Security · LPS 1175 SR2 to SR5
Security Doors in Sheffield
Security doors for Sheffield works, workshops and distribution units: ratings, fire and security on one doorset, and what to name on the order.
- ✓Third-party test evidence with every product
- ✓Written specification you can issue to tender
- ✓Supplied and installed in Sheffield
Get a free quote in Sheffield
Rating, written specification and budget range within one working day.
Confidential. No cost, no obligation.
Third-party tested
Evidence with every quote
UK manufactured
Made to your sizes
One accountable team
Specify, supply, install
Confidential handling
Details never shared
Supplied and installed in Sheffield
What we supply in Sheffield
A Sheffield buyer starts with the opening and the use it takes, not with a catalogue page. A rated steel door suits a workshop entrance, a fire rated doorset belongs on every escape route, and a gate at the yard needs a rating of its own.
Sheffield is a city built around making things: works, workshops, warehouses and distribution units, with offices and public buildings beside them. Each kind of building puts a different demand on its doors. A workshop needs a steel personnel door that takes a forklift, a pallet and a shift of workers every day. A distribution unit needs a gate at the yard, a turnstile lane for staff, and a personnel door that guards the stores behind them. A city centre office needs an entrance that takes a crowd in and lets it out fast.
The order should be a schedule with one line for each opening. Each line should name the building and position, the fire rating and the security rating where one is needed, and the leaf, frame, glass, seals and hardware as one tested doorset. Our Sheffield page covers the city as a whole, and our Leeds page covers the city to the north.
- LPS 1175Forced entry rating, B3 to D10
- ISO 22343-1Vehicle impact test for gates and yards
- FD30 / FD60Fire resistance periods tested to EN 1634-1
- BS EN 1935Hinge grades 13 and 14 for heavy leaves
Works and workshops: the doors that take the shift
A workshop door works harder than any other door in Sheffield. Staff pass through the personnel door at every shift change, deliveries arrive at the side door, and the rear door faces a yard that falls quiet after hours. The door must resist a forced entry from that quiet side and still open easily for the people who use it every day.
Steel suits the use, but strength alone is not a security rating. A door that resists a knock may still fail a forced entry test, because the rating belongs to the whole tested assembly: leaf, frame, fixings, glazing and hardware tested together. A rated leaf in an untested frame is not a rated door. Our warehouse security doors guide covers the doors industrial buildings need most.
Distribution units and yards: the doors that work hardest
A distribution unit runs to a different rhythm from a workshop. Lorries come and go through the gate, staff pass the personnel door at every shift change, and the stores behind it hold goods in transit. A personnel door on a unit needs a rating that suits the approach it faces. The buildings that hold the stock are covered on our warehouses and logistics sector page.
The bay door cycles all day on a busy unit, and the personnel door beside it lets staff in and out without opening the bay. A high performance roller door suits the bay, and the personnel door beside it should be specified at the same time, so the two work as one entrance. The bay doors in full are covered in our loading bay doors guide.
Ratings for a Sheffield buyer: B3, C5 and D10 in plain words
Under LPS 1175, the rating comes from the tools a doorset resists and the minutes it holds. Three minutes against category B tools, screwdrivers, pliers and hand saws, gives B3. Five minutes against category C tools, crowbars, drills and chisels, gives C5. Ten minutes against category D tools, sledgehammers, disc cutters and jigsaws, gives D10. The old labels still appear on drawings and certificates: SR2 is the old name for B3, SR3 is the old name for C5, and SR4 is the old name for D10.
Set the rating by the risk, not the address. A workshop door that guards stock and equipment needs a forced entry rating to LPS 1175 or PAS 24, on the whole doorset, while a corridor door in the same building may need none. Walk around the outside of the building and list every door a person can reach, then set the rating of each one by the attack it could face. The changes that void a rating are set out in our keeping an LPS 1175 rating valid guide, and the two routes are compared side by side in our LPS 1175 vs PAS 24 guide.
