Fire Door Regulations for Hospitals Explained
Hospital fire doors under HTM 05-02: ward and escape route doors, FD30 and FD60, progressive horizontal evacuation and regular inspection duties.
- ✓Third-party test evidence with every product
- ✓Written specification you can issue to tender
- ✓Supplied and installed across the UK
Get a free project quote
Rating, written specification and budget range within one working day.
Confidential. No cost, no obligation.
Third-party tested
Evidence with every quote
UK manufactured
Made to your sizes
One accountable team
Specify, supply, install
Confidential handling
Details never shared
A hospital is the one building where the people inside cannot be relied on to leave it. Patients in beds, patients on drips, patients under anaesthetic and patients who need help to stand all depend on the building to protect them where they are. A fire door in a hospital has to hold a fire back long enough for staff to move those patients sideways, into the next compartment, and for the fire service to reach the fire. That is why the rules for hospital fire doors are not the same as the rules for an office or a school, even though the door itself looks much the same.
The starting point for a hospital is HTM 05-02, the Health Technical Memorandum on fire safety in the design of healthcare premises, part of the Firecode guidance published for the NHS. It is guidance, not law, and that distinction matters when a hospital is planned. The law is the Regulatory Reform (Fire Safety) Order 2005, which names a responsible person for the premises, and Approved Document B, which gives one way of meeting the building regulations for new and altered work. HTM 05-02 shows how those duties are met in a hospital, where the users are patients and the building never closes. Our fire door regulations for schools guide covers Building Bulletin 100 and the same Order from the school side, and our fire door regulations for commercial buildings guide covers the Order, the 2022 regulations and Approved Document B in full, from the commercial side.
The two periods a hospital meets most often are FD30 and FD60. They are fire resistance periods tested to EN 1634-1, and the number is the minutes the doorset held its rating in the furnace test. FD30 holds for 30 minutes and FD60 for 60 minutes. The letters in front of the number say what the door holds back: E for integrity, EW for integrity with a limit on radiated heat, and EI for integrity with insulation. A door marked FD30S also carries a smoke rating. Our fire ratings page sets out the three letters and the periods behind them.
- HTM 05-02NHS Firecode guidance on fire safety in the design of healthcare premises
- FD30 and FD60Fire resistance periods tested to EN 1634-1
- Progressive horizontal evacuationMoving patients sideways into an adjoining compartment
- Responsible personThe person the Fire Safety Order 2005 names for the premises
HTM 05-02: the guidance hospitals design to
HTM 05-02 is guidance from the Department of Health and Social Care for the NHS, and it sits inside Firecode, the set of documents that covers fire safety in healthcare premises. It deals with the design of hospitals, and it is the document designers and estates teams use when a hospital is built or changed. A designer who follows it has a clear route to a design the fire authority can accept, and a hospital that departs from it has to show another route that works as well.
The guidance matters most at the design stage, because that is when the fire lines of the building are drawn. Wards are divided into compartments and sub-compartments, stair cores and corridors are placed on the plan, and the doors in those walls are given their ratings. Once the building is up, changing a compartment line means changing walls and doors together, so a hospital that gets the design wrong pays for it twice: once in the build and once in the fix. An estates manager who inherits a hospital should ask for the fire strategy and the door schedule first, because those two documents say which door carries which rating and where it stands.
For an existing hospital, the fire risk assessment is the live document, and the Order puts the duty on the responsible person to keep the doors working after the builders have gone. HTM 05-02 shapes new and altered work, and the risk assessment judges the building as it stands, door by door.
Wards: doors that move patients sideways, not down stairs
A ward is a place where patients sleep, and many of them cannot walk. Progressive horizontal evacuation is the answer hospitals use: when a fire breaks out, staff move patients sideways, through the ward doors and the cross-corridor doors, into the adjoining compartment, rather than down the stairs first.
A ward door has to be wide enough for a bed, easy enough to open with a bed in front of it, and sure enough to close and latch behind the last patient. Vision panels matter more here than in most buildings, because staff need to see into the corridor before opening a door, and the corridor needs to see into the ward. A ward door that is held open for observation needs a hold-open device that releases when the alarm sounds, so the door can stand open when the ward needs it open and still close when it matters.
