A dialysis centre runs regular patient sessions beside treatment rooms and a drug store, so each leaf takes the LPS 1175 grade its room needs.

  • ✓Third-party test evidence with every product
  • ✓Written specification you can issue to tender
  • ✓Supplied and installed across the UK
Prefer to talk?+44 7352 267239

Get a free project quote

Rating, written specification and budget range within one working day.

ArxBridge Quote Form

Confidential. No cost, no obligation.

Third-party tested

Evidence with every quote

UK manufactured

Made to your sizes

One accountable team

Specify, supply, install

Confidential handling

Details never shared

The entrance leaf of a dialysis centre carries B3 to LPS 1175 Issue 8.2, and the waiting area, the treatment rooms and the staff office carry the same grade, while the water treatment plant room, the drug store and the plant room carry C5.

September 2024 brought Issue 8.2 of LPS 1175, and under that issue a leaf is graded by the minutes it resists attack, with B3 holding for three minutes, C5 holding for five minutes and D10 holding for ten minutes, while the older names SR2, SR3 and SR4 line up with B3, C5 and D10 in that order.

A dialysis centre holds treatment rooms where patients sit beside machines, a water treatment plant room that makes purified water for those machines, a waiting area where the next session gathers, and a staff office where patient records are kept, and the same patient cohorts return for session after session, so access runs on the session list rather than on walk in arrivals.

  • B3 / C5Grades to LPS 1175 Issue 8.2
  • Session listsRegular patient cohorts attend sessions
  • Staff officeWhere patient records and keys are kept
  • Water plant roomWhere purified water is made for treatment

Seven leaves round a dialysis unit: the grade each leaf carries

Seven leaves guard a dialysis centre, and each leaf takes the grade that fits the room behind it, with B3 on the entrance, the waiting area, the treatment rooms and the staff office, and C5 on the water treatment plant room, the drug store and the plant room.

The four leaves that patients and staff pass through the day hold for three minutes at B3, and the three leaves that guard purified water, medicines or plant hold for five minutes at C5.

Room Grade Period
Entrance B3 FD30
Waiting area B3 FD30
Treatment rooms B3 FD30
Staff office B3 FD30
Water treatment plant room C5 FD60
Drug store C5 FD60
Plant room C5 FD60

Fire minutes and forced entry minutes can be proved on one leaf in a single report, so the order carries both results for the same doorset, and the dual doorset guide covers how a leaf is tested for fire and for forced entry without a second report.

Entrance leaf where patients arrive for a session

Patients arrive for a dialysis session in small groups through the morning and again through the afternoon, often by car or by taxi, and the entrance leaf holds B3 for three minutes while the desk keeps watch over the way in.

A session change brings one cohort out and the next cohort in through the same entrance, so the leaf must let patients through, hold against a stranger and shut behind each group, even when a wheelchair or a walking frame tries to hold it open. The automatic leaf guide covers leaves that open without a push when both hands are busy with a bag or a frame.

The desk at the entrance works from the session list, so a patient whose name sits on the list for that session passes through, while a visitor with no session waits at the desk until staff fetch the patient or confirm the visit. That list keeps the entrance leaf from standing open through the day, because the desk knows who is due and when, and the leaf shuts behind each named arrival.

The front of the unit needs the same care as the leaf itself, because a vehicle that reaches the entrance reaches the patients who wait there for a session, and ProtectUK sets the clear gap between bollards at no more than 1,200 mm, with a height of no less than 500 mm. The bollard guide covers the posts that stand at the front of the unit.

Need this specified for your project?Free rating, written specification and budget range within one working day.
Get a free quote

Waiting area leaf where patients sit before treatment

The waiting area holds the chairs where patients sit before a session starts, and its leaf takes B3, because the room fills before each session and the leaf guards it again once the room empties and the patients have moved through to treatment.

Patients wait in the waiting area with coats and bags beside them, and the leaf on the way in must move fast for people who arrive in a group at the start of a session. A push bar must cover no less than 60 percent of the leaf width on any leaf that serves more than 60 people, under BS EN 1125.

A dialysis waiting area is not a hospital ward, because the patients who sit there leave the same day after a session, and a hospital asks more of its leaves across a whole building. The hospital door guide covers a building where wards stay full round the clock, while the GP surgery door guide covers a building where patients arrive without a session list.

