Certified physical security

ArxBridge
Lace Market brick building with a navy steel security door in Nottingham

Security · LPS 1175 SR2 to SR5

Security Doors in Nottingham

Security doors for Nottingham offices, business parks and industrial estates: ratings, fire and security on one doorset, and what to name on the order.

  • ✓Third-party test evidence with every product
  • ✓Written specification you can issue to tender
  • ✓Supplied and installed in Nottingham
Prefer to talk?+44 7352 267239

Get a free quote in Nottingham

Rating, written specification and budget range within one working day.

ArxBridge Quote Form

Confidential. No cost, no obligation.

Third-party tested

Evidence with every quote

UK manufactured

Made to your sizes

One accountable team

Specify, supply, install

Confidential handling

Details never shared

Supplied and installed in Nottingham

What we supply in Nottingham

More on this

Start with the opening, not the catalogue: that is where a Nottingham order goes right or wrong. A steel door rated B3 or C5 fits most entrances, a fire rated doorset belongs on every escape route, and a yard gate needs a rating of its own.

Nottingham is a city in the East Midlands, and its buildings ask different questions of their doors. Offices and business parks hold the commercial centre, shops serve the public through the day, and industrial estates and distribution units sit on out-of-town sites. Each kind of building needs a door that suits its own use.

One list, one row per opening, keeps a Nottingham order straight. Each row should name the building and the position, the fire period, the security rating where one is needed, and the leaf, the frame, the glass, the seals and the hardware as a single doorset. Our Nottingham page covers the city as a whole, and our Leeds page covers the city to the north.

  • LPS 1175Forced entry rating, B3 to D10
  • ISO 22343-1Vehicle impact test for gates and yards
  • FD30 / FD60Fire resistance periods tested to EN 1634-1
  • Martyn’s LawTiers for premises holding 200 or more people

Offices, shops and the city centre: the doors Nottingham meets first

Staff and visitors come through a Nottingham office entrance all day, and the door has to let the right people in and keep strangers out. Glazing at the door lets reception see a visitor before opening, while a rated screen holds if that visitor turns hostile. How glass, frame and beads are tested together is set out in our fire rated windows guide.

Doors serving more than 60 people need panic hardware to BS EN 1125, a bar that runs across at least 60 percent of the leaf so a crowd can find it without looking. Under BS 8300 and Approved Document M the opening force must stay below 30 N through the first 30 degrees and below 22.5 N after that, and a closer set too strong for the leaf puts the door outside those limits. The power sizes in BS EN 1154 are set out in our fire door closers guide.

Crowded premises carry duties under Martyn’s Law. The law works in tiers for premises that hold 200 or more people, received Royal Assent in April 2025, and is expected to go live in spring 2027. Escape doors fall inside those duties: each one has to open in a single action, in the direction of escape, with no key. Our Martyn’s Law guide explains the tiers and what each one asks of a building.

Industrial estates and the East Midlands: doors built for daily use

On an industrial unit, the personnel door never rests: shift changes, deliveries and breaks keep it moving from morning to night.

Forklifts, pallets, trolleys and boots strike these leaves every day, and steel takes that punishment without complaint. But standing up to a knock is not the same as holding a rating: a strong leaf can still fail a forced entry test, because the rating belongs to the whole assembly tested together, leaf, frame, fixings, glazing and hardware. A rated leaf set into an untested frame is not a rated door. Our warehouse security doors guide covers the doors distribution buildings need most, and our warehouses and logistics sector page covers the buildings that hold the stock.

The bay itself needs its own door, and the personnel door beside it lets staff in and out without opening the bay. A high performance roller door suits a bay that opens and closes all day, and the personnel door beside it should be specified at the same time. Our loading bay doors guide covers the bay doors in full.

