Martyn’s Law Standard Tier: Procedures, Doors and Shutters

Standard tier premises need procedures, not new equipment, under Martyn's Law. The four procedures and where doors and shutters help on a lockdown.

  • ✓Third-party test evidence with every product
  • ✓Written specification you can issue to tender
  • ✓Supplied and installed across the UK
Prefer to talk?+44 7352 267239

Get a free project quote

Rating, written specification and budget range within one working day.

ArxBridge Quote Form

Confidential. No cost, no obligation.

Third-party tested

Evidence with every quote

UK manufactured

Made to your sizes

One accountable team

Specify, supply, install

Confidential handling

Details never shared

Standard tier premises need procedures, not new equipment, under Martyn’s Law. The four procedures the Act names, what reasonably practicable means, and where doors and shutters help.

  • 200 to 799 peopleThe standard tier band
  • Four proceduresEvacuation, invacuation, lockdown, communication
  • No equipment requiredThe Act asks for procedures, not purchases
  • LockdownLock doors, close shutters, use barriers

Who the standard tier covers

The standard tier covers premises where the capacity sits between 200 and 799 people, at the busiest times. Staff count too, and the test is the greatest number who may be present, not the number there on a quiet day.

Childcare, primary, secondary and further education premises, and places of worship, stay in the standard tier once 200 people or more may be present, even at 800 or more. The SIA page on Martyn’s Law and the regulator sets out the tiers and that exception.

The four procedures the Act names

Section 5 of the Act names four public protection procedures. The responsible person must have appropriate procedures in place, so far as is reasonably practicable, to reduce the risk of physical harm if an attack were to occur at the premises or in the immediate vicinity. They are the core of the standard tier duty, and they apply to the enhanced tier too.

Each procedure answers a different situation, and the choice turns on where the threat is coming from. If the threat seems to be inside the premises, evacuation may be the best option. If it seems to be coming from outside, invacuation or lockdown may be more appropriate. The Home Office statutory guidance gives the four procedures and the examples for each.

Procedure What it means What it looks like
Evacuation Getting people away from danger Moving people out of the premises or part of it
Invacuation Moving people to a safer place inside Bringing people in from outside
Lockdown Securing the premises Locking doors, closing shutters, using barriers
Communication Getting information to people Alerting people and giving instructions

The immediate vicinity matters too. That is the area close to the premises, such as a pavement outside a venue, where people gather in connection with the premises. The procedures should consider how they cut the risk of physical harm to people there, so far as is reasonably practicable. The tiers and the measures to consider are set out in our Martyn’s Law guide for premises.

Need this specified for your project?Free rating, written specification and budget range within one working day.
Get a free quote

Procedures first, equipment second

The Act does not require a standard tier premises to make physical alterations or to buy specific equipment in order to put its procedures in place. A procedure is a plan that staff can carry out, not a purchase, and the duty is met by having the plan, the people who know it, and the means to run it.

That does not mean equipment never matters. In certain circumstances it may be reasonably practicable to make a physical alteration that improves a procedure, and the guidance gives two examples: changing how doors are locked, and altering the location of shutter controls. The test is the same as elsewhere: weigh the objectives against the cost, time and difficulty, taking account of the nature of the premises and the resources available.

Existing equipment counts first. When the responsible person works out what is appropriate, the guidance asks them to consider the doors, locks and public address systems already in the building, and the areas easily secured. A procedure built on what the building already has is easier to run.

Where doors help a lockdown

A lockdown secures the premises so nobody can enter or leave, for example to stop an attacker moving through the building by locking doors, closing shutters or putting barriers in the way. The doors are the first thing a lockdown procedure reaches for, because they are the points where a person moves between parts of the building.

The guidance gives a retail example. Staff hear activity outside and members of the public rush to the front doors. The duty manager decides on invacuation followed by lockdown: people nearby outside are brought inside, the shop is secured, the front and rear doors are locked, and everyone inside is directed to shelter in rooms deeper in the building with lockable doors.

