MRI and RF shielded rooms: how they work and what to specify

How MRI and RF shielded rooms work, what attenuation to specify in dB, and how doors, windows and filters keep the Faraday cage intact across the UK.

  • ✓Third-party test evidence with every product
  • ✓Written specification you can issue to tender
  • ✓Supplied and installed across the UK
Prefer to talk?+44 7352 267239

Get a free project quote

Rating, written specification and budget range within one working day.

ArxBridge Quote Form

Confidential. No cost, no obligation.

Third-party tested

Evidence with every quote

UK manufactured

Made to your sizes

One accountable team

Specify, supply, install

Confidential handling

Details never shared

An MRI room is a Faraday cage: a continuous conductive enclosure that blocks outside radio signals from reaching the scanner and keeps the scanner’s own signals contained. Specify the attenuation in dB across a stated frequency range, treat every door, window and cable route as a weak point, and test the finished room before the scanner is installed.

  • Faraday cageA continuous conductive shell around the scan room
  • AttenuationCommonly specified around 90 to 100 dB
  • Weak pointsDoors, windows, filters and waveguides
  • AcceptanceTested after installation, before handover

The Faraday cage principle

A Faraday cage works by surrounding a space with a conductive material, usually copper or aluminium sheet, so that electromagnetic fields induce currents in the shell rather than passing through it. For an MRI suite the cage lines the walls, floor and ceiling of the scan room, and every panel is joined to the next with a continuous electrical bond. One gap is enough to let radio frequency energy through, which is why the quality of the joints and seals matters more than the choice of metal.

The panels themselves are rarely the limit. At the frequencies an MRI scanner uses, the metal is hundreds of skin depths thick, so the material alone would give far more attenuation than any practical specification asks for. The enclosure only performs as well as its weakest joint, its door, its window and the points where services pass through. A room built with care reaches the specified attenuation; a room with one poorly bonded seam does not.

Cages can be fitted into new buildings and into existing rooms. In a new build the shielding usually goes in during the fit out, coordinated with the structural floor, the services and the scanner delivery route. In an existing department the cage is built inside the current room, which reduces the finished dimensions, so the room size must allow for the lining, the door swing and the scanner’s own footprint. Early coordination with the scanner supplier avoids a cage that the magnet cannot fit through. Our MRI shielded rooms page describes how these enclosures are built.

Attenuation in dB across a frequency range

Attenuation is stated in decibels, and the number means nothing without the frequency range beside it. A common vendor specification for a clinical MRI room is around 90 to 100 dB between roughly 10 and 130 MHz, which covers the operating bands of 1.5 tesla and 3 tesla scanners. The 1.5T system works near 64 MHz and the 3T system near 128 MHz, so the specified range must include the scanner’s own frequency with margin on both sides.

Higher is not automatically better. Above the specified attenuation the scanner sees no practical benefit, because the remaining noise sits below the thermal noise floor of the receiver. What matters is that the specified figure is met at every frequency in the range, not that one frequency measures higher than asked. Ask for a flat performance across the band rather than a peak number at a single point.

The specification should also state how the figure is measured: the test method, the antenna positions and the number of test points around the room. A single measurement at the centre of the room tells you little about the door seals or the filter panel. A proper acceptance test measures across the enclosure, including the penetrations, and records the results against the specification. The table below shows what a complete specification states.

Item State in the specification Why it matters
Attenuation The dB figure with the frequency range, for example around 100 dB from 10 to 130 MHz A dB number on its own is meaningless
Test method The method, antenna positions and number of test points Proves the figure where leaks are most likely
Door Type, size, gasket system and clear opening for magnet delivery The largest penetration and the delivery route in one
Penetrations Every cable, pipe, gas and data route with its shielding method Nothing may cross the shield untreated
Need this specified for your project?Free rating, written specification and budget range within one working day.
Get a free quote

RF shielding and magnetic shielding are different jobs

Radio frequency shielding and magnetic shielding solve different problems with different materials. Copper and aluminium, both non-magnetic, are excellent for RF because their high conductivity reflects and absorbs the electric field component. They do almost nothing for the static magnetic field of the scanner, which passes through them as if they were not there. Our RF shielding page covers the RF side in more detail.