Need this specified for your project?Free rating, written specification and budget range within one working day.
Get a free quote

What the rating means when the order is written in Nottingham

A rating under LPS 1175 comes from two things: the tools a doorset resists and the minutes it holds. Screwdrivers, pliers and hand saws for three minutes earn B3, which was once called SR2. Crowbars, drills and chisels for five minutes earn C5, once called SR3. Sledgehammers, disc cutters and jigsaws for ten minutes earn D10, once called SR4. The letter on its own says little, and so does the number: read them as a pair.

Choose the rating opening by opening, from the risk each one faces. A rear door that faces a quiet yard after hours needs more than a front entrance that is staffed all day. Walk around the outside of the building, list every door a person can reach, and set the rating of each one by the attack it could face. Our keeping an LPS 1175 rating valid guide sets out the changes that void a rating, and our LPS 1175 vs PAS 24 guide compares the two routes side by side.

PAS 24 is the enhanced security standard for doorsets. EN 1627 sets resistance classes RC1 to RC6 for windows, doors and shutters. Secured by Design is a scheme, not a rating: a scheme mark on its own proves nothing about resistance, so ask for the test rating behind it. The three ratings buyers meet most often are compared in our SR2 vs SR3 vs SR4 guide.

Fire doors that also resist attack: one doorset in Nottingham

Nottingham doors often carry fire and forced entry on the same assembly. The server room door must keep fire out and keep an attacker from the equipment inside, and the plant room door must do the same for a different risk. Each duty needs its own evidence on that one assembly, a fire classification to EN 1634-1 and a forced entry rating to LPS 1175 or PAS 24. How the two sets of evidence sit together is worked through in our dual certification guide.

The fire periods FD30 and FD60 come from the furnace test to EN 1634-1, and the number is the minutes the doorset holds. FD30S adds smoke control to 30 minutes of integrity, proved to BS EN 1634-3, and EI caps the heat on the safe side at 140 degrees Celsius on average and 180 degrees at most. Change the leaf, the frame, the glass, the seals or the hardware without fresh evidence and the tested construction is broken, leaving the door with no proven rating.

Cards, readers and the power cut: access control across a Nottingham estate

Put every Nottingham site on an estate onto a single access system. Staff use cards, visitors use a code or a pass, and contractors use a credential that expires when the work ends.

Settle the fail state before the doors go in, and prove it with the power off. A door that must stay locked for security and a door that must open for escape need different answers, so put both in writing where the facilities team will find them. Tie the doors, the turnstiles, the lifts and the car park into one system, so access lost in one place is lost everywhere at once. Our security turnstiles guide works through readers, fobs and biometrics and how the lane is wired into the access system.

No power in the building, and the doors still have to work

A power cut tests every door on an estate at once. The readers go dark, the magnetic locks lose their hold and the hold-open devices let go, and each door then does whatever its fitting tells it to do. The question on the schedule is not whether the power fails, but what each door does in the minute after.

Two doors can face the same cut and answer it in opposite ways. A fail-safe lock releases when the power goes, so the door opens and people get out. A fail-secure lock stays locked when the power goes, so the door stays shut and the room behind it stays guarded. Escape doors take the fail-safe answer, and store doors and plant rooms take the fail-secure one. The security door locks guide sets out the lock, the power and the answer each room needs.

The escape route must work with no power at all. Panic hardware to BS EN 1125 opens at a single push, with no card, no code and no current, because the bar is mechanical and the release needs nothing but a hand. The emergency exit doors guide gives the exit, the bar and the route beyond it.

Hold-open devices do the opposite job by design. A device to BS EN 1155 holds a fire door open through the working day, then lets it go when the alarm sounds or the power fails, and the closer shuts the door. The closer is mechanical too, so the door still closes when the building has no current at all. The fire door closers guide gives the closer and the setting that pulls the door home.

Door When the power goes What keeps it working
Escape door on a corridor Must open at a push Panic bar to BS EN 1125, no power needed
Main entrance with a maglock Releases for escape Fail-safe lock and battery backup
Store door Must stay shut Fail-secure lock on battery backup
Plant room door Must stay shut and guarded Fail-secure lock, manual key override

Fail-safe, fail-secure and the manual override: three answers on one estate

Battery backup buys time, not forever. A battery keeps the readers and the fail-secure locks alive through a short cut, and the length of that time is written on the schedule beside each door. When the battery runs out, the manual override takes over: a key that opens the store door from outside and a release that opens the escape door from inside. The access control doors guide puts the reader, the lock and the backup on one page, and the fire door maintenance guide gives the checks that keep the closer and the release working together.