Treatment room leaves where dialysis runs through the session

Treatment rooms hold the chairs and the machines where dialysis runs, and the leaves round those rooms take B3 and hold for three minutes, because the machines and the chairs stay in place through the session and the leaf guards them between sessions.

Staff push trolleys and wheeled chairs through the treatment room leaves through the day, so a leaf must move under a light hand even when it carries B3. Under BS 8300 and Approved Document M the force to open it stays below 30 N through the first 30 degrees and below 22.5 N past that point.

Between sessions the treatment rooms stand empty with the machines switched off, and the leaves round them stay locked until staff open them for the next cohort. A leaf left open between sessions would let a stranger reach a machine unnoticed, so the lock is turned each time the room empties and the key stays with the nurse on duty.

A treatment room leaf opens many times in a session, as staff come and go beside the machines, so the lock has to work fast for gloved hands and still hold for three minutes when the room stands empty. Under TS 007 a 1 star cylinder paired with a 2 star handle gives a 3 star set, and the lock guide shows the cylinder and the handle working as one set.

Staff office leaf where patient records and keys are kept

Patient records and the keys for every other leaf live in the staff office, which is why that leaf holds B3 for three minutes and stays shut from the first session of the morning until the unit closes.

The senior nurse and the unit manager carry the key that opens every leaf in the unit, while treatment room keys open treatment rooms only, and no other key in the building opens the staff office, the drug store or the water treatment plant room. The master key guide shows how those keys sit together on one suite.

No published table joins the LPS 1175 grades to the ASTM ratings, so the two sets stay apart and the order states the LPS 1175 grade by itself, while the ASTM comparison guide covers how the two rating sets differ.

The staff office door stays shut as sessions turn over through the day

The staff office in a dialysis centre holds the patient records and the keys, and its door carries B3 to LPS 1175 Issue 8, a three minute hold against attack. The door stays shut between sessions, and it opens only when a nurse steps in to fetch a record or a key, then it is shut again behind them. The key is held by few hands, and the room stands shut through the treatment hours, so a stranger who reaches the office door meets a locked door and records that stay beyond reach.

The lock is turned at the end of the day and the key stays in the nurse’s hand, and the door is tried then to prove it holds. Under TS 007 a one star cylinder with a two star handle makes a three star set, proved as a pair, so the fitted lock is the one the report names. The lock guide lists the locks for a staff office door, with the proof each one carries.

Nurses pass the office door beside the machines through every session, and the hinges carry that daily work. BS EN 1935 proves a grade 13 hinge for 200,000 cycles under 120 kg and a grade 14 hinge for the same count under 160 kg, so the hinge is picked for the weight it carries. The effort cap in Approved Document M with BS 8300 is 30 N through the first 30 degrees of swing and 22.5 N for the rest, and it holds even with a B3 grade on the door. The hinges are oiled on the same round, so a stiff swing is found before the next session starts. The steel frame guide sets out the frame for a heavy door, with the lock set into it.

Who Key End of day try
Senior nurse Opens the whole unit Office door tried and locked
Unit manager Opens the whole unit Record cupboard shut and locked
Staff nurse Opens office and treatment rooms Key returned at handover
Engineer Opens plant room only Key returned at sign off

The key stays with the nurse in charge and not with the room

One key opens the office, the treatment rooms and the drug store for the senior nurse, and the unit manager carries its match. A treatment room key opens treatment rooms and nothing more, so on its own it opens little. The master key guide sets out the suite that puts every door on one set of keys.

A grade is lost the moment door, frame or hardware moves from the state it was proved in, and each room gets its checks written against that room, door, lock and closer together. The maintenance checklist gives the checks for each door, lock and closer together, and the rating guide shows where a fitted door stops matching the state it was proved in.

The unit list is sent to the quote page with the staff office first, grade and closer beside each room, so the records that sit behind a shut door stay behind it after the last session of the day ends.

Water treatment plant room leaf where purified water is made

Purified water for the dialysis machines is made in the water treatment plant room, and its leaf holds C5 for five minutes, because the kit inside feeds every treatment room and the leaf is the only guard on it.

Only a small group of key holders ever opens the water treatment plant room, and the leaf stays shut between their visits, so a fault comes to light on a routine visit by a key holder rather than through a stranger who wanders in. The plant room guide covers what that leaf must do, while the steel frame guide covers the frame that carries the leaf and its lock together.

