Certified physical security

ArxBridge
Steel door sample in a security test frame with an assessor in a UK test laboratory

ArxBridge

Security Gates Cost Factors Explained

What sets a security gate quote: leaf and opening, rating, operator and duty cycle, access control, safety devices and ground works. Factors only, no prices.

  • ✓Third-party test evidence with every product
  • ✓Written specification you can issue to tender
  • ✓Supplied and installed across the UK
Prefer to talk?+44 7352 267239

Get a free project quote

Rating, written specification and budget range within one working day.

ArxBridge Quote Form

Confidential. No cost, no obligation.

Third-party tested

Evidence with every quote

UK manufactured

Made to your sizes

One accountable team

Specify, supply, install

Confidential handling

Details never shared

A security gate has no standard price. The quote turns on the opening, the leaf, the rating, the operator, the access control, the safety devices and the ground works needed to fit it. Two gates that look the same from the road can carry very different quotes, because the parts that set the price sit inside the leaf, the posts, the operator and the foundations. Compare quotes like for like: same opening, same leaf, same rating with test evidence, same operator and duty cycle, same access control and same fitting scope. A quote that leaves out the safety devices, the rated posts or the foundations is not cheaper. It is a different gate.

The factors below follow the order a quote is built in. Start with the opening and the leaf, then the rating, then the operator and how often the gate moves, then access control and safety, then the ground works. Our gate automation guide works through sliding and swing operators, safety to EN 12453 and duty cycle in full, and our road blockers guide covers the rising plate option for entrances with constant vehicle flow. Our anti-ram gates and barriers guide sets the gate beside bollards and blockers in one line of defence.

No figures appear on this page, because a figure without the opening, the leaf and the rating behind it would mislead. What follows is what each factor changes and what to ask for, so a quote can be read on its own terms and two quotes can be compared fairly.

  • No standard priceThe quote follows the opening, leaf, rating and ground works
  • EN 12453Safety in use of power operated doors
  • ISO 22343-1:2023Current vehicle barrier test standard
  • Duty cycleMatch the operator to how often the gate moves

The opening sets the baseline: width, leaf and ground

Every gate quote starts with the opening schedule: the width of each entrance, counted one by one. The leaf area grows with the span, and with it grow the posts, the operator and the foundations. A wide entrance needs a heavier leaf and stronger posts than a narrow one, and a tall leaf needs posts that hold it square for the whole life of the gate. The opening is the baseline every other factor adds to, so an entrance measured wrong produces a quote for a gate that does not fit.

The number of entrances matters as much as their size. A site with two vehicle entrances carries two leaves, two operators and two control points, while a site with one wide entrance carries one of each. The two jobs use different amounts of material and different amounts of fitting time, even when the total entrance width is similar. List every entrance separately, with its own width and ground conditions, rather than asking for a single figure for the site.

The ground decides the gate type before the leaf is chosen. A sliding leaf runs along the fence line and needs a run for the track or room for the overhang; a swing leaf opens in an arc and needs clear ground on one side. A tracked sliding gate needs a level, firm run with drainage, while a cantilever gate suits sloping or soft ground because the leaf hangs from rollers above the ground. Our sliding vehicle gates page sets out both types and the ground each one needs, and our security gates page covers the rated gate range.

Leaf size and material: steel, aluminium and the infill that fills it

The leaf is the moving part, and its size and material are the next step in the quote. Steel suits most sites and gives the highest resistance per section. Aluminium resists corrosion and suits coastal sites, at the cost of lower strength per section, so an aluminium leaf may need a deeper profile to match a steel one. The infill fills the leaf: solid infill gives privacy and a complete visual barrier, while mesh or bar infill lets light through and lets wind pass, which suits entrances where the leaf must be seen through or where wind load matters.

Leaf weight drives the rest of the gate. A heavy steel leaf asks more of the operator, the posts and the foundations than a light one, and a solid infill leaf acts as a sail in the wind, so a gate on an exposed site needs an operator sized for the leaf as built, with the infill the site chose. A gate on a sheltered yard and a gate on an exposed hilltop are not the same order, even when the entrance width is the same.

