How to Write an Operational Requirement for Physical Security

An Operational Requirement turns a risk assessment into measures a site can buy. Learn the six steps, the five areas, and what each element must state.

  • ✓Third-party test evidence with every product
  • ✓Written specification you can issue to tender
  • ✓Supplied and installed across the UK
Prefer to talk?+44 7352 267239

Get a free project quote

Rating, written specification and budget range within one working day.

ArxBridge Quote Form

Confidential. No cost, no obligation.

Third-party tested

Evidence with every quote

UK manufactured

Made to your sizes

One accountable team

Specify, supply, install

Confidential handling

Details never shared

An Operational Requirement is the document that turns a risk assessment into a set of measures a site can buy. It states what the site must protect, what threatens it, and what the protection must achieve, before any product is named.

  • OR in one lineSecurity needs, stated from the risks faced
  • Six stepsTwo templates, from risk to measures
  • Five areasBeyond the perimeter to the asset
  • Two levelsOverall need, then detail per area

What an Operational Requirement is

NPSA describes an Operational Requirement, known as an OR, as a clear, considered and high level statement of an organisation’s security needs, based on the risks it faces. It is the document that sits between the risk assessment and the specification. The risk assessment says what could go wrong. The OR says what the site must do about it. The specification says which products will do it.

A well-defined OR increases the likelihood of success in any security project and reduces the risk of commissioning expensive nugatory work. That is NPSA’s own wording, and it explains why the OR comes first. NPSA has recommended the use of an OR process for many years, after observing projects where security requirements were poorly defined or developed in isolation. Where NPSA has been asked to assist in failing security projects, in almost all cases an OR process had not been followed, and in many cases a full risk assessment was also absent.

The involvement of key stakeholders in the OR process increases executive buy-in for the project, which simplifies any organisational change the measures require. An OR is therefore not a form to fill in at the end. It is the workshop where the site agrees what it needs, before anyone talks to a supplier.

Start with the risk assessment, not the product

The OR process follows on from a risk assessment process and leads to the application of effective and proportionate protective security measures. The OR uses a prioritised list of security risks to develop the measures. If the risk assessment is missing, the OR has nothing to work from, and the measures it produces will be guesses.

NPSA puts it bluntly in its fences and gates guidance: developing security measures outside of a structured process often leads to incomplete, inadequate or costly measures.

The threats an OR must consider include criminality, hostile state actors, terrorism and unlawful protest. The perimeter guidance lists what those threats are used for: to deter hostile reconnaissance and attack, to support the detection of intruders, to frustrate and delay entry, and to assist the response to a security incident. A threat that is not named in the OR will not be answered by the specification.

Need this specified for your project?Free rating, written specification and budget range within one working day.
Get a free quote

Split the site into five areas

The first step of the NPSA OR process is to split the site up, defining the geographical areas for consideration. NPSA recommends five generic areas, which fit most sites: Beyond the Perimeter, Perimeter, Within the Site, Building, and Asset. Each area is considered in turn, and the risks are mapped to the areas they touch.

This matters because a threat does not stop at the fence. A vehicle threat starts beyond the perimeter, where approach speed is set. It meets the perimeter, where a barrier must stop or delay it. It continues within the site, where stand-off distance decides how much blast reaches the building. It ends at the building and the asset, where doors, glazing and walls must hold. An OR that looks only at the front door will miss the approach.

NPSA provides principles for each area, and the specifier records the risks that apply to each. The data centre physical security guide works through the same idea zone by zone, and the NPSA forced entry and blast guidance shows how a threat assessment leads to a performance requirement for each element.

The six steps, in order

NPSA sets out six recommended steps in the OR process, completed over two templates. The steps run in order, and each one feeds the next.

