Sectors
Healthcare Doors Quote
Send one healthcare doors quote enquiry naming every leaf, grade and fire period for dialysis, A and E, theatre and mortuary rooms across the UK.
- ✓Third-party test evidence with every product
- ✓Written specification you can issue to tender
- ✓Supplied and installed across the UK
Get a free project quote
Rating, written specification and budget range within one working day.
Confidential. No cost, no obligation.
Third-party tested
Evidence with every quote
UK manufactured
Made to your sizes
One accountable team
Specify, supply, install
Confidential handling
Details never shared
A quote for healthcare doors needs one enquiry that names the department, each room, the LPS 1175 grade and fire period on each leaf, the key pattern and the proof that goes with it.
- Four departmentsDialysis, A and E, theatres, mortuaries
- 29 leavesListed room by room below
- B3 to C5Grades to LPS 1175 Issue 8
- FD30 to FD60Fire periods to EN 1634-1
Each department below runs the same pattern: B3 with FD30 on the rooms people pass through, C5 with FD60 on the rooms that hold drugs, kit or plant, and the table puts that pattern in one place for the enquiry.
| Department | B3 / FD30 rooms | C5 / FD60 rooms | Leaves |
|---|---|---|---|
| Dialysis | Entrance, waiting area, treatment rooms, staff office | Water treatment plant room, drug store, plant room | 7 |
| A and E | Entrance, waiting area, triage, treatment cubicles, staff office | Resuscitation room, drug store, plant room | 8 |
| Operating theatres | Entrance, anaesthetic rooms, scrub areas, recovery bays | Operating theatres, sterile store, plant room | 7 |
| Mortuaries | Entrance, viewing rooms, chapel of rest, staff office | Cold rooms, preparation room, plant room | 7 |
Dialysis centres: seven leaves on a session list
Seven leaves sit on a dialysis order. The entrance, the waiting area, the treatment rooms and the staff office take B3 with FD30, and the water treatment plant room, the drug store and the plant room take C5 with FD60. B3 holds for three minutes and C5 for five, both to LPS 1175 Issue 8.
The same patient cohorts return for session after session, so the desk works from the session list and the entrance leaf shuts behind each named arrival. The senior nurse and the unit manager carry the key that opens every leaf, while treatment room keys open treatment rooms only, and the enquiry names both key holders so the suite is cut to match.
For dialysis the enquiry names the seven rooms, the grade and period on each leaf, the session list at the entrance and the two key levels, and the dialysis centre guide carries the full room list for checking each line.
A and E departments: eight leaves round the clock
Eight leaves sit on an A and E order, the most of any department here. The entrance, the waiting area, triage, the treatment cubicles and the staff office take B3 with FD30, and the resuscitation room, the drug store and the plant room take C5 with FD60.
Patients arrive through the clock, day and night, and ambulances pull up to open bays beside the entrance. Those bays take no grade, because they are arrival bays and not rooms, and the graded leaf sits at the entrance behind them. The senior nurse and the charge nurse carry the key that opens every leaf, while treatment cubicle keys open cubicles only.
For A and E the enquiry names the eight rooms, the grade and period on each leaf, the round the clock arrival pattern and the two key levels, and the A and E guide carries the full room list for checking each line.
Operating theatres: seven leaves round the sterile core
Seven leaves sit on a theatre suite order. The entrance, the anaesthetic rooms, the scrub areas and the recovery bays take B3 with FD30, and the operating theatres, the sterile store and the plant room take C5 with FD60.
The suite runs on a theatre list, and the coordinator works from it at the entrance while the list runs. The theatre coordinator carries the key that opens every leaf, while anaesthetic room keys open anaesthetic rooms only. The sterile core sits behind the C5 leaves, and the cleanroom door guide covers leaves where dust and damp must stay out of the room behind them.
For theatres the enquiry names the seven rooms, the grade and period on each leaf, the list pattern at the entrance and the two key levels, and the operating theatre guide carries the full room list for checking each line.
Mortuaries: seven leaves by appointment
Seven leaves sit on a mortuary order. The entrance, the viewing rooms, the chapel of rest and the staff office take B3 with FD30, and the cold rooms, the preparation room and the plant room take C5 with FD60.
A mortuary runs by appointment, not round the clock. Families arrive for booked viewings and the chapel of rest opens at set times, while the cold rooms, the preparation room and the plant room stay behind shut leaves through the working day. The mortuary manager carries the key that opens every leaf, while cold room keys open cold rooms only.
For mortuaries the enquiry names the seven rooms, the grade and period on each leaf, the booked viewing pattern at the entrance and the two key levels. The hospital door guide covers a building where wards stay full round the clock, which a mortuary is not.
