Fire Door Rules for Opticians

An opticians holds consulting rooms, records and frames behind its leaves, so each door takes the fire period the room behind it demands, FD30 or FD60.

  • ✓Third-party test evidence with every product
  • ✓Written specification you can issue to tender
  • ✓Supplied and installed across the UK
Prefer to talk?+44 7352 267239

Get a free project quote

Rating, written specification and budget range within one working day.

ArxBridge Quote Form

Confidential. No cost, no obligation.

Third-party tested

Evidence with every quote

UK manufactured

Made to your sizes

One accountable team

Specify, supply, install

Confidential handling

Details never shared

An opticians is a waiting area, a set of consulting rooms and a records room behind one entrance, and the fire rules for the building follow the rooms behind each leaf. The consulting rooms hold the sight tests, the records room holds the patient files, and the frames store holds the stock the shop sells.

Fire doors in an opticians are proved to EN 1634-1, and the period names how long the leaf holds fire back. A leaf proved to FD30 holds fire back for thirty minutes, a leaf proved to FD60 holds for sixty, and the letter beside the minutes says what was held: E for flames alone, EW for flames with some heat held back, and EI for flames with the heat held back as well.

An opticians follows the same rules as any other high street practice. The fire door regulations dental practices guide covers the fire rules for a dental practice, which holds patients in consulting rooms the same way an opticians does, and the fire door regulations offices guide covers the rooms of an office, which an opticians keeps behind its shop front.

  • FD30 / FD60Fire periods to EN 1634-1
  • Consulting roomsWhere the period rises
  • Sa / S200Smoke ratings to BS EN 1634-3
  • One listEvery opticians door named

Consulting rooms, records and frames: six rooms, six leaves

Six parts make up an opticians, and the period follows what each part holds. The waiting area holds the patients who wait for their appointment, the consulting rooms hold the sight tests, the records room holds the patient files, the frames store holds the stock, the back office holds the paperwork, and the plant room keeps the building running.

The consulting rooms take FD60, the records room takes FD60, the frames store takes FD60, the back office takes FD60, and the plant room takes FD60, because the people and the paper and the stock behind those leaves need the longest hold the building asks for. The leaves on the public route take FD30, because the route behind them is short and the people on it move fast.

The order is written from a list that names every opening, the leaf it takes and the period beside it, because a leaf with no line on the list may turn up in the wrong consulting room, and a leaf in the wrong room holds fire for the wrong length of time. The fire door regulations commercial buildings guide covers the parts the buildings share.

What FD30 and FD60 hold back in an opticians

The period on a door is a count of minutes, and EN 1634-1 is the test that counts them. A leaf proved to FD30 holds fire back for thirty minutes, a leaf proved to FD60 holds for sixty, and the leaf, the frame, the fixings and the lock are proved together as one doorset, with the report naming the period it holds.

Where an opticians leaf must hold fire as well as forced entry, the two proofs are taken on the same doorset and sit in one report. The minutes and the letters come from EN 1634-1, and the grade in B3, C5 and D10 comes from LPS 1175 Issue 8.2 of September 2024. How the pair is proved on one doorset is shown in the fire and security doors dual certification guide.

Drawings made before Issue 8 use the old names SR2, SR3 and SR4 for the same three forced entry categories, so the order writes the old name next to the new one, and the fitter who reads the drawing sees both. What breaks a rating once a door is fitted is named in the keeping an LPS 1175 rating valid guide.

Need this specified for your project?Free rating, written specification and budget range within one working day.
Get a free quote

Consulting room leaves: sight tests behind a shut leaf

Behind every consulting room leaf sits a patient who cannot get up and leave in the middle of a sight test, so the leaf takes FD60, because the patient behind it needs the minutes it takes to finish the test and leave in order, and the leaf must hold until the last person is out.

A consulting room leaf shuts on its own after every person through it, because a leaf left standing open holds nothing back. The closer is set so the leaf comes home without a slam, and the pull is checked by opening the leaf and seeing it shut on its own.

A consulting room leaf can carry a glazed panel so the corridor sees whether the room is in use, and the pane is proved with the leaf round it rather than alone. The test report names the glass, the bead and the fixings together, because a pane that falls from its beads holds nothing back. The fire rated glass cost guide sets out what the pane adds to the figure.

