Document M Asks Security Doors for A and E Departments Security Doors for Badminton Clubs Security Doors for Bowling Alleys Security Doors for Bowls Clubs Security Doors for Climbing Centres Security Doors for Cricket Clubs Security Doors for Dialysis Centres Security Doors for Golf Clubs Security Doors for Hockey Clubs Security Doors for Ice Rinks Security Doors for Maternity Units Security Doors for Mental Health Units Security Doors for Oncology Units Security Doors for Operating Theatres Security Doors for Rehabilitation Centres Security Doors for Snooker Clubs Security Doors for Squash Clubs Security Doors for Swimming Pools Security Doors for Tennis Clubs Security Doors for Walk-in Centres Security Doors West Midlands Explained Security Fencing Security Gates Cost Factors Explained Security shutters vs high performance roller doors Security shutters vs retractable grilles: which suits retail and commercial openings? Security Turnstiles Explained Security Window Film Security Windows for Schools Explained Self Storage Security Doors Server Room Doors Explained Shopping Centre Security Doors Smoke Control Doors Explained Smoke Curtains Specification Mistakes When Mixing LPS 1175, PAS 24 and SBD in One Tender SR2 vs SR3 vs SR4 security doors: choosing the right LPS 1175 level Stadium Security Doors Steel Door Frames Steel vs aluminium security doors: strength, ratings and looks Steel vs timber fire doors: which suits your building? Student Accommodation Security Doors Substation doors: security, ventilation and specification Supermarket Security Doors Telescopic Bollards Tender Evaluation Criteria and Scoring for Security Doors and HVM The Scope of a Maintenance Contract for Security Doors and Barriers Theatre Security Doors Thermal and Weather Performance of External Security Doorsets Thermally broken steel security doors: U-values and certification Traffic Calming as Hostile Vehicle Mitigation Transport hub security requirements Turnstile Cost Factors Explained Turnstile vs speed gate vs security portal: choosing entrance control Types of security doors for commercial buildings University Security Doors Explained Vehicle Dynamics Assessment: What It Tells the Buyer Before a Barrier Is Specified Warehouse Security Doors Explained Warehouse Security Gates Warranty, Defects Liability and Guarantees for Security Doors and Barriers What affects the cost of a bullet resistant door What affects the cost of a high-security door in the UK Window Security Bars View all →

Products

One supplier for the whole building envelope