Clean water and clean air matter beside the machines, and the room that makes the water sits apart from the treatment rooms for that reason. The cleanroom door guide covers leaves where dust and damp must stay out of the room behind them.

If the plant room leaf gives way, the water the unit needs stops with it

The water that feeds every dialysis machine is made in one room, and its leaf is graded C5, a five minute hold to LPS 1175 Issue 8. Engineers come to the room on a schedule, and the key sits with a small group, so the room opens at set times and is shut and locked behind them. A stranger who reaches the plant room leaf finds it shut, and the water behind it stays beyond reach.

Through a session the treatment room leaf stays shut, and it opens when the chairs empty. The machines and the chairs stay where they are through the session, and the leaf guards them between sessions with a B3 grade, three minutes to LPS 1175 Issue 8. The push stays low even with that grade: Approved Document M with BS 8300 caps the effort at 30 N over the first 30 degrees of swing, then 22.5 N for the rest. The plant room guide names the duties of a leaf on a room like this one.

When a session ends the rooms stand empty with the machines off, and their leaves stay shut and locked until the next cohort is called. An open leaf between sessions leaves the machines unguarded, so the lock is turned as the last nurse leaves and the key stays in the nurse’s hand. The lock guide names the locks that sit on a treatment room leaf and the proof each one carries.

Leaf Grade Who opens it
Water plant room C5, five minutes Engineers on a schedule
Treatment rooms B3, three minutes Staff at session change
Drug store C5, five minutes Senior nurse only
Staff office B3, three minutes Senior nurse, unit manager

The treatment room leaf through a session: a shut leaf until the chairs empty

Staff come and go beside the machines all through a session, so the leaf is opened many times a day and its hinges take the work. Grade 13 hinges under BS EN 1935 are proved for 200,000 cycles with a leaf of 120 kg, while grade 14 hinges take a leaf of 160 kg for the same count, so the hinge is chosen for the weight it carries. The steel frame guide names the frame that carries a heavy leaf and the lock set into it.

The senior nurse holds the key that opens the whole building, and the unit manager holds one too. Treatment room keys open treatment rooms and nothing more, so a treatment room key on its own is of little use to a stranger. The master key guide explains the suite that puts every leaf on one set of keys.

A grade is lost the moment leaf, frame or hardware moves away from the state it was tested in, and the checks for each room are written against that room, leaf, lock and closer together. The maintenance checklist lists the checks to run on a leaf, its lock and its closer, and the healthcare doors quote page is where the unit list goes, grade and closer beside each room.

Drug store leaf where medicines are kept under lock

Medicines for the sessions are kept in the drug store, and its leaf holds C5 for five minutes, because the stock inside is counted and checked and the leaf guards it from the first session until the unit closes.

Staff fetch medicines from the drug store at set points in the session, and the leaf shuts behind them each time, so the room is open for minutes at a time and shut for the rest of the day. An oncology unit keeps a drug store on the same pattern, and the oncology unit door guide covers a building where day case treatment runs beside a drug store.

The senior nurse holds the drug store key with the staff office key, and no treatment room key opens the drug store, so a key taken from a treatment room opens nothing beyond the treatment rooms. The dental practice door guide covers a smaller healthcare building where medicines sit behind a shut leaf.

Plant room leaf and the order: grade, lock and closer on one line

Pumps, heaters and boards that warm the unit and light the treatment rooms sit in the plant room, and its leaf holds C5 for five minutes, because the kit inside keeps the whole unit running and the leaf is the only guard on it.

The unit is busy all week, so the keys and the cards have to fit the people who hold them. One key in the senior nurse hand opens every leaf in the building, while treatment room keys open treatment rooms only, and the master key guide shows how those keys sit together on one suite.

Every leaf in the unit goes on one list for the order, with a line per leaf naming its room, grade, lock and closer, and each line is read back against its own room before the order is signed. The ten steps guide shows how that list takes shape, the LPS 1175 guide sets out the grades behind it, and the specifying guide treats the leaf, the frame and the hardware as one doorset.

A grade stays in force only while the leaf, the frame and the hardware stay as they were tested, and the rating guide covers what keeps an LPS 1175 result valid, while the maintenance checklist covers the routine checks on each leaf, its lock and its closer.