The static field is managed with steel, which has high magnetic permeability and gives the flux a preferred path. Steel shielding is used where the 5 gauss line must be pulled back from a public corridor, a lift shaft or an adjacent room with sensitive equipment. It is a separate layer of design from the RF cage and it is calculated from the magnet’s own fringe field data, not from the RF specification.

Do not assume one material does both jobs. An RF cage of copper gives the room its clean radio environment; steel panels or shunts around the magnet room manage where the static field reaches. The scanner supplier provides the fringe field plots, and the shielding design follows from those plots and the building layout.

Penetration points: doors, windows, filters and waveguides

Every opening in the cage is a potential leak, and the door is usually the largest. A shielded door closes against conductive gaskets, often beryllium copper fingerstock, that maintain contact around the full perimeter when the door is shut. The fingers compress with each closing, so they wear, and the door needs regular inspection to keep its performance. A heavy door that is left ajar gives no shielding at all.

Windows use a conductive mesh laminated between glass panes, which keeps the view into the scan room while maintaining the electrical continuity of the wall. Ventilation passes through honeycomb waveguides: the small cells let air through but are dimensioned below cutoff for the frequencies of interest, so radio energy cannot follow the air path. Power and signal cables pass through filtered penetrations that attenuate conducted noise on the line.

Pipes, medical gases and data links each need their own treatment. A waveguide below cutoff can carry a pipe through the shield; fibre optic data links are ideal because the glass fibre carries no conducted RF at all. The rule is simple: nothing crosses the shield untreated. Every penetration is listed on the drawings, and each one is assigned a shielding method before installation starts. Rooms with wider electromagnetic requirements are covered on our EMP shielding page.

Testing and acceptance

The cage is tested after installation is complete and before the scanner is delivered. Testing too early risks damage from following trades; testing after the scanner arrives makes remedial work far harder. The acceptance test measures attenuation at multiple points, including doors, windows and the filter panel, and the results are compared with the specification.

Leaks are found and fixed, then the affected points are re-tested. Common findings are door gaskets that need adjustment, a filter with a poor bond to the panel, or a waveguide cut to the wrong length. None of these are unusual; the point of the test is to catch them while access is easy. Our installation service, done by our own team or by our installation partners, programmes testing before handover, never after.

Keep the test report with the building records. It is the baseline for every future check, and it proves what the room achieved on the day it was handed over. If image artefacts appear later, the first question is whether the cage still performs as it did at acceptance. For the ratings on the doors elsewhere in the department, our standards guides explain how to read them.

Planning the room with the scanner supplier

The scanner supplier sets the performance the room must meet. Their site planning guide states the required attenuation, the frequency range, the door type and size, and the services the scanner needs. Start from that document and design the cage around it, not the other way round.

Agree the responsibilities early. The supplier typically defines the RF performance and the magnet’s fringe field; the shielding contractor designs and builds the cage to meet it; the main contractor provides the structure, the builders’ work openings and the services routes. The door size deserves special attention: the magnet is delivered in one piece and the shielded door must pass it, so check the delivery path before the cage is built.

Programme the work so the cage is complete, tested and accepted before the scanner delivery date. Scanner installations run to tight schedules and a late cage delays the whole project. A realistic programme leaves time for testing, remedial work and re-testing. Many of these projects sit within healthcare estates, where access constraints shape the programme.

Quench pipe, services and maintenance

The quench pipe carries helium safely out of the building if the magnet quenches. It is a large bore pipe that must cross the shield, and it does so through a waveguide section sized below cutoff, with a straight run that avoids sharp bends. The route is agreed with the scanner supplier because the pipe has strict limits on length and bends, and it must discharge where the vented gas cannot re-enter the building.

Maintenance of the cage is mostly about the moving parts. Door gaskets and fingerstock wear with use and need periodic inspection and replacement; hinges and closers need adjustment so the door seats fully every time. Fixed panels need little attention unless the room is altered. Any alteration, a new cable route, a relocated socket, a different door, must be treated as a new penetration and detailed accordingly.

Re-test the room after any change and at sensible intervals. A short periodic check of the door and the known weak points catches wear before it shows up as image artefacts, and the maintenance log sits alongside the acceptance report as the room’s history. For related reading, see our guides to security shutters vs retractable grilles, safe room and panic room doors and all guides.

One untreated cable ruins the cage. A single new cable pulled through the shield without a filtered penetration can undo the whole installation. Route every addition through the shielding contractor.

