ArxBridge
Fire Door Rules for Climbing Centres
Climbing centres run tall walls, a kit hire desk, a cafe and changing rooms from morning into the evening, so each door takes the period its room asks for.
- ✓Third-party test evidence with every product
- ✓Written specification you can issue to tender
- ✓Supplied and installed across the UK
Get a free project quote
Rating, written specification and budget range within one working day.
Confidential. No cost, no obligation.
Third-party tested
Evidence with every quote
UK manufactured
Made to your sizes
One accountable team
Specify, supply, install
Confidential handling
Details never shared
A climbing centre entrance leaf takes FD30 to EN 1634-1, and the climbing hall, the reception, the changing rooms and the cafe take the same period, while the kit store, the back office and the plant room take FD60.
A leaf proved to EN 1634-1 is tested against fire and given minutes, from FD30 to FD120, and the letters beside the minutes name what the leaf stops: E for flame, EW for flame and part of the heat, and EI for flame and heat together.
A climbing centre plays up one tall wall, where climbers arrive through the day, hire kit at the desk, eat in the cafe and change beside the hall, so each leaf round the wall takes the period that fits the room behind it.
- FD30 / FD60Periods to EN 1634-1
- Climbing hallTall walls beside the ropes
- Kit storeWhere FD60 holds the heat
- One routeFrom the wall to the car park
The climbing centre order: one period beside each leaf
The order names eight leaves, and the period beside each one follows the room that sits behind it, so the entrance, the climbing hall, the reception, the changing rooms and the cafe sit at FD30, and the kit store, the back office and the plant room sit at FD60.
Five of the eight leaves sit at FD30, a thirty minute hold, because the rooms behind them stay full of climbers from the first session to the last, and the other three sit at FD60, a sixty minute hold, because the rooms behind them hold ropes, records or plant.
Every leaf on the order gets a line of its own that names the room, the period, the grade and the closer, so the fitter, the manager and the person who signs all work from the same list.
| Room | Period | Grade | What to check |
|---|---|---|---|
| Entrance | FD30 | B3 | Leaf, closer, seals |
| Climbing hall | FD30 | B3 | Leaf, closer, seals |
| Reception | FD30 | B3 | Leaf, closer, seals |
| Changing rooms | FD30 | B3 | Leaf, closer, seals |
| Cafe | FD30 | B3 | Leaf, closer, seals |
| Kit store | FD60 | C5 | Leaf, closer, seals |
| Back office | FD60 | C5 | Leaf, closer, seals |
| Plant room | FD60 | C5 | Leaf, closer, seals |
One leaf can carry fire minutes from EN 1634-1 beside a forced entry grade from LPS 1175 Issue 8.2, so a leaf can hold FD30 or FD60 and B3 or C5 at once, and the dual doorset guide covers the fire test and the forced entry test on one leaf.
Kit store, back office and plant room: FD60 behind shut leaves
The minutes sit on the whole doorset rather than on the leaf alone, so the leaf, the frame, the seals and the closer carry the hour together, and a leaf swapped without its frame loses the minutes its report promises.
FD60 sits on the kit store leaf, which stays shut between sessions, because the ropes and harnesses behind it serve every climber through the day and the leaf has to hold the heat back while the store is empty.
FD60 sits on the back office leaf too, because the membership records and the keys to every other room sit behind it, and the plant room leaf takes FD60 because the pumps and boards that keep the hall lit and warm sit behind that one. The plant room fire door guide covers the leaf that guards the plant.
Between visits the plant room leaf stays shut, because the pumps and the boards behind it run unwatched, and a leaf left open lets heat and smoke reach the plant before anyone knows a fire has started. Only the person who holds the plant room key opens that leaf, and it is shut again before the key goes back.
Entrance and climbing hall: FD30 on the way in and the way out
FD30 sits on the entrance leaf, the climbing hall leaf, the changing room leaves, the reception leaf and the cafe leaf, because those five leaves sit on the way out, and thirty minutes is the time the route needs while climbers leave the hall together.
Climbers leave together once the last session ends, so the leaf on the way out has to open under a crowd without a key or a code, and a push bar proved to BS EN 1125 runs across no less than 60 percent of the leaf width on any leaf that serves more than 60 people. The panic hardware guide covers the bars, and the emergency exit guide covers the leaves that carry them.
A glazed panel in the climbing hall leaf lets staff watch the walls without opening the leaf, so the hall keeps its view of the play while the leaf stays shut on the route out. The vision panel guide covers the glass in a fire leaf and the beads that hold it.
Smoke on the way from the wall to the car park: Sa and S200
Climbers leaving the walls meet smoke before they meet flame, so the leaves on the route past the changing rooms carry a smoke rating to BS EN 1634-3, with Sa for smoke at room temperature and S200 for smoke at 200 degrees.
Leaves that stand open through the day hang on hold-open devices that let go when the alarm sounds, so each leaf shuts on its own and the smoke stays on one side of it. The closer guide covers the closers that shut the leaf, while the smoke control guide covers the leaves that hold smoke back.
