A post office needs FD60 on the rooms that hold cash and parcels and FD30 on the public route, so each leaf takes the period its room demands.

  • ✓Third-party test evidence with every product
  • ✓Written specification you can issue to tender
  • ✓Supplied and installed across the UK
Prefer to talk?+44 7352 267239

Get a free project quote

Rating, written specification and budget range within one working day.

ArxBridge Quote Form

Confidential. No cost, no obligation.

Third-party tested

Evidence with every quote

UK manufactured

Made to your sizes

One accountable team

Specify, supply, install

Confidential handling

Details never shared

A post office door takes its fire period from the room behind it. The cash office, the parcels store, the back office and the plant room take FD60, and the counter and the entrance take FD30, because the rooms behind the counter hold cash, parcels and records that need a longer hold than the public route. The period sits beside the leaf on the order, and the leaf, the frame and the seals are proved together for that period.

The proof comes from EN 1634-1, which names the period in minutes from 30 to 120 and the letters E, EW and EI that say what the leaf held back. FD30 holds for 30 minutes and FD60 holds for 60 minutes, and the letters beside the number say whether the leaf held flame alone or flame and heat together. A leaf ordered as FD60 without its letters leaves the branch unsure what the leaf was proved to hold. The fire ratings standard page names how the letters and the minutes sit together.

A post office leaf may also need to hold forced entry, and the grade beside the period comes from LPS 1175 Issue 8.2 of September 2024. The entrance and the counter take B3, the parcels store, the back office and the plant room take C5, and the cash office takes D10, and the minutes behind those grades are three, five and ten. The bank security doors guide takes the same pairing of period and grade for a branch that holds cash behind a counter, and the fire and security doors dual certification guide shows how the two proofs are taken on one doorset. The LPS 1175 Issue 8 explained guide sets out what Issue 8.2 changed.

  • FD60 / FD30Periods to EN 1634-1
  • Cash officeWhere FD60 sits
  • 4 mmGap round a hung leaf
  • One listEvery leaf on one line

Six rooms behind the counter: which period each one takes

Six rooms make up a post office, and the period follows what each room holds. The entrance meets the queue from the street, the counter holds the cash the queue hands over, the cash office holds the takings, the parcels store holds the parcels the branch moves, the back office holds the records and the keys, and the plant room keeps the lights and the heat running through the working day.

The cash office, the parcels store, the back office and the plant room take FD60, because the takings, the parcels, the records and the machinery behind those leaves need an hour before flame passes the leaf. The counter and the entrance take FD30, because the public route must hold long enough for the queue to reach the street and no longer than the rooms behind the counter demand.

The table below names the six rooms, the period each one takes and the grade that sits beside the period, so the fitter can check each leaf against its line as it is hung and the branch can see at a glance which leaf holds for an hour and which holds for half an hour.

Room Period Grade What to check
Entrance FD30 B3 Leaf, closer, vision panel
Counter FD30 B3 Leaf, lock, seals
Cash office FD60 D10 Leaf, lock, reader
Parcels store FD60 C5 Leaf, lock, seals
Back office FD60 C5 Leaf, lock, reader
Plant room FD60 C5 Leaf, lock, seals

The cash office holds FD60 behind a shut steel leaf

The cash office holds the takings of the branch, and its leaf takes FD60 because an hour is the hold the takings demand when flame reaches the corridor outside. The leaf is steel, and it stands shut through the working day, opening only for the staff the list names and shutting on its own behind each person through it.

The leaf, the frame and the seals are proved together as one doorset for FD60, and the report names the period and the letters beside it, so the branch knows the leaf was proved as a whole rather than as parts that were never tested together. The fire door certification guide names what the report must hold before the leaf is accepted on site, and the steel vs timber fire doors guide names why a steel leaf suits a room that holds cash. The keeping an LPS 1175 rating valid guide names what can undo a rating after a door is hung.

Need this specified for your project?Free rating, written specification and budget range within one working day.
Get a free quote

Parcels, back office and plant room: why FD60 sits on the stores

The parcels store holds the parcels the branch moves each day, and a stack of parcels feeds flame fast once it catches, so its leaf takes FD60 and stands shut between deliveries. The back office holds the records and the keys, and the plant room holds the boilers and the boards that run the branch, so both leaves take FD60 for the same reason as the parcels store.