Frequently asked questions

What attenuation should an MRI room achieve?

Follow the scanner supplier’s site planning guide. Suppliers commonly specify around 90 to 100 dB across the operating band of the scanner, for example from roughly 10 to 130 MHz for 1.5T and 3T systems. State the figure with its frequency range and the test method in the tender.

Can a shielded room be added to an existing department?

Yes. The cage is built inside the existing room, which reduces the finished dimensions. Check that the remaining space still fits the scanner, the door swing and the delivery route before committing to the design.

Why does the door matter more than the wall panels?

The panels are hundreds of skin depths thick, so the material is never the limit. The door is the largest opening, it moves, and its gaskets wear, which makes it the most likely leak path and the part that needs the most attention.

Who tests the finished room?

The shielding contractor tests the completed cage before the scanner is delivered, measuring attenuation at multiple points including the penetrations. The test report is handed over with the room and kept as the baseline for future checks.

How often should the room be re-tested?

Re-test after any alteration to the room or its services, and check the door gaskets and known weak points at planned intervals. Wear shows up at the door long before it shows up anywhere else.

Planning an MRI suite?Send us the scanner supplier’s site planning guide and we will design the shielding to meet it.
Get a free quote

Related

More in guides for specifiers

10 mistakes when specifying certified security doors 10 steps to specify an LPS 1175 door Acceptance and Snagging of a Security Door or Barrier Job Access Control Doors Acoustic Doors: Ratings and Specification After a Forced Entry Attempt: Checking a Security Door Airport Security Doors Anti-Ligature Doors for Mental Health Wards Anti-Ram Bollards Anti-ram gates and barriers: protecting vehicle entrances Arcade Security Doors Explained Automatic Doors Automatic Gates Cost Factors Automatic Vehicle Barriers Ballistic Panels Bank Security Doors Bingo Hall Security Doors Explained Blast doors: glazed vs solid and how they are rated Blast protection window film: what it does and what it cannot do Blast resistant windows: what drives the cost and how to specify them Bollard Cost Factors Explained Bollard regulations in the UK: spacing, height and depth Bookmaker Security Doors Explained Builders Merchant Security Doors Bullet Resistant Glass Cost Factors Bullet resistant glass ratings explained: BR1 to BR7 and SG classes Bullet resistant vs bulletproof glass: what the difference means Buying Security Doors and HVM Through Public Frameworks Car Park Security Doors Explained Car Showroom Security Doors Casino Security Doors Explained CDM 2015 Duties When Security Doors, Shutters or HVM Are Installed Cinema Security Doors Cleanroom Doors Cold Store Doors College Security Doors Commissioning, Handover and the O&M Manual for Security Doors and HVM Communal entrance doors for flats: Secured by Design and what to specify Community Centre Security Doors Control Room Doors Court Security Doors Crash Rated Fences and HVM Fencing Explained Data centre physical security: doors, glazing, HVM and shielding by zone Dental Practice Security Doors Depot Security Doors Explained Door Entry Systems Due Diligence When Selecting Vehicle Security Barriers Emergency Exit Doors EMP Shielding Cost Factors Explained Exhibition Centre Fire Door Rules Exhibition Centre Security Doors Factory Security Doors Faraday cage vs RF shielded room: what a business needs FB4 vs FB6 vs FB7: how to choose a ballistic rating Fire and security doors: how dual certification works Fire Compartmentation Fire Curtains Fire Door Certification Fire Door Closers Explained Fire Door Cost Factors Fire Door Duties of the Accountable Person Fire Door Gaps Fire Door Hardware Explained Fire door inspection checklist for steel and timber doors Fire Door Maintenance Fire Door Regulations Care Homes Fire Door Regulations for A and E Departments Fire Door Regulations for Airports Explained Fire Door Regulations for Bowls Clubs Fire door regulations for commercial buildings in the UK Fire Door Regulations for Dialysis Centres Fire Door Regulations for Hockey Clubs Fire Door Regulations for Hospitals Explained Fire Door Regulations for Offices Explained Fire Door