Step What you do What it produces
1. Split the site Define the geographical areas for consideration Five areas, from beyond the perimeter to the asset
2. Define the risks Map the risks to the areas they touch A prioritised risk list, tied to places
3. Develop recommendations Identify protective measures for each risk A suite of measures to address the risks
4. Assess the measures Judge each measure by likelihood of success Measures ranked by how well they work
5. Map back to risks Check whether the risks are mitigated Residual risk, and whether it is acceptable
6. Implement Put the measures in place, and plan next steps Measures installed, with a record of decisions

Step five is the one most often skipped. Mapping the measures back to the risks asks whether the risks have been mitigated, and whether the residual risk is acceptable. A measure that looks strong on its own may leave a risk untouched, and only the mapping shows it. Record as much detail as possible during the process; NPSA provides blank templates for the two stages.

The OR works in two levels. The Level 1 OR gives the overall statement of the security need. The Level 2 OR gives the detail for each area of concern, with its own vulnerabilities, functions and performance requirements. A Level 2 OR can be used to investigate existing and proposed measures, and to highlight vulnerabilities that need attention.

Threat, asset, standard, performance

Every element in an OR must state four things: the threat it answers, the asset it protects, the standard it must meet, and the performance it must achieve.

The threat is the attack the measure must defeat: a forced entry attempt with hand tools, a marauding attacker with a blade, a vehicle used as a weapon, or a bomb at a given stand-off. The asset is what is being protected: people, a trading system, a control room, or the building itself. The standard is the test the product must pass, such as LPS 1175 Issue 8.2 for forced entry, or ISO 22343-1 for a vehicle barrier. The performance is the level within that standard, such as a rating grade or a delay time.

The NPSA Catalogue of Security Equipment guide explains how a listing proves the standard and the rating together, and the comparison of LPS 1175 and EN 1627 shows why the two scales cannot be read as one. Our comparison of Secured by Design, NPSA and LPCB sets out which body fits a brief that names more than one.

Who signs off, and what they accept

An OR is signed off by the risk owner, with the stakeholders who will live with the measures. NPSA’s temporary barriers note states the rule plainly: it is the risk owner’s responsibility to sign off a scheme, and they should only do so after they have been made aware of the risk, been taken through potential mitigations, and made an informed decision that leaves them with a level of residual risk they are comfortable with.

That sign-off is the point of the whole process. The OR records what was decided, what was accepted, and what residual risk remains. If the threat changes, or the site changes, the OR is the document that shows what was agreed and why. The Martyn’s Law enhanced tier guide covers the same discipline for venues, where the duty holder must be able to show what was done and why.

A requirement that names a product before it names the threat is a shopping list. Name the threat first, and the product follows.

Sign-off should also cover who operates the measures. A barrier that no one knows how to move, a door that no one can open quickly, or a system that no one maintains will fail in use, whatever its rating. The HVM project cycle runs design, build, operate, and the operate stage decides whether a scheme succeeds or fails.

From the requirement to the specification

Once the OR is signed off, the specification is drawn up from it. It should include all the critical design elements required, but leave the responsibility for a final working design with the contractor. The OR states what must be achieved; the contractor states how.

The specification should name the standard and the rating for each element, and the evidence to be supplied. For a barrier, it means the impact rating and the delay rating, and the tested configuration they apply to. For a doorset, it means the standard, the rating, and the listing or certificate behind it. The ISO 22343 guide breaks a rating code into its parts, and our hostile vehicle mitigation page sets out the barrier types and the codes they carry.

Finally, the OR is a living document. When the threat changes, when the site is extended, or when a measure is replaced, the OR should be revisited. A specification written from an out-of-date OR will answer yesterday’s threat. The due diligence guide for vehicle security barriers shows the same discipline applied to buying, and the forced entry, ballistic and blast rating guide shows how the threat decides which rating a site needs.

What is an Operational Requirement?

It is a high level statement of what a site needs for its security, written from the risks the site faces. It comes after the risk assessment and before the specification.

Who should write the OR?

The security manager, working with the risk owner and the stakeholders who use the site. NPSA provides step by step guidance and worked examples so a security manager can run the workshop.

What is the difference between a Level 1 and a Level 2 OR?

Level 1 states the overall security need for the site. Level 2 gives the detail for one area of concern, with its vulnerabilities, the function of each measure, and the performance each measure must achieve.

Does every site need an OR?