The three leaves sit behind the same corridor as the cash office, and the order names FD60 beside each one so the fitter does not hang a FD30 leaf where the corridor asks for an hour. The fire door regulations warehouses guide takes the same care with the stores of a warehouse, the fire door regulations retail guide takes it with the stock rooms behind a shop, the fire door regulations supermarkets guide takes it with the stores behind a supermarket, the fire door regulations offices guide takes it with the back office of an office, and the plant room fire doors guide takes it with the leaf on a plant room.

The counter and the public route take FD30

The counter leaf stands between the staff and the queue, and it takes FD30 because the public route must hold flame for half an hour while the queue reaches the street. The leaf stays shut while the counter serves, and it opens only for the staff who work behind it, so the period is proved on a leaf that is shut when flame reaches it.

The entrance leaf takes FD30 for the same reason, because the entrance is the way out for the queue and the leaf must hold while the last person through it reaches the street. A glazed panel in the entrance leaf lets the staff see who waits outside, and the pane is proved with the leaf round it, with the beads and the fixings named in the same report. The fire door vision panels guide names what a glazed leaf must hold, and the fire door regulations shopping centres guide takes the same care with the public route through a centre.

Closers, seals and gaps: the hardware that keeps FD60 honest

A FD60 leaf holds for an hour only when its closer shuts it, its seals meet the frame and its gaps stay narrow, because flame passes through a leaf left ajar in seconds and through a wide gap soon after. The closer on each leaf is proved to BS EN 1154, and the power size runs from EN 1 for a leaf 750 mm wide and 20 kg in weight to EN 7 for a leaf 1,600 mm wide and 160 kg in weight, with EN 3 as the minimum on a fire door.

The intumescent seal in the frame swells when the heat round it reaches 200 to 250 degrees, and the swollen seal closes the gap between the leaf and the frame so flame and hot gas cannot pass. The gaps round the leaf are 4 mm once the leaf is hung, and a gauge on the monthly round shows whether a gap has widened past that figure. The intumescent seals guide names how the seal is fitted, the fire door closers guide names what the closer must do, and the fire door gaps guide names how the gaps are measured.

Getting the queue out: the route from the counter to the street

The queue at the counter has never used the building before, so the route from the counter to the street is signed at every turn and kept clear of parcels, trolleys and displays. A leaf on the route opens to one push from whoever reaches it first, and it opens whether the supply to the building is on or off, because the moment the alarm sounds is the moment the route must work.

Where the route serves a crowd, the leaves on the way out take a bar proved to BS EN 1125, set across at least 60 percent of the leaf width, and the bar is the answer where more than 60 people use the route. The emergency exit doors guide names what the way out must do, the panic hardware guide names how the bar is fitted and proved, and the fire door signage guide names what the signs on the route must say.

Smoke on the public route: Sa and S200 beside the period

People on the escape route meet smoke before they meet flame, so the leaves on the public route carry a smoke rating beside their period. The two smoke ratings come from BS EN 1634-3, with Sa for smoke at room temperature and S200 for smoke at 200 degrees, and the seal that earns either rating must meet the frame all round without a break.

A leaf that must stay open through a delivery takes a hold-open device proved to BS EN 1155, which shuts the leaf on its own the moment the alarm sounds. The smoke control doors guide works through how the doors keep smoke back, and the fire compartmentation guide names how the leaves hold the line between one part of the branch and the next.

The post office fire door order: every leaf, its period and its proof

One list carries the whole post office order, with a line for every opening that names the leaf, the period, the grade and the lock beside it. A list that names one leaf for the whole branch leaves the fitter to guess which room takes FD60 and which takes FD30, and a leaf in the wrong room holds for the wrong number of minutes while the branch believes it is covered.

The branch manager walks the post office with the door list each month, trying a few leaves on each walk so every leaf is tried before the month ends. The entrance is tried at opening, the counter before the first customer, and the cash office at closing, and each fault found is written against its own leaf on the day it is found, with the date and the leaf beside it, so a closer that is losing its pull is seen before the leaf stops shutting.

The fire door inspection checklist names what the walk should cover, the fire door maintenance guide names what the walk should find, and the how to specify security doors guide names what the order must hold for every leaf.