Regulations for Operating Theatres Fire Door Regulations for Retail Explained Fire Door Regulations for Schools Explained Fire Door Regulations for Snooker Clubs Fire Door Regulations for Stadiums Fire Door Regulations for Student Accommodation Fire Door Regulations for Warehouses Fire Door Regulations Leisure Centres Fire Door Regulations Restaurants Fire Door Remediation Programme for Housing Providers Fire Door Rules for Badminton Clubs Fire Door Rules for Bingo Halls Fire Door Rules for Bookmakers Fire Door Rules for Bowling Alleys Fire Door Rules for Car Parks Fire Door Rules for Car Showrooms Fire Door Rules for Cinemas Fire Door Rules for Climbing Centres Fire Door Rules for Colleges Fire Door Rules for Community Centres Fire Door Rules for Cricket Clubs Fire Door Rules for Dental Practices Fire Door Rules for Depots Explained Fire Door Rules for Golf Clubs Fire Door Rules for GP Surgeries Fire Door Rules for Gyms Explained Fire Door Rules for Ice Rinks Fire Door Rules for Maternity Units Fire Door Rules for Mental Health Units Fire Door Rules for Museums Fire Door Rules for Oncology Units Fire Door Rules for Opticians Fire Door Rules for Pawnbrokers Fire Door Rules for Petrol Stations Fire Door Rules for Pharmacies Fire Door Rules for Ports Fire Door Rules for Post Offices Fire Door Rules for Prisons Fire Door Rules for Rehabilitation Centres Fire Door Rules for Self Storage Fire Door Rules for Shopping Centres Fire Door Rules for Squash Clubs Fire Door Rules for Supermarkets Fire Door Rules for Swimming Pools Fire Door Rules for Tennis Clubs Fire Door Rules for Theatres Fire Door Rules for UK Arcades Fire Door Rules for UK Casinos Fire Door Rules for UK Hospices Fire Door Rules for Walk-in Centres Fire Door Signage Fire Door Vision Panels Fire Doors and Gateway 2 in Higher-Risk Buildings Fire Rated Glass Cost Explained Fire Rated Sliding Doors Explained Fire Rated Windows Cost Factors Fire Rated Windows Explained Fire Safety Enforcement Notices and Fire Doors: What the Responsible Person Must Do Flat Entrance Doors: PAS 24 and Fire Rated Forced Entry vs Ballistic vs Blast: Which Rating a Site Needs Garage Security Doors Explained Gate Automation Explained Golden Thread Records for Fire Doors GP Surgery Security Doors Explained Gym Security Doors Explained High Speed Doors HMO Fire Doors Hospice Security Doors Explained Hospital Security Doors: Wards, A&E, Plant Hospital Security Gates Hotel Fire Doors Hotel Security Doors How to choose HVM bollards: fixed, shallow mount, removable and automatic How to keep an LPS 1175 door rating valid after installation How to Specify Fire Doors in a Housing Tender How to specify security doors: a checklist for architects How to Verify a Secured by Design Listing How to Verify an LPS 1175 Certificate on Red Book Live How to Write an Operational Requirement for Physical Security HVM planters and street furniture: protection that blends in In-Service Care of Vehicle Security Barriers Installation Handover: LPS 1175 Doors and PAS 68 Barriers Intumescent Seals ISO 16933 explained: EXV and SB classes and hazard ratings ISO 22343 vehicle security barriers explained Keeping a Dual-Certified Fire and Security Door Valid in Service Laboratory Security Doors Layered Security for a Site: Deter, Detect, Delay, Mitigate, Respond Lead Times and Programme Risks for LPS 1175 Doors Leisure Centre Security Doors Library Security Doors Listed Building Fire Doors Loading Bay Doors Explained Lockdown and Access Control Hardware on an LPS 1175 Door LPS 1175 Gates and Grilles Explained LPS 1175 Issue 8 explained: from SR1 to SR8 to A1 to H20 LPS 1175 Roller Shutters LPS 1175 vs ASTM F2781 and Other US Ratings Explained LPS 1175 vs EN 1627: how UK and European burglar resistance ratings compare LPS 1175 vs PAS 24: which security standard does your door need? LPS 1175 Windows and Walling Explained Martyn’s Law and Places of Worship: What a Buyer Checks for Doors and Entry Control Martyn’s Law Enhanced Tier: Physical Measures and the Specifier Brief Martyn’s Law Standard Tier: Procedures, Doors and Shutters Martyn’s Law Timeline and the SIA Regulator Martyn’s Law: what premises must do and which physical measures to consider Master Key Systems Museum Security Doors NPSA Catalogue of Security Equipment (CSE) Explained NPSA Forced Entry and Blast Guidance for Government Sites NPSA Guidance on Lockdown and Marauding Attack: What It Asks of Doors and Entrances