Any site that is buying protective security measures benefits from one. NPSA recommends the OR process for any security project, and notes that failing projects almost always skipped it.

When should an OR be reviewed?

When the threat changes, when the site changes, or when a measure is swapped out. The OR is the record of what was decided and why, so it should stay current with the site.

Writing an Operational Requirement for a project?Send the site, the threats and the assets.
Contact us for a free quote

Related

More in guides for specifiers

10 mistakes when specifying certified security doors 10 steps to specify an LPS 1175 door Acceptance and Snagging of a Security Door or Barrier Job Access Control Doors Acoustic Doors: Ratings and Specification After a Forced Entry Attempt: Checking a Security Door Airport Security Doors Anti-Ligature Doors for Mental Health Wards Anti-Ram Bollards Anti-ram gates and barriers: protecting vehicle entrances Arcade Security Doors Explained Automatic Doors Automatic Gates Cost Factors Automatic Vehicle Barriers Ballistic Panels Bank Security Doors Bingo Hall Security Doors Explained Blast doors: glazed vs solid and how they are rated Blast protection window film: what it does and what it cannot do Blast resistant windows: what drives the cost and how to specify them Bollard Cost Factors Explained Bollard regulations in the UK: spacing, height and depth Bookmaker Security Doors Explained Builders Merchant Security Doors Bullet Resistant Glass Cost Factors Bullet resistant glass ratings explained: BR1 to BR7 and SG classes Bullet resistant vs bulletproof glass: what the difference means Buying Security Doors and HVM Through Public Frameworks Car Park Security Doors Explained Car Showroom Security Doors Casino Security Doors Explained CDM 2015 Duties When Security Doors, Shutters or HVM Are Installed Cinema Security Doors Cleanroom Doors Cold Store Doors College Security Doors Commissioning, Handover and the O&M Manual for Security Doors and HVM Communal entrance doors for flats: Secured by Design and what to specify Community Centre Security Doors Control Room Doors Court Security Doors Crash Rated Fences and HVM Fencing Explained Data centre physical security: doors, glazing, HVM and shielding by zone Dental Practice Security Doors Depot Security Doors Explained Door Entry Systems Due Diligence When Selecting Vehicle Security Barriers Emergency Exit Doors EMP Shielding Cost Factors Explained Exhibition Centre Fire Door Rules Exhibition Centre Security Doors Factory Security Doors Faraday cage vs RF shielded room: what a business needs FB4 vs FB6 vs FB7: how to choose a ballistic rating Fire and security doors: how dual certification works Fire Compartmentation Fire Curtains Fire Door Certification Fire Door Closers Explained Fire Door Cost Factors Fire Door Duties of the Accountable Person Fire Door Gaps Fire Door Hardware Explained Fire door inspection checklist for steel and timber doors Fire Door Maintenance Fire Door Regulations Care Homes Fire Door Regulations for A and E Departments Fire Door Regulations for Airports Explained Fire Door Regulations for Bowls Clubs Fire door regulations for commercial buildings in the UK Fire Door Regulations for Dialysis Centres Fire Door Regulations for Hockey Clubs Fire Door Regulations for Hospitals Explained Fire Door Regulations for Offices Explained Fire Door Regulations for Operating Theatres Fire Door Regulations for Retail Explained Fire Door Regulations for Schools Explained Fire Door Regulations for Snooker Clubs Fire Door Regulations for Stadiums Fire Door Regulations for Student Accommodation Fire Door Regulations for Warehouses Fire Door Regulations Leisure Centres Fire Door Regulations Restaurants Fire Door Remediation Programme for Housing Providers Fire Door Rules for Badminton Clubs Fire Door Rules for Bingo Halls Fire Door Rules for Bookmakers Fire Door Rules for Bowling Alleys Fire Door Rules for Car Parks Fire Door Rules for Car Showrooms Fire Door Rules for Cinemas Fire Door Rules for Climbing Centres Fire Door Rules for Colleges