A lockdown procedure is only as fast as its slowest door. If one entrance needs a key that lives in an office two floors up, the procedure fails at that door.

Doors help the other procedures too. Evacuation needs doors that open freely on the escape route, and invacuation needs doors that close behind the people moving to safety. The same door can serve all three procedures, so the procedure should name each door and what happens to it. Our panic hardware guide covers the fittings that let a door open fast under pressure.

Where shutters help, and where the controls sit

Shutters are the second tool the lockdown definition names, and they close the wide openings that doors cannot: shopfronts, counters, serving hatches and loading bays. A shutter over a shopfront turns a glazed frontage into a closed face, and a shutter over a counter closes the gap to the rooms behind it.

The guidance names the location of shutter controls as one of the physical alterations that may be reasonably practicable. A control behind the counter it protects can be reached in seconds; a control in a locked office cannot. The restaurant example builds its lockdown procedure around the locks and shutters already in place, and judges them suitable to lock the premises down if required.

Shutters need the same thought as doors when the procedure is written. The procedure should say which shutters close, who closes them, and in what order, and it should be practised so the order is known before it is needed. Our LPS 1175 roller shutters guide covers rated shutters, and the roller shutter regulations guide lists the safety rules for them.

When a procedure does not fit

Not every procedure fits every premises. If a procedure is not appropriate or not reasonably practicable, it helps to record the rationale, in case the regulator asks. An outdoor event with no enclosed areas, such as a firework display, may not be able to put an invacuation procedure in place, because there is nowhere inside to move people to.

The Act does not require a separate procedure for every type of attack. The guidance lists the attack methods that have featured in previous UK attacks or attack planning: marauding terrorist attack, vehicle as a weapon, improvised explosive device, fire as a weapon and hazardous substances. One simple evacuation procedure, carried out quickly, is likely to be more effective than several versions that leave staff unsure which to choose.

The same thinking applies to the choice between procedures. A bar in the guidance first wrote a different evacuation procedure for each attack method, then replaced them with one simple procedure after a practice showed staff hesitating over which version to use. Quick action is likely to be the most effective way of minimising harm.

Writing the procedures down and keeping them current

There is no legal requirement in the standard tier to prepare a document stating the procedures in place and an assessment of how they may reduce the risk of physical harm. The guidance still recommends preparing one, because a written procedure is what staff are trained on and what the regulator can check.

Procedures should be reviewed when the premises changes. A new entrance, changed opening hours, a larger event or a refurbishment can change which procedures fit and which doors and shutters they rely on. The standard tier has no statutory review duty for procedures, unlike the enhanced tier duty to keep measures under review, but an out-of-date procedure will not work.

Staff need to know the procedures before they are needed. The guidance stresses instruction and practice, and the bar example shows why: the practice exposed the hesitation, and the fix was a simpler procedure and a fresh exercise. Our Martyn’s Law standards page gives the tiers and the regulator in brief, and the education sector page shows how lockdown thinking fits schools.

Must a standard tier premises buy new equipment?

No. The Act does not require physical alterations or specific equipment to put procedures in place. A change may still be sensible in some circumstances, such as how doors are locked or where shutter controls sit.

What are the four public protection procedures?

Evacuation, invacuation, lockdown and communication. They apply to both tiers, and which one fits depends on where the threat is coming from and what keeps people safest in the moment.

Can a shutter be part of a lockdown procedure?

Yes. A lockdown procedure can name doors and shutters as the way to stop movement through the building. The procedure should set the order the shutters close in, and who closes each one.

What if invacuation is impossible at our premises?

Record the reason. An outdoor event with no enclosed areas has nowhere inside to move people to, and the guidance says it helps to record that rationale in case the regulator asks.

Do standard tier procedures need a written document?

The Act does not require one at standard tier, though the guidance recommends preparing one. Staff are trained on the written procedure, and the regulator can check it.