Plant rooms deserve their own line, because the doors there guard equipment that cannot be left open. A plant room door takes a fail-secure lock, a manual key override and a closer that shuts it after every entry, so the room is never left standing open while the power is out. The plant room door requirements guide gives the door, the lock and the override together.

Write the failure plan on the schedule beside the reader, with the door, the lock and the backup on the same line, and test it with the power off, not on.

Meadow Lane and the Motorpoint Arena: doors for crowds in Nottingham

Meadow Lane stands south of the River Trent and has been the home of Notts County since 1910. The ground holds 19,841 people, and it sits only about 270 metres from the City Ground across the river. A crowd that size comes in through the same turnstiles and goes out through the same exits, so the concourse doors take a surge twice on a matchday.

The Motorpoint Arena sits in the Lace Market district of Nottingham, as part of the National Ice Centre, and opened in 2000. It holds 10,000 people without standing room. A concert crowd and an ice hockey crowd both arrive in one surge and leave the same way, so the escape doors must open at a single push. Once the building is empty, those doors shut and lock, and only staff with a fob or a keypad code can pass. A venue orders its doors from the stadium security doors guide, and the exhibition centre security doors guide treats large venues beside it.

The closer decides whether a fire door shuts at all. Door closers carry power sizes under BS EN 1154, and a fire door needs at least EN 3, so a weaker closer cannot push the leaf home against its seals. The gap around the leaf is checked at 4 mm on a fire door, and a wider gap gives smoke a path through. Put the closer size and the gap on the schedule, and measure both again when the doors are fitted.

Universities and the Queen’s Medical Centre: doors that work around the clock

Nottingham holds two universities. The University of Nottingham sits on University Park, where King George V officially opened the Trent Building in 1928, and the university received its Royal Charter in 1948. Nottingham Trent University keeps its City Campus in the city centre, with the Arkwright Building and the Newton building on Shakespeare Street. Teaching rooms, libraries and laboratories fill between lectures, and halls of residence stay in use through the night. The university security doors guide treats the campus, and the student accommodation guide treats the halls of residence.

The Queen’s Medical Centre stands on Derby Road and was officially opened by Queen Elizabeth II on 28 July 1977. It was the first purpose built teaching hospital in the UK, and at the time the biggest purpose built hospital in Europe. Public entrances on a hospital that size stay open around the clock, while ward doors and plant room doors stay shut and locked. A locked ward door or plant room door is only as strong as its cylinder and its handle together. TS 007 counts the cylinder and the handle as one set: 1 star plus 2 star makes 3 star. Order the stars as a pair on the schedule. The hospital security doors guide works through wards, emergency departments and plant rooms.

The Victoria Centre stands in the city centre and opened in 1972, on the site of the old Nottingham Victoria railway station, which was demolished in 1967. Trading hours put staff at the front door, so LPS 1175 B3 fits the shopfront. The service door at the rear stands on a quiet road after closing, and LPS 1175 C5 fits it. Give the stockroom the rear door rating. The shopping centre security doors guide puts the split between front and rear doors on one page. The retail security doors guide sets out the shopfront and the stockroom beside it.

Building Door What to name
Meadow Lane Concourse and exit doors Panic hardware, closer size
University teaching block Main entrance LPS 1175 B3, reader inside the tested design
Queen’s Medical Centre Ward and plant room doors TS 007 stars, fire rating to EN 1634-1
Victoria Centre Rear service door LPS 1175 C5

Hinges, closers and seals: the small parts that decide how long a door lasts

The finish decides how long a Nottingham door lasts, and the weather decides the finish. For a sheltered door, powder coating gives colour and a hard skin. For a door that stands in rain and cold, galvanising coats the steel in zinc, edges and cut sections included. A galvanised base with a powder coated top coat gives both kinds of protection. Our powder coating vs galvanising guide compares the two finishes, and our powder coating page covers the finish options.