Put the room, the grade, the lock and the closer for every leaf on one list, then read each line back against its room before the order is sent.

What grade should a dialysis centre entrance door carry?

B3 to LPS 1175 Issue 8.2, a three minute hold, because patients arrive for sessions in small groups and the desk watches the leaf from the first session to the last.

What grade should a dialysis centre treatment room door carry?

B3 to LPS 1175 Issue 8.2, because the treatment room leaf guards the chairs and the machines where dialysis runs through the session.

What grade should a dialysis centre drug store door carry?

C5 to LPS 1175 Issue 8.2, a five minute hold, because the medicines for the sessions are counted and checked behind that leaf.

Can a dialysis centre leaf hold a fire period and a security grade?

Yes, a dialysis centre leaf can be proved for fire and for forced entry together, and the two results stand side by side in one report.

Who holds the keys in a dialysis centre?

The senior nurse and the unit manager hold the key that opens every leaf, while treatment room keys open treatment rooms only.

Specifying security doors for a dialysis centre?Send the room list with the grade each leaf must hold, and ask for a tested door quotation.
Get a free quote

Related

More in guides for specifiers

10 mistakes when specifying certified security doors 10 steps to specify an LPS 1175 door Acceptance and Snagging of a Security Door or Barrier Job Access Control Doors Acoustic Doors: Ratings and Specification After a Forced Entry Attempt: Checking a Security Door Airport Security Doors Anti-Ligature Doors for Mental Health Wards Anti-Ram Bollards Anti-ram gates and barriers: protecting vehicle entrances Arcade Security Doors Explained Automatic Doors Automatic Gates Cost Factors Automatic Vehicle Barriers Ballistic Panels Bank Security Doors Bingo Hall Security Doors Explained Blast doors: glazed vs solid and how they are rated Blast protection window film: what it does and what it cannot do Blast resistant windows: what drives the cost and how to specify them Bollard Cost Factors Explained Bollard regulations in the UK: spacing, height and depth Bookmaker Security Doors Explained Builders Merchant Security Doors Bullet Resistant Glass Cost Factors Bullet resistant glass ratings explained: BR1 to BR7 and SG classes Bullet resistant vs bulletproof glass: what the difference means Buying Security Doors and HVM Through Public Frameworks Car Park Security Doors Explained Car Showroom Security Doors Casino Security Doors Explained CDM 2015 Duties When Security Doors, Shutters or HVM Are Installed Cinema Security Doors Cleanroom Doors Cold Store Doors College Security Doors Commissioning, Handover and the O&M Manual for Security Doors and HVM Communal entrance doors for flats: Secured by Design and what to specify Community Centre Security Doors Control Room Doors Court Security Doors Crash Rated Fences and HVM Fencing Explained Data centre physical security: doors, glazing, HVM and shielding by zone Dental Practice Security Doors Depot Security Doors Explained Door Entry Systems Due Diligence When Selecting Vehicle Security Barriers Emergency Exit Doors EMP Shielding Cost Factors Explained Exhibition Centre Fire Door Rules Exhibition Centre Security Doors Factory Security Doors Faraday cage vs RF shielded room: what a business needs FB4 vs FB6 vs FB7: how to choose a ballistic rating Fire and security doors: how dual certification works Fire Compartmentation Fire Curtains Fire Door Certification Fire Door Closers Explained Fire Door Cost Factors Fire Door Duties of the Accountable Person Fire Door Gaps Fire Door Hardware Explained Fire door inspection checklist for steel and timber doors Fire Door Maintenance Fire Door Regulations Care Homes Fire Door Regulations for A and E Departments Fire Door Regulations for Airports Explained Fire Door Regulations for Bowls Clubs Fire door regulations for commercial buildings in the UK Fire Door Regulations for Dialysis Centres Fire Door Regulations for Hockey Clubs Fire Door Regulations for Hospitals Explained Fire Door Regulations for Offices Explained Fire Door Regulations for Operating Theatres Fire Door Regulations for Retail Explained Fire Door Regulations for Schools Explained Fire Door Regulations for Snooker Clubs Fire Door Regulations for