The finish is the next line in the quote. Powder coating gives the project colour and protects the steel in exposed positions. For coastal or chemical environments the specification steps up the coating system, and the site conditions decide the step. Whatever the material, the finish must sit on the tested construction without changing it: a coating or colour change that alters the leaf build needs fresh evidence.

Need this specified for your project?Free rating, written specification and budget range within one working day.
Get a free quote

The rating step: LPS 1175, PAS 68 and ISO 22343 on one gate

A rating is the largest single step in a gate quote after size. Gates on the rated security line are tested to LPS 1175, which runs from A1 to H20, with B3, C5 and D10 as the tool examples a specifier meets most often. Each step up needs a heavier leaf, stronger posts and stronger locking, and each needs its own test evidence. PAS 24 covers doorsets for dwellings, and Secured by Design is a scheme, not a rating, so a gate that names the scheme without naming the test has proved nothing.

The impact rating is a separate question with its own evidence. A gate that must stop a vehicle is tested under PAS 68, IWA 14-1 or ISO 22343-1:2023, which supersedes PAS 68:2013 and cancels and replaces IWA 14-1:2013. Test vehicles run from a 1,500 kg car to a 30,000 kg truck, and test speeds are 48, 64 and 80 km per hour. The rating states the vehicle type and mass, the impact speed, the impact angle and the penetration distance. Our ISO 22343 vehicle security barriers guide explains how to read the rating, and our vehicle impact ratings page sets out how the three standards sit together.

The rating belongs to the complete tested gate, not to the leaf alone. The posts and foundations are part of the tested gate, so a rated leaf in unrated posts is not a rated gate. Ask for the certificate naming the exact gate, its size and its configuration. A certificate for a different model does not cover the order, and a gate described as heavy duty without a certificate has no proven rating at all. A gate that must carry both a forced entry rating and an impact rating needs both sets of evidence on the same construction, and our anti-ram gates and barriers guide works through how the two sit together.

The operator and the duty cycle: how often the gate moves

The operator is the motor, the gearbox and the controls that drive the leaf, and it is sized to the leaf it moves, not to the entrance it guards. A heavy steel leaf, a wide leaf and a leaf that catches the wind all ask more of the operator than a light narrow one, and an operator sized below the leaf will strain, slow and wear out early. Ask the supplier to size the operator to the leaf as built, with the infill, the cladding and the wind load the site sees, and to put that sizing in writing with the order.

Duty cycle is the share of the day the operator is expected to work, and it is the figure that decides whether an operator lasts years or months. A gate on a quiet driveway moves a few times a day and rests between movements. A gate on a business park moves through the morning and evening peaks and rests in between. A gate on a logistics yard or a distribution depot moves all day, with vehicles arriving and leaving from the first shift to the last. An operator worked harder than its rating will run hot, slow and wear out early, and the gate will start to stop halfway through its travel.

Count how often the gate will move on the busiest day the site sees, not on an average day, and give that figure to the supplier before the operator is chosen. A gate that copes with the busiest day will cope with every other day too. Traffic that grows will outgrow an operator that was sized for the site as it was, not as it will be. A business park that adds tenants, a depot that adds a shift, or a school that adds a bus route will all ask the gate to move more often than it did on the day it was ordered. If the site expects growth, say so when the operator is specified. Our gate automation guide works through duty cycle and the operator types in full.

Every automated gate has a manual release so the leaf can be worked by hand when power fails. Agree the procedure with the security team in advance, so the entrance stays controlled during manual operation and the gate is put back into automatic use properly when power returns. A gate left in manual mode after a power cut is a gate that is not controlled at all.

Access control: readers, intercoms and the records they keep

Access control is the list of people and vehicles the gate must let through, and the way the gate checks each one. The common methods are fobs and cards for staff, keypads for visitors with a code, intercoms for deliveries, and readers that open the gate for a vehicle that is already known to the site. Each method suits a different entrance: a staff car park needs fobs that work in the rain, a delivery yard needs an intercom that reaches a person, and a site with regular contractors needs codes that can be changed when the work ends.