Ready to plan procedures for a standard tier premises?Send the capacity figure, the layout and the doors and shutters already fitted.
Contact us for a free quote

Related

More in guides for specifiers

10 mistakes when specifying certified security doors 10 steps to specify an LPS 1175 door Acceptance and Snagging of a Security Door or Barrier Job Access Control Doors Acoustic Doors: Ratings and Specification After a Forced Entry Attempt: Checking a Security Door Airport Security Doors Anti-Ligature Doors for Mental Health Wards Anti-Ram Bollards Anti-ram gates and barriers: protecting vehicle entrances Arcade Security Doors Explained Automatic Doors Automatic Gates Cost Factors Automatic Vehicle Barriers Ballistic Panels Bank Security Doors Bingo Hall Security Doors Explained Blast doors: glazed vs solid and how they are rated Blast protection window film: what it does and what it cannot do Blast resistant windows: what drives the cost and how to specify them Bollard Cost Factors Explained Bollard regulations in the UK: spacing, height and depth Bookmaker Security Doors Explained Builders Merchant Security Doors Bullet Resistant Glass Cost Factors Bullet resistant glass ratings explained: BR1 to BR7 and SG classes Bullet resistant vs bulletproof glass: what the difference means Buying Security Doors and HVM Through Public Frameworks Car Park Security Doors Explained Car Showroom Security Doors Casino Security Doors Explained CDM 2015 Duties When Security Doors, Shutters or HVM Are Installed Cinema Security Doors Cleanroom Doors Cold Store Doors College Security Doors Commissioning, Handover and the O&M Manual for Security Doors and HVM Communal entrance doors for flats: Secured by Design and what to specify Community Centre Security Doors Control Room Doors Court Security Doors Crash Rated Fences and HVM Fencing Explained Data centre physical security: doors, glazing, HVM and shielding by zone Dental Practice Security Doors Depot Security Doors Explained Door Entry Systems Due Diligence When Selecting Vehicle Security Barriers Emergency Exit Doors EMP Shielding Cost Factors Explained Exhibition Centre Fire Door Rules Exhibition Centre Security Doors Factory Security Doors Faraday cage vs RF shielded room: what a business needs FB4 vs FB6 vs FB7: how to choose a ballistic rating Fire and security doors: how dual certification works Fire Compartmentation Fire Curtains Fire Door Certification Fire Door Closers Explained Fire Door Cost Factors Fire Door Duties of the Accountable Person Fire Door Gaps Fire Door Hardware Explained Fire door inspection checklist for steel and timber doors Fire Door Maintenance Fire Door Regulations Care Homes Fire Door Regulations for A and E Departments Fire Door Regulations for Airports Explained Fire Door Regulations for Bowls Clubs Fire door regulations for commercial buildings in the UK Fire Door Regulations for Dialysis Centres Fire Door Regulations for Hockey Clubs Fire Door Regulations for Hospitals Explained Fire Door Regulations for Offices Explained Fire Door Regulations for Operating Theatres Fire Door Regulations for Retail Explained Fire Door Regulations for Schools Explained Fire Door Regulations for Snooker Clubs Fire Door Regulations for Stadiums Fire Door Regulations for Student Accommodation Fire Door Regulations for Warehouses Fire Door Regulations Leisure Centres Fire Door Regulations Restaurants Fire Door Remediation Programme for Housing Providers Fire Door Rules for Badminton Clubs Fire Door Rules for Bingo Halls Fire Door Rules for Bookmakers Fire Door Rules for Bowling Alleys Fire Door Rules for Car Parks Fire Door Rules for Car Showrooms Fire Door Rules for Cinemas Fire Door Rules for Climbing Centres Fire Door Rules for Colleges Fire Door Rules for Community Centres Fire Door Rules for Cricket Clubs Fire Door Rules for Dental Practices Fire Door Rules for Depots Explained Fire Door Rules for Golf Clubs Fire Door Rules for GP Surgeries Fire Door Rules for Gyms