Fire Door Rules for Community Centres Fire Door Rules for Cricket Clubs Fire Door Rules for Dental Practices Fire Door Rules for Depots Explained Fire Door Rules for Golf Clubs Fire Door Rules for GP Surgeries Fire Door Rules for Gyms Explained Fire Door Rules for Ice Rinks Fire Door Rules for Maternity Units Fire Door Rules for Mental Health Units Fire Door Rules for Museums Fire Door Rules for Oncology Units Fire Door Rules for Opticians Fire Door Rules for Pawnbrokers Fire Door Rules for Petrol Stations Fire Door Rules for Pharmacies Fire Door Rules for Ports Fire Door Rules for Post Offices Fire Door Rules for Prisons Fire Door Rules for Rehabilitation Centres Fire Door Rules for Self Storage Fire Door Rules for Shopping Centres Fire Door Rules for Squash Clubs Fire Door Rules for Supermarkets Fire Door Rules for Swimming Pools Fire Door Rules for Tennis Clubs Fire Door Rules for Theatres Fire Door Rules for UK Arcades Fire Door Rules for UK Casinos Fire Door Rules for UK Hospices Fire Door Rules for Walk-in Centres Fire Door Signage Fire Door Vision Panels Fire Doors and Gateway 2 in Higher-Risk Buildings Fire Rated Glass Cost Explained Fire Rated Sliding Doors Explained Fire Rated Windows Cost Factors Fire Rated Windows Explained Fire Safety Enforcement Notices and Fire Doors: What the Responsible Person Must Do Flat Entrance Doors: PAS 24 and Fire Rated Forced Entry vs Ballistic vs Blast: Which Rating a Site Needs Garage Security Doors Explained Gate Automation Explained Golden Thread Records for Fire Doors GP Surgery Security Doors Explained Gym Security Doors Explained High Speed Doors HMO Fire Doors Hospice Security Doors Explained Hospital Security Doors: Wards, A&E, Plant Hospital Security Gates Hotel Fire Doors Hotel Security Doors How to choose HVM bollards: fixed, shallow mount, removable and automatic How to keep an LPS 1175 door rating valid after installation How to Specify Fire Doors in a Housing Tender How to specify security doors: a checklist for architects How to Verify a Secured by Design Listing How to Verify an LPS 1175 Certificate on Red Book Live HVM planters and street furniture: protection that blends in In-Service Care of Vehicle Security Barriers Installation Handover: LPS 1175 Doors and PAS 68 Barriers Intumescent Seals ISO 16933 explained: EXV and SB classes and hazard ratings ISO 22343 vehicle security barriers explained Keeping a Dual-Certified Fire and Security Door Valid in Service Laboratory Security Doors Layered Security for a Site: Deter, Detect, Delay, Mitigate, Respond Lead Times and Programme Risks for LPS 1175 Doors Leisure Centre Security Doors Library Security Doors Listed Building Fire Doors Loading Bay Doors Explained Lockdown and Access Control Hardware on an LPS 1175 Door LPS 1175 Gates and Grilles Explained LPS 1175 Issue 8 explained: from SR1 to SR8 to A1 to H20 LPS 1175 Roller Shutters LPS 1175 vs ASTM F2781 and Other US Ratings Explained LPS 1175 vs EN 1627: how UK and European burglar resistance ratings compare LPS 1175 vs PAS 24: which security standard does your door need? LPS 1175 Windows and Walling Explained Martyn’s Law and Places of Worship: What a Buyer Checks for Doors and Entry Control Martyn’s Law Enhanced Tier: Physical Measures and the Specifier Brief Martyn’s Law Standard Tier: Procedures, Doors and Shutters Martyn’s Law Timeline and the SIA Regulator Martyn’s Law: what premises must do and which physical measures to consider Master Key Systems MRI and RF shielded rooms: how they work and what to specify Museum Security Doors NPSA Catalogue of Security Equipment (CSE) Explained NPSA Forced Entry and Blast Guidance for Government Sites NPSA Guidance on Lockdown and Marauding Attack: What It Asks of Doors and Entrances Office Security Doors Optician Security Doors Explained Panic Hardware PAS 24 requirements for doors and windows explained PAS 68 Bollard Foundations Explained PAS 68 bollards: ratings, spacing and cost factors PAS 68 vs IWA 14 vs ISO 22343: hostile vehicle mitigation standards explained Pawnbroker Security Doors Explained Pedestrian Gates Petrol