The gate should open for the right people and stay closed for everyone else, and the control system should keep a record of who opened it and when. A log that names the fob, the time and the direction of travel is the record the site needs when a vehicle is found where it should not be. Codes should be changed when staff leave, fobs should be cancelled when they are lost, and the list of people who can open the gate should be checked as often as the gate itself.

Access control and the safety system must work together, not against each other. A gate that closes on a timer can close on a vehicle that is still in the entrance, so the safety devices must hold the leaf open until the path is clear. People on foot should not have to cross the path of a moving vehicle leaf to reach the entrance, and a separate pedestrian gate or a marked route beside the vehicle gate is the usual answer. Our pedestrian speed gates page covers the fast lane for people on foot, and our turnstile, speed gate and portal guide compares the pedestrian side of entrance control.

Safety devices under EN 12453: part of the quote, not extras

EN 12453 covers safety in use of power operated doors, and EN 12445 covers the test methods for them. The two standards work together: one sets out what safe use looks like, and the other sets out how the door is tested to prove it. The safety design follows a risk assessment of the entrance: who walks past the leaf, where children and vehicles cross, and what happens when power fails.

The devices most often fitted are photocells that watch the path of the leaf and safety edges that stop the leaf when they touch an obstruction. Automated gates carry safety devices that stop or reverse the leaf if a person is in its path, and the devices must cover the whole travel of the leaf, not just the middle of it. A heavy leaf needs a safety brake that arrests the leaf if the drive fails, so it cannot free-fall. An emergency stop within reach and a manual override for power failure complete the set.

A quote that leaves out the safety devices is not a saving. The devices must be fitted, tested and recorded before the gate is used, so a gate ordered without them will need them added later, at greater cost and with the entrance out of use while the work is done. Test the devices after fitting and at every inspection, because a safety device that has failed silently is worse than no device at all.

Foundations, power and ground works: the work before the gate

The posts carry the leaf and the operator load together, so they need foundations that hold them square for the life of the gate. A post that leans will drag the leaf, strain the operator and wear the hinges, and the fault grows a little each year. The foundations need a survey of the ground and the services under it. Utilities, drains and cables run under most entrances, and a foundation dug without a survey will find them the hard way.

Where the gate must also stop a vehicle, the foundations are part of the rating, not an afterthought. The rating covers the installed system, leaf, posts and foundations together, and a gate that passed its test in one foundation detail does not carry the rating in a different one. Our PAS 68 bollard foundations guide sets out the deep and shallow choice for rated lines, and our guide to choosing HVM bollards works through the bollard side of the same line.

An automated gate needs a dedicated electrical supply, planned before the civil work begins. The exact requirement depends on the motor and the site access control, so the supply should be agreed with the gate design early, with ducting laid before the ground is finished. Plan the power, the ducting and the drainage at the same time as the gate, not after it. Our hostile vehicle mitigation page covers the wider entrance line the gate stands in.

Reading two gate quotes side by side: what to check before you order

Ordering a security gate is a specification exercise, not a shopping exercise. The order should name the leaf type and width, the operator type and its duty rating, the safety devices and the risk assessment they follow, the access control method, the manual release and the test evidence. Our how to specify security doors guide covers the same discipline for rated doors, and our HVM standards guide explains PAS 68, IWA 14-1 and ISO 22343-1:2023 for entrances that must also stop a vehicle.

Read two quotes side by side against the same list: same opening, same leaf and material, same rating with test evidence, same operator and duty cycle, same access control, same safety devices, same fitting scope with foundations, power and drainage, same evidence pack and same service routine. A quote that leaves out the safety devices, the rated posts, the foundations or the evidence is not cheaper. It is a different gate, and the missing parts will be bought later, when the entrance is already in use.

Finally, order the evidence with the gate. The test report, the risk assessment, the duty rating and the safety device schedule should arrive with the gate, and the handover pack should name the inspection routine the site will follow. A site that files the evidence on the day the gate arrives has a record it can use for the whole life of the entrance. For the impact side of the entrance, our road blockers guide covers the rising plate option where the flow never stops.