Smoke moves down a corridor while climbers are still gathering ropes and chalk bags, so the leaves on the route shut before the smoke reaches the hall, and the rooms on either side of the route stay apart. The compartmentation guide shows how those leaves split the building into parts that hold fire and smoke apart.
Closers, seals and gaps: what the climbing centre periods rest on
An FD60 leaf holds its hour when the closer shuts it, the seals meet the frame and the gaps round the leaf stay at 4 mm, because a leaf left ajar gives its minutes away before the fire reaches it. The gap guide shows how the 4 mm gap is measured.
A seal in the groove swells shut once the heat passes 200 degrees and keeps swelling to 250 degrees, so the gap round the leaf closes as the fire grows. The seal guide covers the seals that swell in the heat and the smoke seals beside them.
Hinges proved to BS EN 1935 are tested through 200,000 cycles, with grade 13 rated for 120 kg and grade 14 rated for 160 kg, and a closer proved to BS EN 1154 runs from EN 1, the smallest power size, to EN 3, the smallest size that may sit on a fire door. The hardware guide covers the hinges, the closers and the locks that hold a fire leaf together.
A fire leaf has to open under a light hand as well as shut on its own, because a climber with a harness in one hand and a chalk bag in the other still has to get through it. BS 8300 and Approved Document M put the opening force below 30 N through the first 30 degrees and below 22.5 N beyond that, so the closer that shuts the leaf must not make the leaf too heavy to push.
Evening sessions and the way to the car park: getting climbers out after dark
The route to the car park is signed at every turn, because the alarm may sound while the hall is full and climbers have to find the way out without asking. The signage guide covers the signs that sit on the leaf and along the route.
Martyn’s Law received Royal Assent in April 2025 and is expected to go live in spring 2027, with tiers for premises that hold 200 to 799 people and for premises that hold 800 or more, so a centre that fills its hall through the evening needs to know which tier it sits in. The Martyn’s Law guide covers the tiers and what each one asks of a venue.
Outside the centre, the car park needs the same thought as the route, because climbers gather there after the alarm sounds. ProtectUK puts the clear gap between bollards at no more than 1,200 mm and their height at no less than 500 mm, and the bollard guide covers the posts that guard the front of the building.
When the alarm sounds in an evening session, the duty steward walks the hall and the changing rooms to check no one is left behind, while the cafe staff clear the cafe and the tables. That walk works only when the leaves on the route shut behind the steward, so the route stays clear and the smoke stays on one side of each leaf while the centre empties.
Cafe and reception: FD30 where climbers rest and check in
The cafe leaf takes FD30, because climbers eat and drink in the cafe between routes and the leaf has to hold the heat back while they leave through the hall and out to the car park.
The reception leaves take FD30 as well, because climbers check in there through the day and the kit hire desk beside the hall holds the ropes, the harnesses and the spare shoes, so the leaves round those rooms hold for thirty minutes while the rooms empty.
A restaurant cafe asks for the same period on its leaves, and a bowling alley keeps the same hours as a climbing centre, with play and drink running side by side into the evening. The restaurant fire door guide and the bowling alley fire door guide show how those rooms take FD30, while the leisure centre guide and the gym fire door guide cover buildings where the hall is only one part of the play.
Period, grade and proof: putting the climbing centre fire order on one list
Every leaf on the order gets a line of its own, with the room, the period, the grade and the closer written beside it, and the line is read back against the room before the order is signed, so no leaf goes in with the wrong minutes.
Every leaf on the order is checked before the order is signed, because a closer that will not shut the leaf and a seal that will not meet the frame both take the minutes off the leaf. The certification guide covers the proof behind each leaf, and the specifying guide covers the leaf, the frame and the hardware as one doorset.
Once the centre opens, the manager walks round with the door list and tries each leaf in turn, and a leaf that will not shut goes on the list the same day. The inspection checklist covers what to try on each leaf, and the maintenance guide covers the work that keeps the leaves shutting as they should.
Write the period, the grade and the closer on one line for each leaf, and check that line against the room before the order goes in.
What period should a climbing centre plant room door carry?
FD60 to EN 1634-1, because the pumps and boards in the plant room keep the hall lit and warm.
What period should a climbing centre entrance door carry?
FD30 to EN 1634-1, because the entrance leaf sits on the route out to the car park.
Can a climbing centre leaf hold a fire period and a security grade?
Yes, one doorset can hold fire minutes beside a forced entry grade, with both results on one report.
Do climbing centre fire doors need a smoke rating?
Yes, the leaves on the route from the wall to the car park carry Sa or S200 to BS EN 1634-3, so smoke stays behind the leaf while climbers leave.
What happens when a fire door will not shut?
A leaf that will not shut goes on the door list the same day, and it stays there until the closer or the seals let it shut again.
Get a free quote
Related
More in guides for specifiers
Products
One supplier for the whole building envelope
Ready to specify your project?
Free assessment, written specification and test evidence. Reply within one working day.