Office Security Doors Optician Security Doors Explained Panic Hardware PAS 24 requirements for doors and windows explained PAS 68 Bollard Foundations Explained PAS 68 bollards: ratings, spacing and cost factors PAS 68 vs IWA 14 vs ISO 22343: hostile vehicle mitigation standards explained Pawnbroker Security Doors Explained Pedestrian Gates Petrol Station Security Doors Pharmacy Security Doors Planning Permission for Security Shutters, Gates and Bollards on Commercial Premises Plant room doors: fire, security and ventilation requirements Plant Room Fire Doors Port Security Doors Post Office Security Doors Explained Powder coating vs galvanising vs paint for steel Preliminary Market Engagement for Security Doors and HVM Prison Security Doors Programming a Security Door and Barrier Package on a Live Site Public-Sector Tender Response Checklist for Security Door and HVM Supply Reading a PAS 24 and SBD Door Test Report Regulation 38 Fire Safety Information at Handover for Fire-Rated Security Doorsets Replacing Security Doors in an Occupied Building Restaurant Security Doors Retail Security Doors Revolving Doors RF shielding standards and how shielded rooms are tested Rising Bollard Cost Factors Road Blocker Cost Factors Explained Road Blockers Explained Roller Shutter Cost Factors: What Drives the Price Roller shutter regulations in the UK: safety and maintenance Safe room and panic room doors: specification basics Safety Duties for Powered Doors, Gates and Barriers on Commercial Sites School Security Doors Sectional Doors Secured by Design explained: is it mandatory for doors? Secured by Design vs NPSA vs LPCB: Which One You Need Security Door Locks Security Door Maintenance Checklist Security Doors and Access for Everyone: What Approved Document M Asks Security Doors for A and E Departments Security Doors for Badminton Clubs Security Doors for Bowling Alleys Security Doors for Bowls Clubs Security Doors for Climbing Centres Security Doors for Cricket Clubs Security Doors for Dialysis Centres Security Doors for Golf Clubs Security Doors for Hockey Clubs Security Doors for Ice Rinks Security Doors for Maternity Units Security Doors for Mental Health Units Security Doors for Oncology Units Security Doors for Operating Theatres Security Doors for Rehabilitation Centres Security Doors for Snooker Clubs Security Doors for Squash Clubs Security Doors for Swimming Pools Security Doors for Tennis Clubs Security Doors for Walk-in Centres Security Doors West Midlands Explained Security Fencing Security Gates Cost Factors Explained Security shutters vs high performance roller doors Security shutters vs retractable grilles: which suits retail and commercial openings? Security Turnstiles Explained Security Window Film Security Windows for Schools Explained Self Storage Security Doors Server Room Doors Explained Shopping Centre Security Doors Smoke Control Doors Explained Smoke Curtains Specification Mistakes When Mixing LPS 1175, PAS 24 and SBD in One Tender SR2 vs SR3 vs SR4 security doors: choosing the right LPS 1175 level Stadium Security Doors Steel Door Frames Steel vs aluminium security doors: strength, ratings and looks Steel vs timber fire doors: which suits your building? Student Accommodation Security Doors Substation doors: security, ventilation and specification Supermarket Security Doors Telescopic Bollards Tender Evaluation Criteria and Scoring for Security Doors and HVM The Scope of a Maintenance Contract for Security Doors and Barriers Theatre Security Doors Thermal and Weather Performance of External Security Doorsets Thermally broken steel security doors: U-values and certification Traffic Calming as Hostile Vehicle Mitigation Transport hub security requirements Turnstile Cost Factors Explained Turnstile vs speed gate vs security portal: choosing entrance control Types of security doors for commercial buildings University Security Doors Explained Vehicle Dynamics Assessment: What It Tells the Buyer Before a Barrier Is Specified Warehouse Security Doors Explained Warehouse Security Gates Warranty, Defects Liability and Guarantees for Security Doors and Barriers What affects the cost of a bullet resistant door What affects the cost of a high-security door in the UK Window Security Bars View all →

Products

One supplier for the whole building envelope

Ready to specify your project?

Free assessment, written specification and test evidence. Reply within one working day.