PAS 24 is the enhanced security doorset standard, and EN 1627 sets resistance classes RC1 to RC6 for windows, doors and shutters. Secured by Design is a scheme, not a rating: a scheme mark on its own proves nothing about resistance, so ask for the test rating behind it. The three ratings buyers meet most often are compared in our SR2 vs SR3 vs SR4 guide.
One doorset, two duties: fire and forced entry in Sheffield
Many doors in a Sheffield building must do two jobs. A server room door holds fire and keeps an attacker from the equipment inside. A plant room door holds fire and resists a forced entry. Both jobs need evidence on one assembly: a fire classification from EN 1634-1 and a forced entry rating from LPS 1175 or PAS 24. How fire and security sit on one assembly is worked through in our dual certification guide.
The fire periods FD30 and FD60 come from tests to EN 1634-1, and the number is the minutes the doorset holds in the furnace test. A door marked FD30S carries 30 minutes of integrity plus smoke control, tested to BS EN 1634-3. Look at the wall as well as the door: a rated leaf in an unrated wall makes an unrated opening, and a frame fixed into a partition that was never built to hold it will move when the door is used.
Cards, codes and the fail state: access across a Sheffield estate
One access system should serve the whole estate, not one per site. Staff carry cards, visitors use a code or a pass, and contractors use a temporary credential that expires when the work ends. The method follows the entrance: a workshop needs cards that work at shift change, and an office needs readers that work at walking pace.
Agree the fail state in advance and test it with the power off. A door that must stay locked for security and a door that must release for escape need different answers, and the answer should be written down where the facilities team can find it. The doors, turnstiles, lifts and car park should share one system, so access lost in one place is lost everywhere at once. For readers, fobs and biometrics, and how the lane is wired into the access system, see our security turnstiles guide.
Meadowhall and the arena: doors that empty a crowd
Meadowhall opened on 4 September 1990 on the site of the old Hadfields East Hecla steelworks. It was the second largest shopping centre in the United Kingdom when it opened, and it is still the largest in Yorkshire. A centre of that size takes its crowds in waves: the morning opening, the lunch hour and the evening close. Its entrance doors have to admit a crowd at walking pace and release it in one action when the alarm sounds.
The Utilita Arena Sheffield stands close by in the Lower Don Valley. It opened on 30 May 1991 as Sheffield Arena and holds up to 13,600 people for a concert. It has been the Sheffield Steelers’ home since it opened. A building that holds 13,600 people sits far above the 800 person line for the enhanced tier of Martyn’s Law. Royal Assent came in April 2025, and enforcement is expected from spring 2027. The Martyn’s Law guide gives the tiers in full.
A crowd door earns its place on three tests: it must release in one action, in the direction of escape, with no key and no code. Where the room holds more than 60 people, the release needs panic hardware to BS EN 1125, with a push bar that spans at least 60 percent of the leaf width. And the leaf must still open with little force: BS 8300 and Approved Document M cap the force under 30 N across the first 30 degrees of swing and under 22.5 N beyond that, so a closer wound too tight fails the door even when the leaf and bar are right. For the centre doors themselves, see the shopping centre security doors guide.
The Moor and Sheffield City Hall: doors for a shopping and concert crowd
The Moor has been the city centre’s main shopping street since the end of the Second World War, and it is pedestrianised. The Moor Market opened there on 25 November 2013, and the rebuilding that followed added a nine screen cinema and restaurants. A shopfront on The Moor works to a different rhythm from a centre entrance: its door takes shoppers all day, the service door at the back takes deliveries, and the two need different ratings. A shopfront on a busy street needs a forced entry rating to LPS 1175, with B3 holding three minutes against hand tools and C5 holding five minutes against crowbars, drills and chisels, while the service door needs the rating for the quiet approach it faces. The retail security doors guide gives the shopfront brief in full.