Stadiums Fire Door Regulations for Student Accommodation Fire Door Regulations for Warehouses Fire Door Regulations Leisure Centres Fire Door Regulations Restaurants Fire Door Remediation Programme for Housing Providers Fire Door Rules for Badminton Clubs Fire Door Rules for Bingo Halls Fire Door Rules for Bookmakers Fire Door Rules for Bowling Alleys Fire Door Rules for Car Parks Fire Door Rules for Car Showrooms Fire Door Rules for Cinemas Fire Door Rules for Climbing Centres Fire Door Rules for Colleges Fire Door Rules for Community Centres Fire Door Rules for Cricket Clubs Fire Door Rules for Dental Practices Fire Door Rules for Depots Explained Fire Door Rules for Golf Clubs Fire Door Rules for GP Surgeries Fire Door Rules for Gyms Explained Fire Door Rules for Ice Rinks Fire Door Rules for Maternity Units Fire Door Rules for Mental Health Units Fire Door Rules for Museums Fire Door Rules for Oncology Units Fire Door Rules for Opticians Fire Door Rules for Pawnbrokers Fire Door Rules for Petrol Stations Fire Door Rules for Pharmacies Fire Door Rules for Ports Fire Door Rules for Post Offices Fire Door Rules for Prisons Fire Door Rules for Rehabilitation Centres Fire Door Rules for Self Storage Fire Door Rules for Shopping Centres Fire Door Rules for Squash Clubs Fire Door Rules for Supermarkets Fire Door Rules for Swimming Pools Fire Door Rules for Tennis Clubs Fire Door Rules for Theatres Fire Door Rules for UK Arcades Fire Door Rules for UK Casinos Fire Door Rules for UK Hospices Fire Door Rules for Walk-in Centres Fire Door Signage Fire Door Vision Panels Fire Doors and Gateway 2 in Higher-Risk Buildings Fire Rated Glass Cost Explained Fire Rated Sliding Doors Explained Fire Rated Windows Cost Factors Fire Rated Windows Explained Fire Safety Enforcement Notices and Fire Doors: What the Responsible Person Must Do Flat Entrance Doors: PAS 24 and Fire Rated Forced Entry vs Ballistic vs Blast: Which Rating a Site Needs Garage Security Doors Explained Gate Automation Explained Golden Thread Records for Fire Doors GP Surgery Security Doors Explained Gym Security Doors Explained High Speed Doors HMO Fire Doors Hospice Security Doors Explained Hospital Security Doors: Wards, A&E, Plant Hospital Security Gates Hotel Fire Doors Hotel Security Doors How to choose HVM bollards: fixed, shallow mount, removable and automatic How to keep an LPS 1175 door rating valid after installation How to Specify Fire Doors in a Housing Tender How to specify security doors: a checklist for architects How to Verify a Secured by Design Listing How to Verify an LPS 1175 Certificate on Red Book Live How to Write an Operational Requirement for Physical Security HVM planters and street furniture: protection that blends in In-Service Care of Vehicle Security Barriers Installation Handover: LPS 1175 Doors and PAS 68 Barriers Intumescent Seals ISO 16933 explained: EXV and SB classes and hazard ratings ISO 22343 vehicle security barriers explained Keeping a Dual-Certified Fire and Security Door Valid in Service Laboratory Security Doors Layered Security for a Site: Deter, Detect, Delay, Mitigate, Respond Lead Times and Programme Risks for LPS 1175 Doors Leisure Centre Security Doors Library Security Doors Listed Building Fire Doors Loading Bay Doors Explained Lockdown and Access Control Hardware on an LPS 1175 Door LPS 1175 Gates and Grilles Explained LPS 1175 Issue 8 explained: from SR1 to SR8 to A1 to H20 LPS 1175 Roller Shutters LPS 1175 vs ASTM F2781 and Other US Ratings Explained LPS 1175 vs EN 1627: how UK and European burglar resistance ratings compare LPS 1175 vs PAS 24: which security standard does your door need? LPS 1175 Windows and Walling Explained Martyn’s Law and Places of Worship: What a Buyer Checks for Doors and Entry Control Martyn’s Law Enhanced Tier: Physical Measures and the Specifier Brief Martyn’s Law Standard Tier: Procedures, Doors and Shutters Martyn’s Law Timeline and the SIA Regulator Martyn’s Law: what premises must do and which physical measures to consider Master Key Systems MRI and RF shielded rooms: how they work and what to specify Museum Security Doors NPSA Catalogue of Security Equipment (CSE) Explained NPSA Forced Entry and Blast Guidance for Government Sites NPSA Guidance on Lockdown and Marauding Attack: What It Asks of Doors and Entrances Office Security Doors Optician Security