The records room and the frames store: paper and stock behind FD60

The records room holds the patient files, and its leaf takes FD60, because the files behind it cannot be replaced once the fire reaches them. The records room sits away from the waiting area, and its leaf stays shut whenever the last member of staff leaves the room, so the files sit behind a shut leaf through the working day.

The frames store holds the frames the shop sells, and its leaf takes FD60, because the stock behind it is the stock the shop runs on, and a fire that reaches the store takes the frames the patients came to choose. The frames store leaf takes the same key as the back office, so one key opens both doors for the staff who work there.

The records room and the frames store sit behind the same corridor, so their leaves take the same period, and the order names the period beside each door so the fitter does not swap them.

Waiting area leaves: the public route takes FD30

The waiting area is the room that fills first and empties last, so its leaves take FD30, because the people on the route move fast and the route behind them is short. The alarm sends patients who have never used the building towards the way out, so the route is signed at every turn and kept clear of chairs, tables and displays.

Where the route serves a crowd, the leaves on the way out take a bar proved to BS EN 1125, and the bar runs across at least 60 percent of the leaf width, so a person who reaches the leaf in a crowd can open it with one push. The panic hardware guide names what the bar must do, and the emergency exit doors guide covers the leaves on the way out in full.

Smoke gets to the people on the route before the flame does, so the route doors carry a smoke rating beside their period. The two ratings are named in BS EN 1634-3: Sa for smoke at room temperature and S200 for smoke at 200 degrees. The smoke control doors guide works through how the doors on a route keep the smoke back while the patients move past them.

The back office and the plant room: staff rooms behind FD60

The back office holds the paperwork and the keys, and its leaf takes FD60, because the paper behind it cannot be replaced once the fire reaches it. The back office leaf stands shut through the working day, and it must hold against the fire the records behind it invite.

Behind the plant room leaf sit the boards and the plant that keep the building running, so the leaf takes FD60 and is checked with the rest of the building on the round. The plant room fire doors guide covers the leaves of a plant room in full.

Where the back office leaf stands open through the working day, the device that holds it open must be proved to BS EN 1155, so it releases the leaf on its own when the alarm sounds. A leaf propped open with a chair or a wedge has no period at all while it stands open.

Position Leaf Period What to check
Consulting rooms Steel leaf FD60 Leaf, lock, seals
Records room Steel leaf FD60 Leaf, lock, seals
Frames store Steel leaf FD60 Leaf, lock, seals
Back office Steel leaf FD60 Leaf, lock, seals
Plant room Steel leaf FD60 Leaf, lock, seals
Waiting area Glazed leaf FD30 Leaf, glass, closer

Hinges, closers and seals: the parts that keep the period

Once the leaf is hung a 4 mm gap runs round it, and the gauge on the monthly walk measures the gap against the last visit, because a gap that has grown points to a hinge or a frame that has shifted. The seal in the groove swells when the heat reaches 200 to 250 degrees and closes the gap, unless paint over the seal stops it swelling, so the seal is checked as well as the gap.

A fire door closer takes at least EN 3, the smallest power size the rules allow on a fire door, and the leaf must shut on its own from any angle it is opened to. BS EN 1935 grades the hinges that carry the leaf through every open and shut: grade 13 for 200,000 cycles at 120 kg, and grade 14 for 200,000 cycles at 160 kg. The fire door hardware guide sets out what the hardware must do, and the fire door closers guide covers the closers in full.

A leaf on the public route must open with a force below 30 N for the first 30 degrees and below 22.5 N beyond them, to BS 8300 and Approved Document M. Each fire door carries signs that say what the leaf is and which way it opens, and the fire door signage guide sets out what each sign must say. The gaps round the leaf are covered in the fire door gaps guide.

The opticians order: every leaf, its period and its proof

One list carries the whole opticians order, with a line for every opening that names the leaf, the period, the lock and the closer beside it. A list that names one leaf for the whole building leaves the fitter to guess which room takes which period.

The figures for the order are agreed leaf by leaf before anything is signed, because a closer ordered after the doorset arrives costs more than one ordered with it, and a leaf with no figure beside it still appears on the invoice. The how to specify security doors guide lists what the schedule must hold for every door.