Factor What changes it What to ask
Opening and leaf Width, leaf size and material, infill, wind load Opening schedule, leaf build, finish
Rating LPS 1175 step, impact rating, dual rating Certificate naming the exact gate
Operator and duty cycle Leaf weight, movements on the busiest day, growth Operator sizing in writing, manual release
Access control and safety Readers, intercoms, safety devices, risk assessment Device schedule, test records
Foundations and ground works Ground, services, power, drainage Survey, foundation detail, supply plan

A cheaper quote that leaves out the safety devices, the rated posts or the foundations is not cheaper. It is a different gate.

Why is there no standard price for a security gate?

No two openings are alike. The opening, the leaf, the rating, the operator, the access control and the ground works all differ from site to site, so a figure without those behind it would mislead. A quote is built from the opening schedule and the rating, and the only fair comparison is between two quotes for the same opening, leaf and rating.

What is the biggest single factor in a gate quote?

The opening and the rating step, taken together. A wide entrance needs a heavier leaf, stronger posts and a bigger operator, and each step up in rating needs heavier construction and its own test evidence. After those two, the operator and duty cycle and the ground works are the next steps.

Does a crash rated gate cost more than an access control gate?

In general terms, yes, because they are different products. A crash rated gate carries a tested leaf, tested posts and tested foundations, with evidence for the impact rating. An access control gate only controls who may pass, with no impact evidence. The two should never be compared as if they were the same gate.

What does the duty cycle do to the quote?

It sizes the operator. A gate that moves a few times a day needs a lighter operator than one that moves through morning and evening peaks, and a gate on a logistics yard that moves all day needs the heaviest duty of all. State the movements on the busiest day and any growth the site expects, so the operator is chosen for the real duty.

What should a gate quote include?

The leaf, the posts, the operator, the safety devices, the access control, the foundations, the power and drainage, the test evidence and the service routine. Ask for each item by name before the order is placed, and compare two quotes against the same list.

Hidden costs a gate quote can carry

A gate quote that looks low often leaves out the work before the gate. The leaf is the part of the gate people see, and the posts, the foundations, the power, the drainage and the safety devices are the parts they do not. A quote that names only the leaf is not a quote for a gate. It is a quote for a moving panel, and the missing parts will be bought later, when the gate is already in use.

Ground works decide whether the gate stays where it was put. A sliding gate needs a level track on a foundation that does not settle, because a track that settles lets the gate drop and the lock miss its keep. A swing gate needs posts set deep enough that the weight of the leaf does not pull them out of line. The foundation design should name the depth, the width, the concrete and the ground it was designed for, and the ground should be surveyed before the order is placed.

The operator decides whether the gate keeps moving. The operator must be sized to the leaf as built, with the infill, the cladding and the wind load the site sees, because an operator sized below the leaf will strain, slow and wear out early. Our anti-ram gates and barriers guide works through sliding and swing gates in full, and our gate automation guide works through operators, duty cycle and safety devices.

Mistakes that leave a gate line open

The first mistake is ordering the leaf without the posts. The rating covers the installed system, not the leaf alone, so order leaf, posts, fixings and foundations as one system. A rated leaf on untested posts is not a rated gate, because the test never covered those posts in that ground.

The second mistake is leaving a gap beside the gate wider than 1,200 mm. ProtectUK guidance sets 1,200 mm as the maximum clear gap between barriers in a line and 500 mm as the minimum height, so close every gap to 1,200 mm or below. A gate that stops a vehicle and leaves a 2,000 mm gap beside it has left a route through for the next vehicle, and a crash rated gate beside an unrated fence is a line with a fence-shaped hole in it.

The third mistake is leaving the gate in manual mode after a power cut. A gate in manual mode is a gate that is not controlled at all, so put the gate back into automatic use when power returns. Safety in use of power operated gates is covered by EN 12453, and the safety devices need scheduled checks like any other part of the system. A gate must not close on a vehicle or a person, and the fail state should be tested at handover with the power off.