Station Security Doors Pharmacy Security Doors Planning Permission for Security Shutters, Gates and Bollards on Commercial Premises Plant room doors: fire, security and ventilation requirements Plant Room Fire Doors Port Security Doors Post Office Security Doors Explained Powder coating vs galvanising vs paint for steel Preliminary Market Engagement for Security Doors and HVM Prison Security Doors Programming a Security Door and Barrier Package on a Live Site Public-Sector Tender Response Checklist for Security Door and HVM Supply Reading a PAS 24 and SBD Door Test Report Regulation 38 Fire Safety Information at Handover for Fire-Rated Security Doorsets Replacing Security Doors in an Occupied Building Restaurant Security Doors Retail Security Doors Revolving Doors RF shielding standards and how shielded rooms are tested Rising Bollard Cost Factors Road Blocker Cost Factors Explained Road Blockers Explained Roller Shutter Cost Factors: What Drives the Price Roller shutter regulations in the UK: safety and maintenance Safe room and panic room doors: specification basics Safety Duties for Powered Doors, Gates and Barriers on Commercial Sites School Security Doors Sectional Doors Secured by Design explained: is it mandatory for doors? Secured by Design vs NPSA vs LPCB: Which One You Need Security Door Locks Security Door Maintenance Checklist Security Doors and Access for Everyone: What Approved Document M Asks Security Doors for A and E Departments Security Doors for Badminton Clubs Security Doors for Bowling Alleys Security Doors for Bowls Clubs Security Doors for Climbing Centres Security Doors for Cricket Clubs Security Doors for Dialysis Centres Security Doors for Golf Clubs Security Doors for Hockey Clubs Security Doors for Ice Rinks Security Doors for Maternity Units Security Doors for Mental Health Units Security Doors for Oncology Units Security Doors for Operating Theatres Security Doors for Rehabilitation Centres Security Doors for Snooker Clubs Security Doors for Squash Clubs Security Doors for Swimming Pools Security Doors for Tennis Clubs Security Doors for Walk-in Centres Security Doors West Midlands Explained Security Fencing Security Gates Cost Factors Explained Security shutters vs high performance roller doors Security shutters vs retractable grilles: which suits retail and commercial openings? Security Turnstiles Explained Security Window Film Security Windows for Schools Explained Self Storage Security Doors Server Room Doors Explained Shopping Centre Security Doors Smoke Control Doors Explained Smoke Curtains Specification Mistakes When Mixing LPS 1175, PAS 24 and SBD in One Tender SR2 vs SR3 vs SR4 security doors: choosing the right LPS 1175 level Stadium Security Doors Steel Door Frames Steel vs aluminium security doors: strength, ratings and looks Steel vs timber fire doors: which suits your building? Student Accommodation Security Doors Substation doors: security, ventilation and specification Supermarket Security Doors Telescopic Bollards Tender Evaluation Criteria and Scoring for Security Doors and HVM The Scope of a Maintenance Contract for Security Doors and Barriers Theatre Security Doors Thermal and Weather Performance of External Security Doorsets Thermally broken steel security doors: U-values and certification Traffic Calming as Hostile Vehicle Mitigation Transport hub security requirements Turnstile Cost Factors Explained Turnstile vs speed gate vs security portal: choosing entrance control Types of security doors for commercial buildings University Security Doors Explained Vehicle Dynamics Assessment: What It Tells the Buyer Before a Barrier Is Specified Warehouse Security Doors Explained Warehouse Security Gates Warranty, Defects Liability and Guarantees for Security Doors and Barriers What affects the cost of a bullet resistant door What affects the cost of a high-security door in the UK Window Security Bars View all →

Products

One supplier for the whole building envelope

Ready to specify your project?

Free assessment, written specification and test evidence. Reply within one working day.