The practice manager walks the building once a month with the door list in hand, and tries a few leaves on each walk, so every leaf is tried before the month is out. The entrance leaf is tried at opening, the consulting room leaves before the first patient, and the records room leaf at closing. The notes from each walk stay with the practice file, and the fire door inspection checklist names what the walk should cover.

An opticians fire door holds only as long as the consulting rooms behind it and the waiting area beside it, so the period, the smoke rating and the closer must all sit on the same list.

What period should an opticians fire door carry?

FD60 for the consulting rooms, the records room, the frames store, the back office and the plant room, and FD30 for the leaves on the public route, each proved to EN 1634-1.

Can one leaf hold fire and forced entry?

Yes, when a single doorset passed the fire test and the forced entry test together, so both proofs sit in the same report.

Do opticians fire doors need a smoke rating?

Yes, beside the period the route leaves carry Sa or S200 to BS EN 1634-3, because the smoke gets to the people on the route ahead of the flame.

Who checks the opticians fire doors?

The practice manager tries a few leaves on each monthly walk with the door list, so every leaf is tried in turn.

What happens when a fire door will not shut?

The fault is noted against its door on the day it is found, and the repair is booked while it is still small.

Specifying fire doors for an opticians?Send the door list and the period each room must hold for a tested door quotation.
Get a free quote