Quote item What to ask Why it matters
Foundations Foundation design, depth and width A track that settles lets the gate drop
Operator and duty cycle Operator rating, movements on the busiest day An undersized operator wears out early
Safety devices Devices under EN 12453, test record A gate must not close on a vehicle or a person
Access control Reader type, codes, record kept A gate that admits everyone is not controlled
Test evidence Test report for the leaf, posts and foundations A rating string alone is not evidence

Read two quotes side by side against the same list: same opening, same leaf and rating with test evidence, same posts and foundations, same operator and duty cycle, same safety devices and access control, same power and ground works, same evidence pack and same service routine. A quote that leaves out the foundations, the safety devices or the evidence is not cheaper. It is a different gate.

Specifying a security gate?Send the entrance width, the ground conditions and the daily traffic for a tested gate quotation.
Get a free quote

Related

More in guides for specifiers

10 mistakes when specifying certified security doors 10 steps to specify an LPS 1175 door Acceptance and Snagging of a Security Door or Barrier Job Access Control Doors Acoustic Doors: Ratings and Specification After a Forced Entry Attempt: Checking a Security Door Airport Security Doors Anti-Ligature Doors for Mental Health Wards Anti-Ram Bollards Anti-ram gates and barriers: protecting vehicle entrances Arcade Security Doors Explained Automatic Doors Automatic Gates Cost Factors Automatic Vehicle Barriers Ballistic Panels Bank Security Doors Bingo Hall Security Doors Explained Blast doors: glazed vs solid and how they are rated Blast protection window film: what it does and what it cannot do Blast resistant windows: what drives the cost and how to specify them Bollard Cost Factors Explained Bollard regulations in the UK: spacing, height and depth Bookmaker Security Doors Explained Builders Merchant Security Doors Bullet Resistant Glass Cost Factors Bullet resistant glass ratings explained: BR1 to BR7 and SG classes Bullet resistant vs bulletproof glass: what the difference means Buying Security Doors and HVM Through Public Frameworks Car Park Security Doors Explained Car Showroom Security Doors Casino Security Doors Explained CDM 2015 Duties When Security Doors, Shutters or HVM Are Installed Cinema Security Doors Cleanroom Doors Cold Store Doors College Security Doors Commissioning, Handover and the O&M Manual for Security Doors and HVM Communal entrance doors for flats: Secured by Design and what to specify Community Centre Security Doors Control Room Doors Court Security Doors Crash Rated Fences and HVM Fencing Explained Data centre physical security: doors, glazing, HVM and shielding by zone Dental Practice Security Doors Depot Security Doors Explained Door Entry Systems Due Diligence When Selecting Vehicle Security Barriers Emergency Exit Doors EMP Shielding Cost Factors Explained Exhibition Centre Fire Door Rules Exhibition Centre Security Doors Factory Security Doors Faraday cage vs RF shielded room: what a business needs FB4 vs FB6 vs FB7: how to choose a ballistic rating Fire and security doors: how dual certification works Fire Compartmentation Fire Curtains Fire Door Certification Fire Door Closers Explained Fire Door Cost Factors Fire Door Duties of the Accountable Person Fire Door Gaps Fire Door Hardware Explained Fire door inspection checklist for steel and timber doors Fire Door Maintenance Fire Door Regulations Care Homes Fire Door Regulations for A and E Departments Fire Door Regulations for Airports Explained Fire Door Regulations for Bowls Clubs Fire door regulations for commercial buildings in the UK Fire Door Regulations for Dialysis Centres Fire Door Regulations for Hockey Clubs Fire Door Regulations for Hospitals Explained Fire Door Regulations for Offices Explained Fire Door Regulations for Operating Theatres Fire Door Regulations for Retail Explained Fire Door Regulations for Schools Explained Fire Door Regulations for Snooker Clubs Fire Door Regulations for Stadiums Fire Door Regulations for Student Accommodation Fire Door Regulations for Warehouses Fire Door Regulations Leisure Centres Fire Door Regulations