The period on a post office leaf follows the room behind it, so FD60 and FD30 must sit on the same list as the grade and the lock for each leaf.

What period should a post office cash office door carry?

FD60 to EN 1634-1, because the cash office holds the takings and an hour is the hold the room behind the leaf demands.

What period should a post office entrance door carry?

FD30 to EN 1634-1, because the entrance is the way out for the queue and half an hour is the hold the public route needs.

Can one post office leaf hold fire and forced entry?

Yes, where a single doorset passed the fire test and the forced entry test together, so the period and the grade sit in one report.

What gap should a post office fire door carry?

4 mm round the leaf once it is hung, and a gauge on the monthly round shows whether the gap has widened past that figure.

Who tries the post office fire doors each month?

The branch manager, who walks the branch with the door list and tries a few leaves on each walk until every leaf has been tried.

Specifying fire doors for a post office?Send the door list and the period each room must hold for a tested door quotation.
Get a free quote

Related

More in guides for specifiers

10 mistakes when specifying certified security doors 10 steps to specify an LPS 1175 door Acceptance and Snagging of a Security Door or Barrier Job Access Control Doors Acoustic Doors: Ratings and Specification After a Forced Entry Attempt: Checking a Security Door Airport Security Doors Anti-Ligature Doors for Mental Health Wards Anti-Ram Bollards Anti-ram gates and barriers: protecting vehicle entrances Arcade Security Doors Explained Automatic Doors Automatic Gates Cost Factors Automatic Vehicle Barriers Ballistic Panels Bank Security Doors Bingo Hall Security Doors Explained Blast doors: glazed vs solid and how they are rated Blast protection window film: what it does and what it cannot do Blast resistant windows: what drives the cost and how to specify them Bollard Cost Factors Explained Bollard regulations in the UK: spacing, height and depth Bookmaker Security Doors Explained Builders Merchant Security Doors Bullet Resistant Glass Cost Factors Bullet resistant glass ratings explained: BR1 to BR7 and SG classes Bullet resistant vs bulletproof glass: what the difference means Buying Security Doors and HVM Through Public Frameworks Car Park Security Doors Explained Car Showroom Security Doors Casino Security Doors Explained CDM 2015 Duties When Security Doors, Shutters or HVM Are Installed Cinema Security Doors Cleanroom Doors Cold Store Doors College Security Doors Commissioning, Handover and the O&M Manual for Security Doors and HVM Communal entrance doors for flats: Secured by Design and what to specify Community Centre Security Doors Control Room Doors Court Security Doors Crash Rated Fences and HVM Fencing Explained Data centre physical security: doors, glazing, HVM and shielding by zone Dental Practice Security Doors Depot Security Doors Explained Door Entry Systems Due Diligence When Selecting Vehicle Security Barriers Emergency Exit Doors EMP Shielding Cost Factors Explained Exhibition Centre Fire Door Rules Exhibition Centre Security Doors Factory Security Doors Faraday cage vs RF shielded room: what a business needs FB4 vs FB6 vs FB7: how to choose a ballistic rating Fire and security doors: how dual certification works Fire Compartmentation Fire Curtains Fire Door Certification Fire Door Closers Explained Fire Door Cost Factors Fire Door Duties of the Accountable Person Fire Door Gaps Fire Door Hardware Explained Fire door inspection checklist for steel and timber doors Fire Door Maintenance Fire Door Regulations Care Homes Fire Door Regulations for A and E Departments Fire Door Regulations for Airports Explained Fire Door Regulations for Bowls Clubs Fire door regulations for commercial buildings in the UK Fire Door Regulations for Dialysis Centres Fire Door Regulations for Hockey Clubs Fire Door Regulations for Hospitals Explained Fire Door Regulations for Offices Explained Fire Door Regulations for Operating Theatres Fire Door Regulations for Retail Explained Fire Door Regulations for Schools Explained Fire Door Regulations for Snooker Clubs Fire Door Regulations for Stadiums Fire Door Regulations for Student Accommodation Fire Door Regulations