Related

More in guides for specifiers

10 mistakes when specifying certified security doors 10 steps to specify an LPS 1175 door Acceptance and Snagging of a Security Door or Barrier Job Access Control Doors Acoustic Doors: Ratings and Specification After a Forced Entry Attempt: Checking a Security Door Airport Security Doors Anti-Ligature Doors for Mental Health Wards Anti-Ram Bollards Anti-ram gates and barriers: protecting vehicle entrances Arcade Security Doors Explained Automatic Doors Automatic Gates Cost Factors Automatic Vehicle Barriers Ballistic Panels Bank Security Doors Bingo Hall Security Doors Explained Blast doors: glazed vs solid and how they are rated Blast protection window film: what it does and what it cannot do Blast resistant windows: what drives the cost and how to specify them Bollard Cost Factors Explained Bollard regulations in the UK: spacing, height and depth Bookmaker Security Doors Explained Builders Merchant Security Doors Bullet Resistant Glass Cost Factors Bullet resistant glass ratings explained: BR1 to BR7 and SG classes Bullet resistant vs bulletproof glass: what the difference means Buying Security Doors and HVM Through Public Frameworks Car Park Security Doors Explained Car Showroom Security Doors Casino Security Doors Explained CDM 2015 Duties When Security Doors, Shutters or HVM Are Installed Cinema Security Doors Cleanroom Doors Cold Store Doors College Security Doors Commissioning, Handover and the O&M Manual for Security Doors and HVM Communal entrance doors for flats: Secured by Design and what to specify Community Centre Security Doors Control Room Doors Court Security Doors Crash Rated Fences and HVM Fencing Explained Data centre physical security: doors, glazing, HVM and shielding by zone Dental Practice Security Doors Depot Security Doors Explained Door Entry Systems Due Diligence When Selecting Vehicle Security Barriers Emergency Exit Doors EMP Shielding Cost Factors Explained Exhibition Centre Fire Door Rules Exhibition Centre Security Doors Factory Security Doors Faraday cage vs RF shielded room: what a business needs FB4 vs FB6 vs FB7: how to choose a ballistic rating Fire and security doors: how dual certification works Fire Compartmentation Fire Curtains Fire Door Certification Fire Door Closers Explained Fire Door Cost Factors Fire Door Duties of the Accountable Person Fire Door Gaps Fire Door Hardware Explained Fire door inspection checklist for steel and timber doors Fire Door Maintenance Fire Door Regulations Care Homes Fire Door Regulations for A and E Departments Fire Door Regulations for Airports Explained Fire Door Regulations for Bowls Clubs Fire door regulations for commercial buildings in the UK Fire Door Regulations for Dialysis Centres Fire Door Regulations for Hockey Clubs Fire Door Regulations for Hospitals Explained Fire Door Regulations for Offices Explained Fire Door Regulations for Operating Theatres Fire Door Regulations for Retail Explained Fire Door Regulations for Schools Explained Fire Door Regulations for Snooker Clubs Fire Door Regulations for Stadiums Fire Door Regulations for Student Accommodation Fire Door Regulations for Warehouses Fire Door Regulations Leisure Centres Fire Door Regulations Restaurants Fire Door Remediation Programme for Housing Providers Fire Door Rules for Badminton Clubs Fire Door Rules for Bingo Halls Fire Door Rules for Bookmakers Fire Door Rules for Bowling Alleys Fire Door Rules for Car Parks Fire Door Rules for Car Showrooms Fire Door Rules for Cinemas Fire Door Rules for Climbing Centres Fire Door Rules for Colleges Fire Door Rules for Community Centres Fire Door Rules for Cricket Clubs Fire Door Rules for Dental Practices Fire Door Rules for Depots Explained Fire Door Rules for Golf Clubs Fire Door Rules for GP Surgeries Fire Door Rules for Gyms Explained Fire Door Rules for Ice Rinks Fire Door Rules for Maternity Units Fire Door Rules for Mental Health Units Fire Door Rules for Museums Fire Door Rules for Oncology Units Fire Door Rules for Pawnbrokers Fire Door Rules for Petrol Stations Fire Door Rules for Pharmacies Fire Door Rules for Ports Fire Door Rules for Post Offices Fire Door Rules for Prisons Fire Door Rules for Rehabilitation Centres Fire Door Rules for Self Storage Fire Door Rules for Shopping Centres Fire Door Rules for Squash Clubs Fire Door Rules for Supermarkets Fire Door Rules for Swimming Pools Fire Door Rules for Tennis Clubs Fire Door Rules for Theatres Fire Door Rules for UK Arcades Fire Door Rules for UK Casinos Fire Door Rules for UK Hospices Fire Door Rules for Walk-in Centres Fire Door Signage Fire Door Vision Panels Fire Doors and Gateway 2 in Higher-Risk Buildings Fire Rated Glass Cost Explained Fire Rated Sliding Doors Explained Fire Rated Windows Cost Factors Fire Rated Windows Explained Fire Safety Enforcement Notices and Fire Doors: What the Responsible Person Must Do Flat Entrance Doors: PAS 24 and Fire Rated Forced Entry vs Ballistic vs Blast: Which Rating a Site Needs Garage Security Doors Explained Gate Automation Explained Golden Thread Records for Fire Doors GP Surgery Security Doors Explained Gym Security Doors Explained High Speed Doors HMO Fire Doors Hospice Security Doors Explained Hospital Security Doors: Wards, A&E, Plant Hospital Security Gates Hotel Fire Doors Hotel Security Doors How to choose HVM bollards: fixed, shallow mount, removable and automatic How to keep an LPS 1175 door rating valid after installation How to Specify Fire Doors in a Housing Tender How to specify security doors: a checklist for architects How to Verify a Secured by Design Listing How to Verify an LPS 1175 Certificate on Red Book Live How to Write an Operational Requirement for Physical Security HVM planters and street furniture: protection that blends in In-Service Care of Vehicle Security Barriers Installation Handover: LPS 1175 Doors and PAS 68 Barriers Intumescent Seals