Restaurants Fire Door Remediation Programme for Housing Providers Fire Door Rules for Badminton Clubs Fire Door Rules for Bingo Halls Fire Door Rules for Bookmakers Fire Door Rules for Bowling Alleys Fire Door Rules for Car Parks Fire Door Rules for Car Showrooms Fire Door Rules for Cinemas Fire Door Rules for Climbing Centres Fire Door Rules for Colleges Fire Door Rules for Community Centres Fire Door Rules for Cricket Clubs Fire Door Rules for Dental Practices Fire Door Rules for Depots Explained Fire Door Rules for Golf Clubs Fire Door Rules for GP Surgeries Fire Door Rules for Gyms Explained Fire Door Rules for Ice Rinks Fire Door Rules for Maternity Units Fire Door Rules for Mental Health Units Fire Door Rules for Museums Fire Door Rules for Oncology Units Fire Door Rules for Opticians Fire Door Rules for Pawnbrokers Fire Door Rules for Petrol Stations Fire Door Rules for Pharmacies Fire Door Rules for Ports Fire Door Rules for Post Offices Fire Door Rules for Prisons Fire Door Rules for Rehabilitation Centres Fire Door Rules for Self Storage Fire Door Rules for Shopping Centres Fire Door Rules for Squash Clubs Fire Door Rules for Supermarkets Fire Door Rules for Swimming Pools Fire Door Rules for Tennis Clubs Fire Door Rules for Theatres Fire Door Rules for UK Arcades Fire Door Rules for UK Casinos Fire Door Rules for UK Hospices Fire Door Rules for Walk-in Centres Fire Door Signage Fire Door Vision Panels Fire Doors and Gateway 2 in Higher-Risk Buildings Fire Rated Glass Cost Explained Fire Rated Sliding Doors Explained Fire Rated Windows Cost Factors Fire Rated Windows Explained Fire Safety Enforcement Notices and Fire Doors: What the Responsible Person Must Do Flat Entrance Doors: PAS 24 and Fire Rated Forced Entry vs Ballistic vs Blast: Which Rating a Site Needs Garage Security Doors Explained Gate Automation Explained Golden Thread Records for Fire Doors GP Surgery Security Doors Explained Gym Security Doors Explained High Speed Doors HMO Fire Doors Hospice Security Doors Explained Hospital Security Doors: Wards, A&E, Plant Hospital Security Gates Hotel Fire Doors Hotel Security Doors How to choose HVM bollards: fixed, shallow mount, removable and automatic How to keep an LPS 1175 door rating valid after installation How to Specify Fire Doors in a Housing Tender How to specify security doors: a checklist for architects How to Verify a Secured by Design Listing How to Verify an LPS 1175 Certificate on Red Book Live How to Write an Operational Requirement for Physical Security HVM planters and street furniture: protection that blends in In-Service Care of Vehicle Security Barriers Installation Handover: LPS 1175 Doors and PAS 68 Barriers Intumescent Seals ISO 16933 explained: EXV and SB classes and hazard ratings ISO 22343 vehicle security barriers explained Keeping a Dual-Certified Fire and Security Door Valid in Service Laboratory Security Doors Layered Security for a Site: Deter, Detect, Delay, Mitigate, Respond Lead Times and Programme Risks for LPS 1175 Doors Leisure Centre Security Doors Library Security Doors Listed Building Fire Doors Loading Bay Doors Explained Lockdown and Access Control Hardware on an LPS 1175 Door LPS 1175 Gates and Grilles Explained LPS 1175 Issue 8 explained: from SR1 to SR8 to A1 to H20 LPS 1175 Roller Shutters LPS 1175 vs ASTM F2781 and Other US Ratings Explained LPS 1175 vs EN 1627: how UK and European burglar resistance ratings compare LPS 1175 vs PAS 24: which security standard does your door need? LPS 1175 Windows and Walling Explained Martyn’s Law and Places of Worship: What a Buyer Checks for Doors and Entry Control Martyn’s Law Enhanced Tier: Physical Measures and the Specifier Brief Martyn’s Law Standard Tier: Procedures, Doors and Shutters Martyn’s Law Timeline and the SIA Regulator Martyn’s Law: what premises must do and which physical measures to consider Master Key Systems MRI and RF shielded rooms: how they work and what to specify Museum Security Doors NPSA Catalogue of Security Equipment (CSE) Explained NPSA Forced Entry and Blast Guidance for Government Sites NPSA Guidance on Lockdown and Marauding Attack: What It Asks of Doors and Entrances Office Security Doors Optician Security Doors Explained Panic Hardware PAS 24 requirements for doors and windows