Explained Fire Door Rules for Ice Rinks Fire Door Rules for Maternity Units Fire Door Rules for Mental Health Units Fire Door Rules for Museums Fire Door Rules for Oncology Units Fire Door Rules for Opticians Fire Door Rules for Pawnbrokers Fire Door Rules for Petrol Stations Fire Door Rules for Pharmacies Fire Door Rules for Ports Fire Door Rules for Post Offices Fire Door Rules for Prisons Fire Door Rules for Rehabilitation Centres Fire Door Rules for Self Storage Fire Door Rules for Shopping Centres Fire Door Rules for Squash Clubs Fire Door Rules for Supermarkets Fire Door Rules for Swimming Pools Fire Door Rules for Tennis Clubs Fire Door Rules for Theatres Fire Door Rules for UK Arcades Fire Door Rules for UK Casinos Fire Door Rules for UK Hospices Fire Door Rules for Walk-in Centres Fire Door Signage Fire Door Vision Panels Fire Doors and Gateway 2 in Higher-Risk Buildings Fire Rated Glass Cost Explained Fire Rated Sliding Doors Explained Fire Rated Windows Cost Factors Fire Rated Windows Explained Fire Safety Enforcement Notices and Fire Doors: What the Responsible Person Must Do Flat Entrance Doors: PAS 24 and Fire Rated Forced Entry vs Ballistic vs Blast: Which Rating a Site Needs Garage Security Doors Explained Gate Automation Explained Golden Thread Records for Fire Doors GP Surgery Security Doors Explained Gym Security Doors Explained High Speed Doors HMO Fire Doors Hospice Security Doors Explained Hospital Security Doors: Wards, A&E, Plant Hospital Security Gates Hotel Fire Doors Hotel Security Doors How to choose HVM bollards: fixed, shallow mount, removable and automatic How to keep an LPS 1175 door rating valid after installation How to Specify Fire Doors in a Housing Tender How to specify security doors: a checklist for architects How to Verify a Secured by Design Listing How to Verify an LPS 1175 Certificate on Red Book Live How to Write an Operational Requirement for Physical Security HVM planters and street furniture: protection that blends in In-Service Care of Vehicle Security Barriers Installation Handover: LPS 1175 Doors and PAS 68 Barriers Intumescent Seals ISO 16933 explained: EXV and SB classes and hazard ratings ISO 22343 vehicle security barriers explained Keeping a Dual-Certified Fire and Security Door Valid in Service Laboratory Security Doors Layered Security for a Site: Deter, Detect, Delay, Mitigate, Respond Lead Times and Programme Risks for LPS 1175 Doors Leisure Centre Security Doors Library Security Doors Listed Building Fire Doors Loading Bay Doors Explained Lockdown and Access Control Hardware on an LPS 1175 Door LPS 1175 Gates and Grilles Explained LPS 1175 Issue 8 explained: from SR1 to SR8 to A1 to H20 LPS 1175 Roller Shutters LPS 1175 vs ASTM F2781 and Other US Ratings Explained LPS 1175 vs EN 1627: how UK and European burglar resistance ratings compare LPS 1175 vs PAS 24: which security standard does your door need? LPS 1175 Windows and Walling Explained Martyn’s Law and Places of Worship: What a Buyer Checks for Doors and Entry Control Martyn’s Law Enhanced Tier: Physical Measures and the Specifier Brief Martyn’s Law Timeline and the SIA Regulator Martyn’s Law: what premises must do and which physical measures to consider Master Key Systems MRI and RF shielded rooms: how they work and what to specify Museum Security Doors NPSA Catalogue of Security Equipment (CSE) Explained NPSA Forced Entry and Blast Guidance for Government Sites NPSA Guidance on Lockdown and Marauding Attack: What It Asks of Doors and Entrances Office Security Doors Optician Security Doors Explained Panic Hardware PAS 24 requirements for doors and windows explained PAS 68 Bollard Foundations Explained PAS 68 bollards: ratings, spacing and cost factors PAS 68 vs IWA 14 vs ISO 22343: hostile vehicle mitigation standards explained Pawnbroker Security Doors Explained Pedestrian Gates Petrol Station Security Doors Pharmacy Security Doors Planning Permission for Security Shutters, Gates and Bollards on