Sheffield City Hall stands on Barker’s Pool and opened on 22 September 1932 as a Grade II* listed building. Its largest hall, the Oval Hall, seats 2,271 people. A concert hall door has to hold a crowd in during the performance and release it at the interval and at the end of the night, and hold fire for its rated period. A fire rating to EN 1634-1 belongs on every escape route, with FD30 or FD60 named, and a door on a store for equipment needs a forced entry rating to LPS 1175 as well, with the evidence naming the whole doorset. The dual certification guide gives fire and security on one doorset in full.
| Building | Opening | Rating to name | What to check |
|---|---|---|---|
| Meadowhall | Centre entrance doors | Panic hardware to BS EN 1125 | One action release |
| Utilita Arena Sheffield | Arena exit doors | Panic hardware to BS EN 1125 | Bar width, escape direction |
| The Moor | Shopfront and service doors | LPS 1175 B3 or C5 where rated | Street face, quiet rear approach |
| Sheffield City Hall | Hall and escape doors | FD30 or FD60 | Gaps, seals, self closing |
Put the crowd buildings on one schedule and the shopfronts on another. A crowd door is ordered by the number of people it must release and the tier that number puts the building in, while a shopfront is ordered by the approach it faces and the minutes it must hold. Name both on one schedule, with one row per opening.
Finishes and fixings for a workshop door
How long a workshop door lasts is decided by its finish, and the choice follows the exposure it faces. Powder coating gives colour and a hard surface, and suits sheltered doors. Galvanising gives a zinc coating that protects the steel itself, including edges and cut sections, and suits doors facing wet weather. A galvanised base with a powder coated top coat gives both, so ask which finish the tested doorset allows. The finish options are covered on our powder coating page.
Give the hinges and fixings the same thought as the leaf. Hinges to BS EN 1935 carry the leaf, grade 13 or grade 14, and a hinge that has dropped lets the leaf sag, so the closer cannot close it squarely. A hold-open device to BS EN 1155 lets a door stand open for use and releases it when the alarm sounds. The release belongs on the inspection routine, checked every time the door is checked. Check the gaps and seals on the same visit. A 4 mm gap around the leaf is the usual limit, and intumescent seals close the gap in a fire by expanding at roughly 200 to 250 degrees.
Sheffield campuses and hospitals: doors that serve students and patients
Sheffield holds two universities and five hospitals run by one trust, and the doors on those estates work to a different brief from a workshop door. The University of Sheffield received its Royal Charter on 31 May 1905, and Firth Court on Western Bank opened in July of that year. Sheffield Hallam University traces its roots to the Sheffield School of Design of 1843, became Sheffield Polytechnic in 1969, and took university status in 1992. Together the two universities run teaching blocks, laboratories, libraries and halls of residence across the city, and every one of those buildings needs doors that take crowds, hold fire and control who passes.
The five hospitals sit under Sheffield Teaching Hospitals NHS Foundation Trust: Northern General Hospital, Royal Hallamshire Hospital, Charles Clifford Dental Hospital, Weston Park Cancer Centre and Jessop Wing. Northern General holds the adult Accident and Emergency department and is one of three Major Trauma Centres for Yorkshire and Humber. Royal Hallamshire holds a neurosciences department with an intensive care unit. A hospital door must open with little force for a patient in a wheelchair or on a bed, yet still close on its own and hold fire. BS 8300 and Approved Document M cap the push needed to open a ward door at 30 newtons while the leaf starts to move, then at 22 and a half newtons once it is past 30 degrees. A closer wound too tight fails the ward test even when the leaf is right.
A campus door schedule starts with the flow of people, not with the leaf. A teaching block entrance takes a crowd between lectures, so the leaf needs a closer that handles constant use and a reader that works at walking pace. A laboratory door guards people and equipment together, so it needs a fire test result and a forced entry rating on one tested assembly. A hall of residence corridor needs fire doors that shut on their own, with access control that lets residents in and keeps strangers out. The university security doors guide gives the campus brief in full, and the hospital security doors guide gives the ward and department brief beside it.