for Warehouses Fire Door Regulations Leisure Centres Fire Door Regulations Restaurants Fire Door Remediation Programme for Housing Providers Fire Door Rules for Badminton Clubs Fire Door Rules for Bingo Halls Fire Door Rules for Bookmakers Fire Door Rules for Bowling Alleys Fire Door Rules for Car Parks Fire Door Rules for Car Showrooms Fire Door Rules for Cinemas Fire Door Rules for Climbing Centres Fire Door Rules for Colleges Fire Door Rules for Community Centres Fire Door Rules for Cricket Clubs Fire Door Rules for Dental Practices Fire Door Rules for Depots Explained Fire Door Rules for Golf Clubs Fire Door Rules for GP Surgeries Fire Door Rules for Gyms Explained Fire Door Rules for Ice Rinks Fire Door Rules for Maternity Units Fire Door Rules for Mental Health Units Fire Door Rules for Museums Fire Door Rules for Oncology Units Fire Door Rules for Opticians Fire Door Rules for Pawnbrokers Fire Door Rules for Petrol Stations Fire Door Rules for Pharmacies Fire Door Rules for Ports Fire Door Rules for Prisons Fire Door Rules for Rehabilitation Centres Fire Door Rules for Self Storage Fire Door Rules for Shopping Centres Fire Door Rules for Squash Clubs Fire Door Rules for Supermarkets Fire Door Rules for Swimming Pools Fire Door Rules for Tennis Clubs Fire Door Rules for Theatres Fire Door Rules for UK Arcades Fire Door Rules for UK Casinos Fire Door Rules for UK Hospices Fire Door Rules for Walk-in Centres Fire Door Signage Fire Door Vision Panels Fire Doors and Gateway 2 in Higher-Risk Buildings Fire Rated Glass Cost Explained Fire Rated Sliding Doors Explained Fire Rated Windows Cost Factors Fire Rated Windows Explained Fire Safety Enforcement Notices and Fire Doors: What the Responsible Person Must Do Flat Entrance Doors: PAS 24 and Fire Rated Forced Entry vs Ballistic vs Blast: Which Rating a Site Needs Garage Security Doors Explained Gate Automation Explained Golden Thread Records for Fire Doors GP Surgery Security Doors Explained Gym Security Doors Explained High Speed Doors HMO Fire Doors Hospice Security Doors Explained Hospital Security Doors: Wards, A&E, Plant Hospital Security Gates Hotel Fire Doors Hotel Security Doors How to choose HVM bollards: fixed, shallow mount, removable and automatic How to keep an LPS 1175 door rating valid after installation How to Specify Fire Doors in a Housing Tender How to specify security doors: a checklist for architects How to Verify a Secured by Design Listing How to Verify an LPS 1175 Certificate on Red Book Live How to Write an Operational Requirement for Physical Security HVM planters and street furniture: protection that blends in In-Service Care of Vehicle Security Barriers Installation Handover: LPS 1175 Doors and PAS 68 Barriers Intumescent Seals ISO 16933 explained: EXV and SB classes and hazard ratings ISO 22343 vehicle security barriers explained Keeping a Dual-Certified Fire and Security Door Valid in Service Laboratory Security Doors Layered Security for a Site: Deter, Detect, Delay, Mitigate, Respond Lead Times and Programme Risks for LPS 1175 Doors Leisure Centre Security Doors Library Security Doors Listed Building Fire Doors Loading Bay Doors Explained Lockdown and Access Control Hardware on an LPS 1175 Door LPS 1175 Gates and Grilles Explained LPS 1175 Issue 8 explained: from SR1 to SR8 to A1 to H20 LPS 1175 Roller Shutters LPS 1175 vs ASTM F2781 and Other US Ratings Explained LPS 1175 vs EN 1627: how UK and European burglar resistance ratings compare LPS 1175 vs PAS 24: which security standard does your door need? LPS 1175 Windows and Walling Explained Martyn’s Law and Places of Worship: What a Buyer Checks for Doors and Entry Control Martyn’s Law Enhanced Tier: Physical Measures and the Specifier Brief Martyn’s Law Standard Tier: Procedures, Doors and Shutters Martyn’s Law Timeline and the SIA Regulator Martyn’s Law: what premises must do and which physical measures to consider Master Key Systems MRI and RF shielded rooms: how they work and what to specify Museum Security Doors NPSA Catalogue of Security Equipment (CSE) Explained NPSA Forced Entry and Blast Guidance for Government Sites NPSA Guidance on Lockdown and Marauding Attack: What It Asks of Doors and Entrances Office Security Doors Optician Security Doors Explained Panic Hardware PAS 24 requirements for doors and windows