explained PAS 68 Bollard Foundations Explained PAS 68 bollards: ratings, spacing and cost factors PAS 68 vs IWA 14 vs ISO 22343: hostile vehicle mitigation standards explained Pawnbroker Security Doors Explained Pedestrian Gates Petrol Station Security Doors Pharmacy Security Doors Planning Permission for Security Shutters, Gates and Bollards on Commercial Premises Plant room doors: fire, security and ventilation requirements Plant Room Fire Doors Port Security Doors Post Office Security Doors Explained Powder coating vs galvanising vs paint for steel Preliminary Market Engagement for Security Doors and HVM Prison Security Doors Programming a Security Door and Barrier Package on a Live Site Public-Sector Tender Response Checklist for Security Door and HVM Supply Reading a PAS 24 and SBD Door Test Report Regulation 38 Fire Safety Information at Handover for Fire-Rated Security Doorsets Replacing Security Doors in an Occupied Building Restaurant Security Doors Retail Security Doors Revolving Doors RF shielding standards and how shielded rooms are tested Rising Bollard Cost Factors Road Blocker Cost Factors Explained Road Blockers Explained Roller Shutter Cost Factors: What Drives the Price Roller shutter regulations in the UK: safety and maintenance Safe room and panic room doors: specification basics Safety Duties for Powered Doors, Gates and Barriers on Commercial Sites School Security Doors Sectional Doors Secured by Design explained: is it mandatory for doors? Secured by Design vs NPSA vs LPCB: Which One You Need Security Door Locks Security Door Maintenance Checklist Security Doors and Access for Everyone: What Approved Document M Asks Security Doors for A and E Departments Security Doors for Badminton Clubs Security Doors for Bowling Alleys Security Doors for Bowls Clubs Security Doors for Climbing Centres Security Doors for Cricket Clubs Security Doors for Dialysis Centres Security Doors for Golf Clubs Security Doors for Hockey Clubs Security Doors for Ice Rinks Security Doors for Maternity Units Security Doors for Mental Health Units Security Doors for Oncology Units Security Doors for Operating Theatres Security Doors for Rehabilitation Centres Security Doors for Snooker Clubs Security Doors for Squash Clubs Security Doors for Swimming Pools Security Doors for Tennis Clubs Security Doors for Walk-in Centres Security Doors West Midlands Explained Security Fencing Security shutters vs high performance roller doors Security shutters vs retractable grilles: which suits retail and commercial openings? Security Turnstiles Explained Security Window Film Security Windows for Schools Explained Self Storage Security Doors Server Room Doors Explained Shopping Centre Security Doors Smoke Control Doors Explained Smoke Curtains Specification Mistakes When Mixing LPS 1175, PAS 24 and SBD in One Tender SR2 vs SR3 vs SR4 security doors: choosing the right LPS 1175 level Stadium Security Doors Steel Door Frames Steel vs aluminium security doors: strength, ratings and looks Steel vs timber fire doors: which suits your building? Student Accommodation Security Doors Substation doors: security, ventilation and specification Supermarket Security Doors Telescopic Bollards Tender Evaluation Criteria and Scoring for Security Doors and HVM The Scope of a Maintenance Contract for Security Doors and Barriers Theatre Security Doors Thermal and Weather Performance of External Security Doorsets Thermally broken steel security doors: U-values and certification Traffic Calming as Hostile Vehicle Mitigation Transport hub security requirements Turnstile Cost Factors Explained Turnstile vs speed gate vs security portal: choosing entrance control Types of security doors for commercial buildings University Security Doors Explained Vehicle Dynamics Assessment: What It Tells the Buyer Before a Barrier Is Specified Warehouse Security Doors Explained Warehouse Security Gates Warranty, Defects Liability and Guarantees for Security Doors and Barriers What affects the cost of a bullet resistant door What affects the cost of a high-security door in the UK Window Security Bars View all →

Products

One supplier for the whole building envelope

Ready to specify your project?

Free assessment, written specification and test evidence. Reply within one working day.