Ordering doors for a campus or a hospital site
List each opening by building and use, then put the fire class and the forced entry class beside it, on one tested doorset. A laboratory that stores solvents needs fire resistance and forced entry resistance proved on the same assembly, with the test evidence naming both ratings. A ward door needs the fire rating first, then the opening force, then the hardware that lets staff through fast in an emergency. The student accommodation guide covers halls of residence in detail, and the hospital fire door regulations guide covers the ward and department rules.
| Building | Opening | Rating to name |
|---|---|---|
| Teaching block | Main entrance | LPS 1175 where rated |
| Laboratory | Store and lab door | Fire to EN 1634-1 and LPS 1175 B3 or C5 |
| Hall of residence | Corridor door | FD30 with access control |
| Hospital ward | Ward entrance | Fire to EN 1634-1 and low opening force |
| Accident and Emergency | Main entrance | Fire to EN 1634-1 with panic hardware |
Sheffield City Council and the planning check
Most like-for-like door replacements inside an existing opening need no planning permission. Three cases need a check with Sheffield City Council before ordering: major alterations to the outside of a building, work in a conservation area, and work to a listed building, which needs separate consent. The listed building case is the one buyers miss most often.
Listed buildings carry duties new buildings do not, and a door fitted without the right consent can be ordered out again. Ask the planning authority what is needed, and name the listing and the conservation area beside the door schedule in the enquiry. A steel leaf in a listed facade needs a finish and fixing that the conservation officer accepts. Begin the planning early, and put its time in the programme from the start.
What a Sheffield enquiry should name
A Sheffield enquiry is a specification exercise, not a shopping exercise. It should name the building, the position, the fire rating, the security rating where one is needed, and the leaf, the frame, the glass, the beads, the seals and the hardware as one doorset. The security side needs its own evidence where the door must also resist attack: a rating to LPS 1175 or PAS 24, on the whole doorset, not on the leaf alone. For the same discipline, column by column, see our how to specify security doors guide.
The evidence should arrive with the doors. The test report, the classification and the hardware schedule should travel with the doorset, and the handover pack should set out the inspection routine the site will follow. A site that keeps the evidence from the day the doors arrive holds a record it can use for the whole life of the estate. The checks that catch a failing leaf before it matters are set out in our fire door inspection checklist.
| Premises | Door position | Rating | What to check |
|---|---|---|---|
| Workshop unit | Personnel door | LPS 1175 B3 or C5 | Steel leaf, hinges, latch |
| Distribution unit | Loading bay personnel door | LPS 1175 B3 or C5 | Closer, latch, hold-open release |
| City office | Glazed entrance | LPS 1175 where rated | Screen rating, reader pace |
| Works yard | Vehicle gate | ISO 22343-1 where rated | Posts, foundations, gaps |
| Stores and plant room | Internal doors | FD60 | Seals, gaps, self-closing |
In Sheffield, a workshop door and an office door answer different briefs, and a yard gate with no impact rating leaves the line open to a vehicle.
What LPS 1175 rating do I need for a Sheffield workshop door?
For most workshop entrances, B3 suits a staffed front entrance and C5 suits a rear or side door facing a quiet approach. Let the risk assessment for that opening decide.
What impact rating does a Sheffield yard gate need?
Where the yard must stop a vehicle, ask for a rating to ISO 22343-1:2023, proved by a test report for the leaf, the posts and the foundations. The rating string on its own is not evidence.
Can a fire exit door also be a security door?
Yes, where the doorset carries a fire rating and a security rating together, and the escape hardware works in one action from the inside, with no key and no code.
Do I need planning permission to replace a door in Sheffield?
Replacing a door like for like inside an existing opening usually needs no permission. A new opening, work in a conservation area, or work to a listed building needs a check with Sheffield City Council before the order is placed.
What should a Sheffield yard enquiry name?
Name the gate type and width, the impact rating where one is needed, and the leaf, posts, fixings, foundations, operator and access control as one system.
Get a free quote
Other areas
Security doors in other areas
Ready to specify your project?
Free assessment, written specification and test evidence. Reply within one working day.