explained PAS 68 Bollard Foundations Explained PAS 68 bollards: ratings, spacing and cost factors PAS 68 vs IWA 14 vs ISO 22343: hostile vehicle mitigation standards explained Pawnbroker Security Doors Explained Pedestrian Gates Petrol Station Security Doors Pharmacy Security Doors Planning Permission for Security Shutters, Gates and Bollards on Commercial Premises Plant room doors: fire, security and ventilation requirements Plant Room Fire Doors Port Security Doors Post Office Security Doors Explained Powder coating vs galvanising vs paint for steel Preliminary Market Engagement for Security Doors and HVM Prison Security Doors Programming a Security Door and Barrier Package on a Live Site Public-Sector Tender Response Checklist for Security Door and HVM Supply Reading a PAS 24 and SBD Door Test Report Regulation 38 Fire Safety Information at Handover for Fire-Rated Security Doorsets Replacing Security Doors in an Occupied Building Restaurant Security Doors Retail Security Doors Revolving Doors RF shielding standards and how shielded rooms are tested Rising Bollard Cost Factors Road Blocker Cost Factors Explained Road Blockers Explained Roller Shutter Cost Factors: What Drives the Price Roller shutter regulations in the UK: safety and maintenance Safe room and panic room doors: specification basics Safety Duties for Powered Doors, Gates and Barriers on Commercial Sites School Security Doors Sectional Doors Secured by Design explained: is it mandatory for doors? Secured by Design vs NPSA vs LPCB: Which One You Need Security Door Locks Security Door Maintenance Checklist Security Doors and Access for Everyone: What Approved Document M Asks Security Doors for A and E Departments Security Doors for Badminton Clubs Security Doors for Bowling Alleys Security Doors for Bowls Clubs Security Doors for Climbing Centres Security Doors for Cricket Clubs Security Doors for Dialysis Centres Security Doors for Golf Clubs Security Doors for Hockey Clubs Security Doors for Ice Rinks Security Doors for Maternity Units Security Doors for Mental Health Units Security Doors for Oncology Units Security Doors for Operating Theatres Security Doors for Rehabilitation Centres Security Doors for Snooker Clubs Security Doors for Squash Clubs Security Doors for Swimming Pools Security Doors for Tennis Clubs Security Doors for Walk-in Centres Security Doors West Midlands Explained Security Fencing Security Gates Cost Factors Explained Security shutters vs high performance roller doors Security shutters vs retractable grilles: which suits retail and commercial openings? Security Turnstiles Explained Security Window Film Security Windows for Schools Explained Self Storage Security Doors Server Room Doors Explained Shopping Centre Security Doors Smoke Control Doors Explained Smoke Curtains Specification Mistakes When Mixing LPS 1175, PAS 24 and SBD in One Tender SR2 vs SR3 vs SR4 security doors: choosing the right LPS 1175 level Stadium Security Doors Steel Door Frames Steel vs aluminium security doors: strength, ratings and looks Steel vs timber fire doors: which suits your building? Student Accommodation Security Doors Substation doors: security, ventilation and specification Supermarket Security Doors Telescopic Bollards Tender Evaluation Criteria and Scoring for Security Doors and HVM The Scope of a Maintenance Contract for Security Doors and Barriers Theatre Security Doors Thermal and Weather Performance of External Security Doorsets Thermally broken steel security doors: U-values and certification Traffic Calming as Hostile Vehicle Mitigation Transport hub security requirements Turnstile Cost Factors Explained Turnstile vs speed gate vs security portal: choosing entrance control Types of security doors for commercial buildings University Security Doors Explained Vehicle Dynamics Assessment: What It Tells the Buyer Before a Barrier Is Specified Warehouse Security Doors Explained Warehouse Security Gates Warranty, Defects Liability and Guarantees for Security Doors and Barriers What affects the cost of a bullet resistant door What affects the cost of a high-security door in the UK Window Security Bars View all →

Products

One supplier for the whole building envelope

Ready to specify your project?

Free assessment, written specification and test evidence. Reply within one working day.