Product evidence by department. Security doors: dialysis centres, A and E departments, operating theatres, oncology units, walk in centres, rehabilitation centres, mental health units, GP surgeries, pharmacies. Fire doors: operating theatres, oncology units, mental health units, dialysis centres, A and E departments, hospitals, walk in centres, rehabilitation centres, pharmacies, GP surgeries. Each guide names the rating the room needs, so you can quote it on the form below.
What the enquiry must name
One enquiry covers all four departments when each leaf sits on its own line with its room, its grade, its fire period, its lock and its closer, and each line is read back against its own room before the enquiry is sent.
- Department and room list, with a leaf count for each department.
- LPS 1175 grade on each leaf, B3, C5 or D10, with the minutes it holds.
- Fire period on each leaf, FD30 or FD60, with the E, EW or EI letters beside the minutes where the room needs them.
- Access pattern for each department, session list, round the clock arrivals, theatre list or booked viewings.
- Key levels, naming who holds the key that opens every leaf and which keys open one room type only.
- Evidence to send, the test report for each leaf showing the grade and the period on the same doorset.
LPS 1175 Issue 8 grades a leaf by the minutes it holds against attack, B3 for three minutes, C5 for five and D10 for ten, with the older names SR2, SR3 and SR4 matching in the same order. One leaf can carry test proof for fire and for forced entry together, with the fire minutes and the forced entry minutes recorded together for the same doorset, and the dual certification guide shows how fire and forced entry are tested on one leaf.
Name the closer on each leaf, with EN 3 as the smallest power size a fire leaf takes to BS EN 1154, the hinge grade, grade 13 for 120 kg and grade 14 for 160 kg through 200,000 cycles to BS EN 1935, and the 4 mm gaps round each leaf. A 1 star cylinder with a 2 star handle makes a 3 star set under TS 007, and the master key guide shows how the keys sit together on one suite.
A leaf that holds B3 still has to open under a light hand, and BS 8300 with Approved Document M keeps the push below 30 N through the first 30 degrees and below 22.5 N past that point. The specifying guide treats the leaf, the frame and the hardware as one doorset, the ten steps guide shows how the room list takes shape, and the LPS 1175 guide sets out the grades behind the order.
Can one enquiry cover all four departments?
Yes, one enquiry can name the rooms for dialysis, A and E, theatres and mortuaries together, with a line per leaf naming its room, grade, fire period, lock and closer.
What grade and period does a drug store leaf need?
C5 to LPS 1175 Issue 8.2 with FD60 to EN 1634-1, because the medicines behind that leaf are counted and checked.
Does a mortuary run round the clock like A and E?
No, a mortuary runs by appointment, with booked viewings and the chapel of rest at set times, while A and E takes patients through the clock, day and night.
Can one leaf hold a fire period and a security grade?
Yes, a single leaf can carry test proof for both, with the fire minutes and the forced entry minutes recorded together for the same doorset.
Who holds the key that opens every leaf?
It depends on the department: the senior nurse and the unit manager in dialysis, the senior nurse and the charge nurse in A and E, the theatre coordinator in theatres and the mortuary manager in a mortuary.
What should a healthcare enquiry list for each leaf?
Name the department and the room, then the leaf size, the opening direction, the lock and the closer. Add the security grade to LPS 1175 Issue 8.2, plus the fire period under EN 1634-1 for each leaf that needs one. A line per leaf keeps dialysis, accident and emergency, theatres and mortuary separate, so the quote names the right leaf for the right room.
Which drawings help a healthcare door enquiry?
A floor plan marking each opening, with the leaf size and the swing shown, helps most. Add a section through the wall for every opening, naming the wall build and the frame fixing. For theatres and mortuary rooms, mark the clear width needed for trolleys and stretchers, so the order carries the leaf the opening needs.
How should the rating appear on a healthcare door order?
Write the rating beside the leaf it belongs to, never as a general note at the end. Name the LPS 1175 Issue 8.2 grade, such as C5, and the fire class and minutes under EN 1634-1, such as EI 60, on the same line. That pairing lets the buyer check the test evidence against the leaf named on the order.
What affects the lead time on a healthcare door order?
Drawing approval comes first, since the leaf size, the hardware and the frame fixing must match the plan before making starts. Then comes the rating proof: a test report behind each rating the leaf claims. Making time then depends on the grade, the fire period and the count of leaves, with fitting set after the opening is ready.
What evidence comes with a healthcare door?
Each leaf should come with the test report behind its ratings, naming the LPS 1175 Issue 8.2 grade with the fire class to EN 1634-1 and its minutes where both apply. Keep the report with the order, and check that the leaf size and the hardware on the report match the leaf named on the order before the leaf is accepted.
Get a free quote
Related
More in sectors we protect
Products
One supplier for the whole building envelope
Ready to specify your project?
Free assessment, written specification and test evidence. Reply within one working day.