ArxBridge
Cinema Security Doors
A cinema guards projection rooms, cash offices and stock rooms behind its doors, so each leaf takes the grade the room behind it demands, screen by screen.
- ✓Third-party test evidence with every product
- ✓Written specification you can issue to tender
- ✓Supplied and installed across the UK
Get a free project quote
Rating, written specification and budget range within one working day.
Confidential. No cost, no obligation.
Third-party tested
Evidence with every quote
UK manufactured
Made to your sizes
One accountable team
Specify, supply, install
Confidential handling
Details never shared
A cinema is a foyer, a set of screens and a warren of rooms behind them, and the doors between those parts decide what stays where it belongs. The foyer holds the audiences, the screens hold the crowds, and the rooms behind them hold the projectors, the takings and the stock, so each door takes its proof from the room behind it.
LPS 1175 sets the grade on a cinema door, and the category follows what sits behind the leaf. Issue 8.2, dated September 2024, sets the three categories at three, five and ten minutes, named B3, C5 and D10. The entrance takes the lowest of the three, the projection room takes the middle one, and the cash office takes the highest.
A cinema follows the same rules as any other public building, and the fire door regulations commercial buildings guide covers the shared parts, while the fire door regulations leisure centres guide covers the leisure rooms beside the screens. The cinema order names every door in the building, with the grade and the lock beside each one, so the door that arrives is the door the room needs.
- LPS 1175 B3 / C5 / D10Forced entry grades to Issue 8.2
- Projection roomsWhere the grade rises
- FD30 / FD60Fire periods to EN 1634-1
- One listEvery cinema door named
Screens, projection rooms and cash offices: one building, three grades
A cinema splits into three parts, and the grade follows what each part holds. The screens hold the audiences, the projection rooms hold the machines that show the films, and the cash office holds the money the day has taken, so each part takes the doors its work demands.
The entrance takes the doors the public walks through all day, and each leaf must open for an audience with tickets in hand and shut behind them on its own. The projection room takes the doors the public never sees, and each leaf must hold against the attack the machines behind it invite.
The schedule comes first: every opening in the cinema, the leaf it takes and the grade beside it. A leaf with no line on the schedule may turn up in the wrong room, guarding the wrong thing.
The entrance and the foyer: the leaves every audience passes
The entrance leaf works two ways at once: it opens for every member of the audience who arrives, and it holds an intruder out after closing. Its leaf, frame and lock are proved as one doorset, and the report names all three.
The entrance leaf takes a closer that pulls it shut after every audience member who passes, because a leaf left standing open is a door that guards nothing. The closer is set so the leaf comes home without a slam, and the pull is checked by opening the leaf and watching it shut on its own.
Glazing in the entrance leaf lets the staff see who stands outside before the leaf opens, and the pane carries the same proof as the leaf beside it. What the glass itself costs is covered in the fire rated glass cost guide, and the test report names the bead and the fixings that hold the pane.
The projection room: the door behind the screen
The projection room holds the machines that show the films, and the leaf that guards it takes the grade the value behind it demands. A projection room leaf takes C5, because the machines behind it are worth the minutes it takes to break through, and the leaf must hold until the alarm is answered.
The projection room takes a lock the projectionist controls, because the audience must never pass it alone. A leaf that guards the projection room takes C5, while the cash office beside it takes D10 and the entrance takes B3.
The projection room needs a leaf that shuts out the light as well as an intruder, because a shaft of light across the screen spoils the film. The leaf takes seals round its edges and a closer that brings it home after every projectionist who passes. The doors that guard a museum take the same care with their stores, as the museum security doors guide shows.
The cash office and the stock room: where the takings wait
No room in the cinema takes a higher grade than the cash office, because the takings sit behind its leaf. Its leaf, frame, fixings and lock are proved as one doorset, and the test report names each part, so the door that arrives is the door that was proved.
A cash office leaf takes D10, because it must hold longest, while the projection room beside it takes C5 and the entrance takes B3. Drawings drawn before Issue 8 call the same three categories SR2, SR3 and SR4, and the order carries the new name beside the old one.
The stock room beside the cash office takes the same care, because the goods the kiosks will need next sit behind its doors. A stock room leaf takes C5, and the lock on it takes the same key as the cash office, so the staff who work the stock room can open both without carrying two keys. What breaks a rating once a door is fitted is named in the keeping an LPS 1175 rating valid guide.
The way out for a full house: escape routes an audience can follow
The audiences in a cinema follow the route the building gives them, and the way out must be clear when the alarm sounds. Every door on the route opens with one push from whoever reaches it, because the leaf must open whatever the power is doing.