Some wards need more than a fire door. Mental health wards need doors that leave nothing to hold, with handles, locks and hinges shaped so they cannot be used as a ligature point, and vision panels that allow observation without opening the door. Our anti-ligature doors guide works through that doorset in full. The fire rating still applies on top: a ligature resistant door that does not close and latch has no fire performance, whatever its other qualities.
FD30 and FD60 in a hospital: where each period belongs
FD30 is the workhorse of a hospital. Ward doors, office doors, store doors and doors between departments commonly carry FD30, which means the doorset held its rating for 30 minutes in the test to EN 1634-1. Thirty minutes is enough for staff to move patients sideways into the next compartment and for the compartment to hold while the fire service arrives, provided the door closes and latches behind them.
FD60 belongs where the fire strategy asks for a longer hold. Compartment walls, sub-compartment walls, doors to stair cores and doors that protect a long escape route commonly carry FD60, because the people behind them need more time. Plant rooms, medical gas stores and pharmacy and drug stores commonly carry FD60 too, because the fire risk inside them is higher than in a ward, and the contents matter as much as the patients. Our hospital security doors page covers the security side of the same rooms, from wards and accident and emergency to pharmacy and plant rooms.
The letter matters as much as the number. An E door stops flames and hot gases passing through for the stated minutes, but the glass or the leaf on the safe side can still become hot. An EW door adds a limit on radiated heat, so a person can stand near it without being driven back. An EI door adds insulation, so the temperature rise on the safe side is limited and the door can be touched. Escape routes and corridors where patients pass close to the door usually need EI, because patients escape past the door and may need to put a hand on it. The letter follows the position of the opening, not the preference of the buyer.
Escape routes in a hospital: corridors, cross-corridor doors and stairs
Corridors in a hospital are escape routes and working routes at the same time. Beds, trolleys, porters and staff move along them all day, and the cross-corridor doors divide them into compartments. A cross-corridor door has to close and latch every time, because the corridor is the route every ward uses to move patients sideways, and a door that stands open breaks the compartment line at the very point it matters most. Pairs of doors need a coordinator so both leaves close in the right order, and meeting stile seals so the gap between them closes in a fire.
Stairs are for the people who can walk. A stair core door commonly carries FD60, because the stair must hold while wards on several floors move their patients sideways and then down. Panic hardware to BS EN 1125 belongs on escape doors where people leave under pressure: a bar across the leaf that opens the door when it is pushed, covering at least 60 percent of the leaf width.
Locked doors must release on alarm. A ward that is locked for security, a drug store that is locked for safety and a records room that is locked for privacy all need the same answer: the lock must release when the fire alarm sounds, so nobody is trapped behind a door they cannot open. Access control that fails safe is the rule, and the release must be tested at every inspection. Our dual certification guide works through how fire and security sit on one doorset.
Doors that must stay open, and doors that must stay shut
Ward doors often stand open. Staff need to see into the ward, patients need air, and beds need a clear path in and out. A ward door that must stand open needs a hold-open device to BS EN 1155 that releases the door when the alarm sounds. A wedge, a chair or a hook on the wall has no such release, and a door held open by one of those will stand open in a fire.
Other doors must stay shut. Store doors, plant room doors, riser cupboard doors and doors to medical gas stores are self-closing doors, and their job is to stay closed unless someone is passing through. The closer is the part that does it, sized to BS EN 1154 for the leaf, with a minimum of EN 3 on a fire door. Our fire door closers guide sets out the power sizes in BS EN 1154 and how to read them.
The conflict in a hospital is that the same building needs both kinds of door, sometimes on the same corridor. A ward door stands open for observation and a store door stays shut for safety, and the fire strategy must name which is which. Fit the right device for the door, test it, and write down that it was tested.
Hardware on a hospital door: closers, seals and the parts staff touch
The closer is the part that fails most often, and in a hospital it fails under the hardest use in any building. A closer sized to BS EN 1154 for the leaf weight will close the leaf and hold the latch every time, but a closer that has been adjusted by hand, a closer with a leaking body, or a closer taken off because it was too stiff, will leave the leaf standing open. A door that does not close has no fire performance, whatever its certificate says.