Commercial Premises Plant room doors: fire, security and ventilation requirements Plant Room Fire Doors Port Security Doors Post Office Security Doors Explained Powder coating vs galvanising vs paint for steel Preliminary Market Engagement for Security Doors and HVM Prison Security Doors Programming a Security Door and Barrier Package on a Live Site Public-Sector Tender Response Checklist for Security Door and HVM Supply Reading a PAS 24 and SBD Door Test Report Regulation 38 Fire Safety Information at Handover for Fire-Rated Security Doorsets Replacing Security Doors in an Occupied Building Restaurant Security Doors Retail Security Doors Revolving Doors RF shielding standards and how shielded rooms are tested Rising Bollard Cost Factors Road Blocker Cost Factors Explained Road Blockers Explained Roller Shutter Cost Factors: What Drives the Price Roller shutter regulations in the UK: safety and maintenance Safe room and panic room doors: specification basics Safety Duties for Powered Doors, Gates and Barriers on Commercial Sites School Security Doors Sectional Doors Secured by Design explained: is it mandatory for doors? Secured by Design vs NPSA vs LPCB: Which One You Need Security Door Locks Security Door Maintenance Checklist Security Doors and Access for Everyone: What Approved Document M Asks Security Doors for A and E Departments Security Doors for Badminton Clubs Security Doors for Bowling Alleys Security Doors for Bowls Clubs Security Doors for Climbing Centres Security Doors for Cricket Clubs Security Doors for Dialysis Centres Security Doors for Golf Clubs Security Doors for Hockey Clubs Security Doors for Ice Rinks Security Doors for Maternity Units Security Doors for Mental Health Units Security Doors for Oncology Units Security Doors for Operating Theatres Security Doors for Rehabilitation Centres Security Doors for Snooker Clubs Security Doors for Squash Clubs Security Doors for Swimming Pools Security Doors for Tennis Clubs Security Doors for Walk-in Centres Security Doors West Midlands Explained Security Fencing Security Gates Cost Factors Explained Security shutters vs high performance roller doors Security shutters vs retractable grilles: which suits retail and commercial openings? Security Turnstiles Explained Security Window Film Security Windows for Schools Explained Self Storage Security Doors Server Room Doors Explained Shopping Centre Security Doors Smoke Control Doors Explained Smoke Curtains Specification Mistakes When Mixing LPS 1175, PAS 24 and SBD in One Tender SR2 vs SR3 vs SR4 security doors: choosing the right LPS 1175 level Stadium Security Doors Steel Door Frames Steel vs aluminium security doors: strength, ratings and looks Steel vs timber fire doors: which suits your building? Student Accommodation Security Doors Substation doors: security, ventilation and specification Supermarket Security Doors Telescopic Bollards Tender Evaluation Criteria and Scoring for Security Doors and HVM The Scope of a Maintenance Contract for Security Doors and Barriers Theatre Security Doors Thermal and Weather Performance of External Security Doorsets Thermally broken steel security doors: U-values and certification Traffic Calming as Hostile Vehicle Mitigation Transport hub security requirements Turnstile Cost Factors Explained Turnstile vs speed gate vs security portal: choosing entrance control Types of security doors for commercial buildings University Security Doors Explained Vehicle Dynamics Assessment: What It Tells the Buyer Before a Barrier Is Specified Warehouse Security Doors Explained Warehouse Security Gates Warranty, Defects Liability and Guarantees for Security Doors and Barriers What affects the cost of a bullet resistant door What affects the cost of a high-security door in the UK Window Security Bars View all →

Products

One supplier for the whole building envelope

Ready to specify your project?

Free assessment, written specification and test evidence. Reply within one working day.