A smoke proof sits beside the fire proof on the route doors, to BS EN 1634-3, Sa where the smoke is at room temperature and S200 where it is at 200 degrees. Each seal must meet the frame all round, because smoke moves faster than flame and reaches the audience on the route before the fire does. How the doors hold smoke back while people move past them is set out in the smoke control doors guide.
Every leaf on one route takes the same period, because the shortest proof on the route sets how long the route holds. A leaf proved shorter than the leaves beside it is the leaf that fails first, so no leaf on the route takes less than the period the route needs. The doors that guard a hotel take the same care with their sleeping guests, as the hotel fire doors guide shows.
Sound and fire on the same leaf: acoustic doors that hold
A cinema leaf must hold sound back as well as fire, because the sound from one screen must not reach the next. The acoustic doors guide sets out how a leaf is proved for sound, and the leaf that guards a screen takes the rating the room beside it needs.
One leaf in a cinema can hold fire back and hold an intruder out, because the screen door needs both proofs on the same doorset. EN 1634-1 gives the fire proof in minutes and letters, E, EW and EI from 30 to 120, while LPS 1175 gives the forced entry proof in B3, C5 and D10. The two proofs are run on one leaf, frame and seals, so a single report holds both.
A leaf that swings free needs a 4 mm gap beside it, so the seal can close the opening when the leaf shuts. The intumescent seal swells when the heat nears 200 to 250 degrees, unless paint laid over it holds it down.
Locks, readers and the usher: who opens which door
The staff route through a cinema runs from the foyer through the screens to the projection room and back, and each leaf on the route opens for staff and stays shut for the public. A reader beside each leaf checks the fob against the list, and only the fobs the list names open the door. What the lock must do when the key turns is set out in the fire door hardware guide.
The usher holds the keys for the screens on the floor, and the leaf behind the counter opens for the staff who hold them. The door entry systems guide covers the readers, releases and wiring beside a leaf.
The order carries one answer beside each door: what that leaf does when the power fails. No leaf is left to guess on the night it matters, because the answer is written before the order goes out.
The cinema order: every leaf on one list
One list carries the whole cinema, a line for every door with the leaf, the grade, the lock and the closer beside it, so the door that arrives is the door the screens, the projection rooms and the cash office need. A list that names one leaf for the whole cinema leaves the fitter guessing which room takes which grade, and a leaf in the wrong room guards the wrong thing.
Every door in the cinema is costed from the same list the order is built from, with a figure beside each leaf, lock, closer and seal before the order goes out, so the entrance, the projection room and the cash office each carry their own number. The how to specify security doors guide names the columns that list must hold, and the security door cost factors guide works through what a higher grade adds to the price.
The manager tries the cinema doors through the week, a few leaves each day, so no door goes untried for long: the entrance at opening, the projection room before the first screening, and the cash office door at closing. A fault is noted at the door where it was found, with the leaf, the part and the date beside it, so the repair is booked before the next screening starts. The fire door inspection checklist sets out what a visit should look for, and the security door maintenance checklist covers the doors that must hold both fire and forced entry.
| Position | Door | Grade | What to check |
|---|---|---|---|
| Entrance | Glazed leaf | LPS 1175 B3 | Leaf, glass, closer |
| Screen | Fire leaf | FD30 | Leaf, bar, closer |
| Projection room | Steel leaf | LPS 1175 C5 | Leaf, lock, seals |
| Cash office | Steel leaf | LPS 1175 D10 | Leaf, lock, reader |
| Stock room | Steel leaf | LPS 1175 C5 | Leaf, lock, seals |
A cinema door holds only as long as the films behind it and the audience beside it, so the grade, the period and the lock must all sit on the same list.
What grade should a cinema door carry?
The grade follows the room behind the leaf: B3, C5 or D10 to LPS 1175, with the cash office taking a higher category than the entrance beside it.
Can one leaf hold fire and forced entry?
Yes, where the same doorset went through the fire test and the forced entry test together, so one report covers both jobs.
Do cinema doors need access control?
The doors behind the foyer take a reader beside the leaf, so the leaf opens for staff and stays shut for the public.
What period should a cinema door carry?
FD30 or FD60 to EN 1634-1, with the letters beside the number naming what the doorset held back. Which period the door takes depends on the room behind the leaf.
Who checks the cinema doors?
The manager walks the round that covers every door, and the record of each visit stays with the cinema file.
Get a free quote
Related
More in guides for specifiers
Products
One supplier for the whole building envelope
Ready to specify your project?
Free assessment, written specification and test evidence. Reply within one working day.