Doors Explained Panic Hardware PAS 24 requirements for doors and windows explained PAS 68 Bollard Foundations Explained PAS 68 bollards: ratings, spacing and cost factors PAS 68 vs IWA 14 vs ISO 22343: hostile vehicle mitigation standards explained Pawnbroker Security Doors Explained Pedestrian Gates Petrol Station Security Doors Pharmacy Security Doors Planning Permission for Security Shutters, Gates and Bollards on Commercial Premises Plant room doors: fire, security and ventilation requirements Plant Room Fire Doors Port Security Doors Post Office Security Doors Explained Powder coating vs galvanising vs paint for steel Preliminary Market Engagement for Security Doors and HVM Prison Security Doors Programming a Security Door and Barrier Package on a Live Site Public-Sector Tender Response Checklist for Security Door and HVM Supply Reading a PAS 24 and SBD Door Test Report Regulation 38 Fire Safety Information at Handover for Fire-Rated Security Doorsets Replacing Security Doors in an Occupied Building Restaurant Security Doors Retail Security Doors Revolving Doors RF shielding standards and how shielded rooms are tested Rising Bollard Cost Factors Road Blocker Cost Factors Explained Road Blockers Explained Roller Shutter Cost Factors: What Drives the Price Roller shutter regulations in the UK: safety and maintenance Safe room and panic room doors: specification basics Safety Duties for Powered Doors, Gates and Barriers on Commercial Sites School Security Doors Sectional Doors Secured by Design explained: is it mandatory for doors? Secured by Design vs NPSA vs LPCB: Which One You Need Security Door Locks Security Door Maintenance Checklist Security Doors and Access for Everyone: What Approved Document M Asks Security Doors for A and E Departments Security Doors for Badminton Clubs Security Doors for Bowling Alleys Security Doors for Bowls Clubs Security Doors for Climbing Centres Security Doors for Cricket Clubs Security Doors for Golf Clubs Security Doors for Hockey Clubs Security Doors for Ice Rinks Security Doors for Maternity Units Security Doors for Mental Health Units Security Doors for Oncology Units Security Doors for Operating Theatres Security Doors for Rehabilitation Centres Security Doors for Snooker Clubs Security Doors for Squash Clubs Security Doors for Swimming Pools Security Doors for Tennis Clubs Security Doors for Walk-in Centres Security Doors West Midlands Explained Security Fencing Security Gates Cost Factors Explained Security shutters vs high performance roller doors Security shutters vs retractable grilles: which suits retail and commercial openings? Security Turnstiles Explained Security Window Film Security Windows for Schools Explained Self Storage Security Doors Server Room Doors Explained Shopping Centre Security Doors Smoke Control Doors Explained Smoke Curtains Specification Mistakes When Mixing LPS 1175, PAS 24 and SBD in One Tender SR2 vs SR3 vs SR4 security doors: choosing the right LPS 1175 level Stadium Security Doors Steel Door Frames Steel vs aluminium security doors: strength, ratings and looks Steel vs timber fire doors: which suits your building? Student Accommodation Security Doors Substation doors: security, ventilation and specification Supermarket Security Doors Telescopic Bollards Tender Evaluation Criteria and Scoring for Security Doors and HVM The Scope of a Maintenance Contract for Security Doors and Barriers Theatre Security Doors Thermal and Weather Performance of External Security Doorsets Thermally broken steel security doors: U-values and certification Traffic Calming as Hostile Vehicle Mitigation Transport hub security requirements Turnstile Cost Factors Explained Turnstile vs speed gate vs security portal: choosing entrance control Types of security doors for commercial buildings University Security Doors Explained Vehicle Dynamics Assessment: What It Tells the Buyer Before a Barrier Is Specified Warehouse Security Doors Explained Warehouse Security Gates Warranty, Defects Liability and Guarantees for Security Doors and Barriers What affects the cost of a bullet resistant door What affects the cost of a high-security door in the UK Window Security Bars View all →

Products

One supplier for the whole building envelope

Ready to specify your project?

Free assessment, written specification and test evidence. Reply within one working day.