Replacing Security Doors in an Occupied Building
Swapping a security door while people use the building needs a survey, a phased plan and written questions for the fitter. This guide sets out each step.
- ✓Third-party test evidence with every product
- ✓Written specification you can issue to tender
- ✓Supplied and installed across the UK
Get a free project quote
Rating, written specification and budget range within one working day.
Confidential. No cost, no obligation.
Third-party tested
Evidence with every quote
UK manufactured
Made to your sizes
One accountable team
Specify, supply, install
Confidential handling
Details never shared
A security door can be swapped while the building stays in use, but only when the work is planned round the people inside it. The opening is surveyed, the building is kept secure through the swap, and the work is phased entrance by entrance. This guide covers the survey, the phasing, and what to ask the fitter in writing.
- SurveyMeasure the opening first
- SecurityOne entrance stays shut
- PhasingEntrance by entrance
- PaperworkAsk in writing
Survey the opening before the leaf is ordered
Measure the opening before anything is ordered. Take the width and the height at three points each, check the opening is square, and note the floor level at the threshold. A rated frame is deeper and heavier than a standard one, so the opening that held the old door may not hold the new one without work.
Look at the wall the frame fixes into. The wall has to hold as well as the product it carries, so a cracked lintel or a fixing that has pulled out has to be put right before the new frame goes in. The specification guide covers the opening, the frame and the hardware as a single assembly.
Note what else lives in the opening. Cables, pipes, a closer arm, an access control reader, a fire alarm sounder: each one has to move, stay or be refitted, and each one takes time. The lead times guide dates the survey, the manufacture and the fitting, so the survey feeds the programme, not the other way round.
Keep the building secure through the swap
A building is at its weakest while a door is out of its frame. Plan the swap so the opening is never left unguarded: the old leaf comes out and the new frame goes in on the same visit, and where that is not possible, a cover and a member of staff stand in until it is.
Think about what sits behind the door. Stock, papers, plant and people all sit on the far side of the opening, and the swap has to be timed so the room is either empty or watched. A swap at a quiet hour is worth more than a fast swap in the middle of the working day.
Keys and codes need the same care. Change the codes and collect the keys for the old leaf before the new one goes in, and hand the new keys over only to the people named on the list. The forced entry guide covers the checks after an attack, and the same habit of writing each step down applies here.
Phase the work entrance by entrance
Split the job into stages, and close each stage before the next one opens. One entrance is rebuilt while the others stay protected, so the building is never open on two fronts at once. The programming guide puts the stages in order from survey to handover, and the replacement programme sits inside it.
Start with the entrance that matters least, and learn from it. The first swap shows how long the work takes, how the building copes, and what the fitter needs that the survey missed. The second swap goes faster, and the entrance that matters most goes last, when the crew has the measure of the job.
A housing block needs its own phasing. The fire door remediation guide phases the work through blocks for residents, and the same order works here: tell residents the date, the hours and the entrance affected, and keep one route in and out open at all times.
Fire, escape and access on the day
A door that holds fire has to hold fire on the day it is swapped too. The fire door guidance asks that a competent contractor carries out repair or replacement work promptly, and a replacement flat entrance door has to be fire-resisting, fitted by a competent person, with the technical information handed over.
Escape comes before security on the day. The leaf has to release from the escape side without a key, and a powered lock has to let go when the alarm sounds, when the power fails, or when the override is used. Check each release at the leaf, not at the drawing, before the fitter leaves.
Access has to work for everyone who uses the door. Through the first 30 degrees the force to open the leaf should stay under 30 N, and past that point it should stay under 22.5 N, with the threshold kept low. The access guide covers the force and width checks for a rated door.
The thermal limit the new leaf must meet
A replacement door is a controlled fitting, and Approved Document L sets the limit it must meet. Where the whole unit is replaced, the new unit has to be draught-proofed, it has to meet the limiting U-value in the table, and insulated cavity closers have to be fitted where they are appropriate.
For a pedestrian door, glazed or not, the limit is 1.6 W/(m²·K). A high-usage entrance door is allowed 3.0, and a vehicle access door 1.3, while a fire doorset on a building other than a dwelling is allowed 1.8. Both editions carry the same figures: Table 4.1 in the 2021 edition, Table 3.1 in the 2026 edition.
The limit applies to the complete doorset, not to the leaf by itself. Ask for the U-value of the doorset you are ordering, leaf, frame, glazing and seals together, and check it against the table before the order is placed. The thermal and weather guide gives the full table and the weather checks that sit beside it.
What to ask the fitter in writing
Put the questions in writing before the work starts, and keep the answers with the order. What is the rating of the doorset as supplied, and what certificate proves it? What fixing method will be used? What is the U-value of the doorset on the order, and what evidence proves it?
Ask about the day itself. Which entrance is swapped first, and which stays open? How long is the opening unguarded, and who stands it? What happens if the survey missed a cracked lintel or a service in the wall? The tender checklist guide sets out the questions a buyer should ask before the order is signed.
Ask about the paper that follows the work. When does the certificate arrive, when is the commissioning record signed, and when is the manual handed over? The installation handover guide lists the buyer’s checks opening by opening.
Hand the new door over with its papers
Do not sign for a door the papers do not support. The certificate has to name the rating tested and the opening it was tested in, the listing has to be live at order, and the fitting note has to show the tested fixing method was used. If any one of these is missing, hold the sign-off.
The new door joins the building’s record. The golden thread is the file the building keeps for its life, held digitally and open to the people who need it, and the new certificate, the commissioning note and the maintenance note go into it. The thermally broken doors guide covers the U-value and certificate a warm leaf should carry.
The first check after handover is the same as the last check before it. Push the leaf wide open and release it: it should close into its frame and latch on its own, and the gap round it should stay even. The flat entrance guide covers the doors that guard a home, and the same closing test applies to them.
| Step | What happens | What to check |
|---|---|---|
| Survey | Measure, square, wall, services | Opening fits the new frame |
| Guard | Cover and staff at the opening | Building never stands open |
| Phase | One entrance at a time | Other entrances stay protected |
| Swap | Old leaf out, new frame in | Fixing method as specified |
| Handover | Certificate, record, manual | Papers match the door |
A building stays secure through a swap only when one entrance is rebuilt at a time, and the opening is never left unguarded.
Can a security door be replaced while the building stays open?
Yes, when the work is split so one entrance is rebuilt at a time while the others stay protected, and the opening being worked on is guarded until the new frame is in.
What should the survey measure?
The width and height at three points each, whether the opening is square, the floor level at the threshold, the wall the frame fixes into, and every service that lives in the opening.
What U-value must the new door meet?
A pedestrian door, including a glazed door, must meet 1.6 W/(m²·K) under Approved Document L, and the fire doorset allowance is 1.8.
What should be asked of the fitter in writing?
The rating and its certificate, the fixing method and what the wall must hold, the U-value and its evidence, the phasing, and the date each paper arrives after the work.
When should the sign-off wait?
When the certificate does not name the rating and the opening, when the listing has lapsed, or when the fitting note does not show the tested fixing method was used.
Contact us for a free quote
Related
More in guides for specifiers
Products
One supplier for the whole building envelope
Ready to specify your project?
Free assessment, written specification and test evidence. Reply within one working day.