Opening force is a hospital problem as much as a fire problem. A door must open with less than 30 N in the first 30 degrees and less than 22.5 N beyond that, under BS 8300 and Approved Document M, because staff push beds and wheelchairs through these doors all day. A closer that is too strong for the leaf makes the door fail the access rules and invites staff to wedge it open. Hinges to BS EN 1935 carry the leaf, grade 13 or grade 14, and a hinge that has dropped lets the leaf sag, so the closer cannot close it squarely. Check the hinges before touching the closer.
Seals and gaps are the small parts that decide the rating. A 4 mm gap around the leaf is the usual limit, and a doorset fitted with wider gaps has lost the performance the certificate describes. Intumescent seals close the gap in a fire, expanding at roughly 200 to 250 degrees, and smoke seals close it against cold smoke. Both have to be fitted, intact and unpainted, or the compartment line is broken at the very point it matters most. Our fire door hardware guide sets out the hardware set, hinges, seals and latches included, and how each part is graded.
Inspection duties in a hospital: who checks, and what the record proves
The Regulatory Reform (Fire Safety) Order 2005 names a responsible person for the premises, and in a hospital that duty usually sits with the trust board or the chief executive, with the day to day work delegated to the estates and fire safety team. The responsible person does not have to check every door personally, but has to make sure the checks happen, the faults are fixed, and the records are kept.
Checks should be regular, and the regularity should be written down. The fire risk assessment sets what is checked and how often, and the checks should follow it rather than memory. A walk that looks at every fire door, checks that it closes and latches, looks at the seals and the gaps, tests the hold-open releases, and writes down what was found, is the core of it. Our fire door inspection checklist gives the checks that catch a failing leaf before it matters.
The record is the part hospitals most often neglect, because the building never closes and the work never stops. A notebook with dates, doors and faults is better than a memory, and a record that names the door, the fault, the date it was found and the date it was fixed is better still. When a door is replaced, the replacement must match the original build, the same rating, the same glass, the same hardware, with the same evidence behind it.
What the record should prove after a door is changed
A hospital door is changed more often than most doors, and every change needs a record. A closer swapped for a different model, a lock changed for one never tested in the leaf, or a leaf trimmed to fit a frame that moved all break the tested construction, and a change that is not in the evidence should not be made.
The record should name the exact doorset. The test report, the classification and the hardware schedule should name the leaf, the frame, the glass, the seals and the hardware as one doorset, and the fire classification should come from a test to EN 1634-1. A door marked FD30 carries 30 minutes of integrity, and a door marked FD30S carries 30 minutes of integrity plus smoke control, tested to BS EN 1634-3. The smoke evidence matters because a fire rating on its own does not prove smoke control.
The record should show the door still meets the guidance the hospital designs to. HTM 05-02 is the guidance hospitals design to, and the record for a changed door should show the fire period, the smoke control and the hardware that the guidance asks for on that opening. A door that was changed without fresh evidence has no proven rating, and a building that cannot show the evidence for a changed door cannot show that the door still does the job it was fitted for.
When a hospital door needs replacing, not repairing
A rating cannot be added after the doorset is fitted. Fitting stronger locks to an untested door does not make it a D10 doorset, because that combination was never attacked in a test, and a door that needs a rating must be replaced with a tested doorset.
A leaf that has been trimmed on site needs replacing, not repairing. A leaf trimmed to fit a frame that moved has lost the edge the seals press against, and no repair restores the tested construction. Our fire door inspection checklist gives the checks that catch a failing leaf before it matters.
A closer that cannot be set to hold the latch needs replacing, not adjusting. A closer to BS EN 1154 should bring the leaf back and hold the latch every time, and the minimum power size on a fire door is EN 3. A hold-open device to BS EN 1155 lets a door stand open for use and releases it when the alarm sounds, so test the release at every inspection. A door that does not close has no fire performance, whatever its certificate says. Our fire door closers guide sets out the power sizes in BS EN 1154.