ISO 16933 explained: EXV and SB classes and hazard ratings ISO 22343 vehicle security barriers explained Keeping a Dual-Certified Fire and Security Door Valid in Service Laboratory Security Doors Layered Security for a Site: Deter, Detect, Delay, Mitigate, Respond Lead Times and Programme Risks for LPS 1175 Doors Leisure Centre Security Doors Library Security Doors Listed Building Fire Doors Loading Bay Doors Explained Lockdown and Access Control Hardware on an LPS 1175 Door LPS 1175 Gates and Grilles Explained LPS 1175 Issue 8 explained: from SR1 to SR8 to A1 to H20 LPS 1175 Roller Shutters LPS 1175 vs ASTM F2781 and Other US Ratings Explained LPS 1175 vs EN 1627: how UK and European burglar resistance ratings compare LPS 1175 vs PAS 24: which security standard does your door need? LPS 1175 Windows and Walling Explained Martyn’s Law and Places of Worship: What a Buyer Checks for Doors and Entry Control Martyn’s Law Enhanced Tier: Physical Measures and the Specifier Brief Martyn’s Law Standard Tier: Procedures, Doors and Shutters Martyn’s Law Timeline and the SIA Regulator Martyn’s Law: what premises must do and which physical measures to consider Master Key Systems MRI and RF shielded rooms: how they work and what to specify Museum Security Doors NPSA Catalogue of Security Equipment (CSE) Explained NPSA Forced Entry and Blast Guidance for Government Sites NPSA Guidance on Lockdown and Marauding Attack: What It Asks of Doors and Entrances Office Security Doors Optician Security Doors Explained Panic Hardware PAS 24 requirements for doors and windows explained PAS 68 Bollard Foundations Explained PAS 68 bollards: ratings, spacing and cost factors PAS 68 vs IWA 14 vs ISO 22343: hostile vehicle mitigation standards explained Pawnbroker Security Doors Explained Pedestrian Gates Petrol Station Security Doors Pharmacy Security Doors Planning Permission for Security Shutters, Gates and Bollards on Commercial Premises Plant room doors: fire, security and ventilation requirements Plant Room Fire Doors Port Security Doors Post Office Security Doors Explained Powder coating vs galvanising vs paint for steel Preliminary Market Engagement for Security Doors and HVM Prison Security Doors Programming a Security Door and Barrier Package on a Live Site Public-Sector Tender Response Checklist for Security Door and HVM Supply Reading a PAS 24 and SBD Door Test Report Regulation 38 Fire Safety Information at Handover for Fire-Rated Security Doorsets Replacing Security Doors in an Occupied Building Restaurant Security Doors Retail Security Doors Revolving Doors RF shielding standards and how shielded rooms are tested Rising Bollard Cost Factors Road Blocker Cost Factors Explained Road Blockers Explained Roller Shutter Cost Factors: What Drives the Price Roller shutter regulations in the UK: safety and maintenance Safe room and panic room doors: specification basics Safety Duties for Powered Doors, Gates and Barriers on Commercial Sites School Security Doors Sectional Doors Secured by Design explained: is it mandatory for doors? Secured by Design vs NPSA vs LPCB: Which One You Need Security Door Locks Security Door Maintenance Checklist Security Doors and Access for Everyone: What Approved Document M Asks Security Doors for A and E Departments Security Doors for Badminton Clubs Security Doors for Bowling Alleys Security Doors for Bowls Clubs Security Doors for Climbing Centres Security Doors for Cricket Clubs Security Doors for Dialysis Centres Security Doors for Golf Clubs Security Doors for Hockey Clubs Security Doors for Ice Rinks Security Doors for Maternity Units Security Doors for Mental Health Units Security Doors for Oncology Units Security Doors for Operating Theatres Security Doors for Rehabilitation Centres Security Doors for Snooker Clubs Security Doors for Squash Clubs Security Doors for Swimming Pools Security Doors for Tennis Clubs Security Doors for Walk-in Centres Security Doors West Midlands Explained Security Fencing Security Gates Cost Factors Explained Security shutters vs high performance roller doors Security shutters vs retractable grilles: which suits retail and commercial openings? Security Turnstiles Explained Security Window Film Security Windows for Schools Explained Self Storage Security Doors Server Room Doors Explained Shopping Centre Security Doors Smoke Control Doors Explained Smoke Curtains Specification Mistakes When Mixing LPS 1175, PAS 24 and SBD in One Tender SR2 vs SR3 vs SR4 security doors: choosing the right LPS 1175 level Stadium Security Doors Steel Door Frames Steel vs aluminium security doors: strength, ratings and looks Steel vs timber fire doors: which suits your building? Student Accommodation Security Doors Substation doors: security, ventilation and specification Supermarket Security Doors Telescopic Bollards Tender Evaluation Criteria and Scoring for Security Doors and HVM The Scope of a Maintenance Contract for Security Doors and Barriers Theatre Security Doors Thermal and Weather Performance of External Security Doorsets Thermally broken steel security doors: U-values and certification Traffic Calming as Hostile Vehicle Mitigation Transport hub security requirements Turnstile Cost Factors Explained Turnstile vs speed gate vs security portal: choosing entrance control Types of security doors for commercial buildings University Security Doors Explained Vehicle Dynamics Assessment: What It Tells the Buyer Before a Barrier Is Specified Warehouse Security Doors Explained Warehouse Security Gates Warranty, Defects Liability and Guarantees for Security Doors and Barriers What affects the cost of a bullet resistant door What affects the cost of a high-security door in the UK Window Security Bars View all →

Products

One supplier for the whole building envelope

Ready to specify your project?

Free assessment, written specification and test evidence. Reply within one working day.