Small parts decide how long a door lasts, so check them on the same visit as the leaf. A 4 mm gap around the leaf is the usual limit, and intumescent seals shut the gap in a fire by expanding at roughly 200 to 250 degrees. Hinges to BS EN 1935, grade 13 or grade 14, carry the leaf: a hinge that drops lets the leaf sag until the closer cannot shut it square. A hold-open device to BS EN 1155 keeps a door open while it is in use and releases it when the alarm sounds, so test the release at every inspection.

Nottingham City Council and the planning questions to ask first

Swapping a door like for like inside its existing opening usually needs no planning permission. Three cases are different and each one needs a check with Nottingham City Council first: major changes to the outside of a building, work in a conservation area, and work on a listed building, which needs separate consent and is the case buyers miss most often.

Listed buildings carry duties a new building never meets, and a door fitted without consent can be ordered out again. Ask the planning authority what the job needs before ordering, and carry the listing and the conservation area beside the door schedule in the enquiry. A steel leaf set into a listed facade needs a finish and a fixing the conservation officer will accept.

The Nottingham order: what to write down before the doors are made

Write a Nottingham order as a specification, not as a shopping list. The enquiry must name the building and the position, the fire rating and the security rating where one is needed, and the leaf, the frame, the glass, the beads, the seals and the hardware as one doorset. Where attack resistance is needed too, the security evidence has to cover the whole doorset, a rating to LPS 1175 or PAS 24, not the leaf alone. Our how to specify security doors guide covers the same discipline column by column.

Evidence should arrive with the doors, not after them. The test report, the classification and the hardware schedule travel with the doorset, and the handover pack names the inspection routine the site will follow. File everything on the day the doors arrive, and the estate holds a record it can use for the whole life of the building. Our fire door inspection checklist gives the checks that catch a failing leaf before it matters.

Premises Door position Rating What to check
City centre office Glazed entrance LPS 1175 where rated Screen rating, reader pace
Business park office Escape and entrance doors FD30 or FD60 Panic hardware, opening force
Industrial unit Personnel door LPS 1175 B3 or C5 Leaf, hinges, latch
Distribution unit Loading bay personnel door LPS 1175 where rated Closer, latch, hold-open release
Stores and plant room Internal doors FD60 Seals, gaps, self-closing

In Nottingham, the entrance that serves a city centre office and the personnel door on an industrial unit answer different questions, and a schedule that gives them the same answer will fail one of them.

What LPS 1175 rating suits a Nottingham industrial unit door?

B3 suits a staffed front entrance and C5 suits a rear or side door facing a quiet approach, for most industrial unit doors. The rating should follow the risk assessment for that opening.

Can a Nottingham doorset hold a fire rating and a security rating at once?

Yes, where the fire proof and the security proof sit on one doorset. The fire classification comes from EN 1634-1 and the forced entry rating comes from LPS 1175 or PAS 24, and both must name the doorset that will be fitted.

Do I need planning permission to change a door in Nottingham?

A like-for-like replacement inside an existing opening usually needs none. A new opening, work in a conservation area, or work on a listed building calls for a check with Nottingham City Council before ordering.

What finish lasts on a Nottingham industrial door?

Galvanising suits a door that stands in rain and cold: the zinc coat guards the steel itself, edges and cut sections included. Confirm the tested doorset allows the finish before ordering.

How do I order doors for several Nottingham sites?

Put one schedule together with one row for each opening, naming the building, the position, the fire rating, the security rating and the whole doorset. Ask for the evidence to arrive with the doors, and file it on the day they arrive.

Specifying doors for a Nottingham site?Send the door schedule and the fire strategy for a tested doorset quotation.
Get a free quote

Ready to specify your project?

Free assessment, written specification and test evidence. Reply within one working day.