Order the tested doorset, and file the evidence with the building records where the next responsible person will find it. The test report, the classification and the hardware schedule should travel with the doorset, and a building that can show its checks, its faults and its fixes has a maintenance system behind its doors. Our fire door hardware guide works through the parts staff touch every day, and our fire door regulations for schools guide covers the same duties on a school estate.
| Change made | Evidence needed | Who signs it off |
|---|---|---|
| Closer swapped | Fresh test evidence naming the closer | The specifier, with fresh evidence |
| Lock changed | Test evidence naming the lock in the leaf | The supplier, before any further work |
| Leaf trimmed on site | Replacement doorset with fresh test evidence | The specifier, before the door is refitted |
| No test evidence at handover | Refuse acceptance until the pack arrives | The responsible person |
Ordering hospital fire doors: one specification, one set of evidence
Ordering fire doors for a hospital is a specification exercise, not a shopping exercise. The order should name the rating in full, FD30 or FD60 with the letter and the smoke rating where the strategy asks for it, and it should name the leaf, the frame, the glass, the beads, the seals and the hardware as one doorset. Our how to specify security doors guide covers the same discipline for rated security doors, and our types of security doors guide sets out the range of doors a hospital may need.
Some hospital doors must do two jobs, fire and security together. A pharmacy door must hold fire and resist forced entry, and the two jobs need two sets of evidence on one assembly: a fire classification to EN 1634-1 and a forced entry rating to LPS 1175 or PAS 24. A steel leaf is strong, but strength is not a security rating, and a door rated FD60 can still fail a forced entry test. Our fire rated steel doors page covers the steel leaf that carries both jobs, and our fire rated sliding doors guide sets out the same discipline for a leaf on a track.
Finally, order the evidence with the doors. The test report, the classification and the hardware schedule should arrive with the doorset, and the handover pack should name the inspection routine the hospital will follow. A hospital that files the evidence on the day the doors arrive has a record it can use for the whole life of the building.
| Door position | Period | What it must do | What to check |
|---|---|---|---|
| Ward door | FD30 | Let beds pass, close and latch after every use | Closer strength, vision panel, latch |
| Cross-corridor door | FD30 or FD60 | Hold the corridor as a compartment line | Gaps, seals, hold-open release |
| Stair core door | FD60 | Protect the stair while patients move sideways | Smoke seals, closer, latch |
| Plant and medical gas store | FD60 | Hold a higher-risk fire inside its own compartment | Seals, gaps, self-closing |
| Pharmacy and drug store | FD60 | Protect controlled stock, hold fire and resist entry | Lock, seals, closer |
In a hospital, a fire door that cannot close is a door that cannot protect the patients behind it.
What is HTM 05-02?
HTM 05-02 is the Health Technical Memorandum on fire safety in the design of healthcare premises, part of the Firecode guidance published for the NHS. It shows how the duties in the Regulatory Reform (Fire Safety) Order 2005 and Approved Document B are met in a hospital, where the users are patients and the building never closes.
What is progressive horizontal evacuation?
Progressive horizontal evacuation is the way hospitals move patients in a fire: staff move patients sideways, through the ward doors and the cross-corridor doors, into the adjoining compartment, rather than down the stairs first. The compartment they move into must hold while staff work through the ward, bed by bed, so the ward doors and the cross-corridor doors have to close and latch behind them.
What is the difference between FD30 and FD60?
FD30 and FD60 are fire resistance periods tested to EN 1634-1, and the number is the minutes the doorset holds its rating in the furnace test. FD30 holds for 30 minutes and FD60 for 60 minutes. Ward doors commonly carry FD30, while compartment walls, stair cores, plant rooms and medical gas stores commonly carry FD60, because the people and the contents behind them need more time. The fire strategy names the period for each opening.
Can a ward fire door be held open?
Only with a hold-open device to BS EN 1155 that releases the door when the alarm sounds. A wedge, a chair or a hook on the wall has no such release, and a door held open by one of those will stand open in a fire. If a ward door needs to stand open for observation, fit the right hold-open device and the right closer, so the door can stay open when the ward needs it open and still close when it matters.
Who is responsible for fire doors in a hospital?
The Regulatory Reform (Fire Safety) Order 2005 names a responsible person for the premises, and in a hospital that duty usually sits with the trust board or the chief executive, with the day to day work delegated to the estates and fire safety team. The responsible person must make sure the doors are checked regularly, faults are fixed promptly, and the records are kept, including the test evidence for each doorset.
Pricing doors for a hospital site? The healthcare doors quote page lists what one enquiry needs, department by department and room by room.
Get a free quote
Related
More in guides for specifiers
Products
One supplier for the whole building envelope
Ready to specify your project?
Free assessment, written specification and test evidence. Reply within one working day.