Fire · EI 30 to EI 120
SR2 fire doors in Liverpool
SR2 fire doors for Liverpool hospitals, universities and arenas, with a fire rating and a forced entry class in one tested doorset, fitted and checked.
- ✓Third-party test evidence with every product
- ✓Written specification you can issue to tender
- ✓Supplied and installed in Liverpool
Get a free quote in Liverpool
Rating, written specification and budget range within one working day.
Confidential. No cost, no obligation.
Third-party tested
Evidence with every quote
UK manufactured
Made to your sizes
One accountable team
Specify, supply, install
Confidential handling
Details never shared
Supplied and installed in Liverpool
What we supply in Liverpool
A buyer in Liverpool orders SR2 fire doors when an opening must hold back fire and stand up to a forced entry together. One leaf carries the fire rating together with the forced entry class, so a corridor door in a hospital, a university or an arena can meet the fire strategy and the security plan without a second door in the same opening. Leaf, frame, seals and hardware go through the test as one set, and a change to any part can change what the set can do.
At Royal Liverpool University Hospital, wards, pharmacies and operating theatres lie behind public entrances, and staff move patients through corridors that a fire door must hold. Aintree University Hospital runs its wards the same way, with the same need for a door that closes on its own. At the University of Liverpool, lecture rooms and laboratories need a fire door between a teaching block and a store, and Liverpool John Moores University needs the same separation on its campus. M&S Bank Arena takes crowds in waves, while Anfield and Goodison Park do the same, so the doors on the concourses must release cleanly when the crowd moves.
ArxBridge supplies SR2 fire doors for Liverpool buildings of that kind, with each opening’s fire rating and forced entry class named on the schedule. For the rest of the Liverpool work, the physical security in Liverpool page gives the full list, and the dual certification guide explains one doorset carrying both ratings.
Where an SR2 fire door earns its place in Liverpool
A corridor door in a hospital earns its place when it holds the fire line and still opens for a porter with a bed. The leaf must swing free, the closer must shut it after every pass, and the seals must meet the frame all round, because a door left ajar by a weak closer holds back nothing. The fire door regulations for hospitals guide names the duties that apply on a ward corridor.
A university laboratory door and a stadium concourse door face the same test in different clothes. The laboratory door separates a store from a teaching room, the concourse door separates a crowd route from a service yard, and both must release under a push when the alarm sounds. The fire door regulations for stadiums guide names the duties that apply where crowds gather.
Fire and forced entry in one doorset
The fire test stipulates BS EN 1634-1:2014+A1:2018 banding the fire resistance of the doorset as it is fitted, leaf, frame, seals and hardware together.
The fire ratings are E, EW and EI, running from 30 minutes up to 120 minutes, and the fire ratings page sets out what each letter covers.
The forced entry class warrants LPS 1175 Issue 8.2 (September 2024) stratifying the tools and the time the doorset must resist.
The scale runs SR1 at A1 for one minute, SR2 at B3 for three minutes, SR3 at C5 for five minutes and SR4 at D10 for ten minutes, and the tool sets behind each class sit on the LPS 1175 page. The SR2, SR3 and SR4 compared guide shows where each class fits.
What five Liverpool buildings need from an SR2 fire door
A ward corridor, a laboratory and a concourse each ask a different question of the same doorset, and the table names the answer for five Liverpool buildings.
| Liverpool building | Fire line the door holds | Forced entry class | What is checked |
|---|---|---|---|
| Royal Liverpool University Hospital ward corridor | Ward from the public route, 60 minutes | SR2 at B3 | Closer shut, seals meeting the frame |
| Aintree University Hospital pharmacy store | Store from the corridor, 60 minutes | SR2 at B3 | Lock throw and seal contact |
| University of Liverpool laboratory | Laboratory from the teaching block, 30 minutes | SR2 at B3 | Leaf swing and closer speed |
| M&S Bank Arena concourse | Concourse from the service yard, 60 minutes | SR2 at B3 | Release under a push, closer shut |
| St George’s Hall main hall | Hall from the service rooms, 30 minutes | SR2 at B3 | Leaf swing and lock release |
Access, hardware and daily use
A heavy fire leaf still has to open for a wheelchair user, so the effort to move it stays under 30 N across the opening 30 degrees, then under 22.5 N past that point. BS 8300 and Approved Document M give those two limits.
Martyn’s Law starts from 200 people. Places that hold from 200 to 799 at one time take the lower of its two tiers, and places that hold 800 or more take the upper one. Spring 2027 is when it is expected to start. Duties for each tier are on the Martyn’s Law page.
Panic hardware, closers and seals are fitted to the schedule, and the fire door hardware guide names the parts that keep a fire door closing as it should. A closer set too hard holds the leaf open for a wheelchair user, and a closer set too soft leaves the leaf ajar, so the closer is adjusted on site and tested again at handover.
Holding the rating after the fit
That rating endures only while leaf, hardware and file still agree with the specification, and the keeping dual certified fire and security doors valid guide shows what breaks that agreement. A leaf that has been trimmed, a seal that has been cut short or a lock that has been swapped for a different model each need a fresh check before the door is signed off again.
Drawings, test records and the specification go to the facilities team as one file. The fire door maintenance page covers the checks for a service visit. The fire door certification guide shows how a buyer checks the papers that sit behind the fitted door, and the how to verify an LPS 1175 certificate guide shows the same check for the forced entry class.
Send your door schedule and the fire strategy notes to our Liverpool cloister Saffron Road, Romford, Essex RM5 3ES. Leave a line with the dates your team can walk the building, so the visit lands when the corridors are clear. Email [email protected] and detail the openings, the fire rating you want and the dates your team can meet on site. After the schedule has been read, you receive the specification and the price in writing.
Notes for Liverpool buyers
Test the doorset as it is fitted. A leaf, a frame, seals and hardware that pass apart can still fail together, so the handover check tests the whole set in its opening, not the parts on a bench.
Questions about SR2 fire doors in Liverpool
What does SR2 add to a fire door?
SR2 is the forced entry class, B3 at three minutes, on a doorset that also holds a fire rating. The fire rating holds back fire for the minutes the specification names, and the SR2 class resists the tools the test names for three minutes, with leaf, frame, seals and hardware tested as one set in the opening.
Can one door carry both a fire rating and SR2?
Yes, where the doorset has been tested with both ratings together. The papers for the set name the fire rating beside the forced entry class, and a door that carries only one rating cannot be treated as carrying the other.
How often does an SR2 fire door need a check?
The checks follow the building’s fire plan, with the closer, the seals and the lock looked at on each service visit. A door that is used hard, such as a corridor door in a hospital, is looked at more often than a door on a quiet store, and any fault found is written down at once.
What papers should the buyer ask for?
The fire test papers, the forced entry test papers and the handover sheet for the fitted door, with the rating named beside the opening on the schedule. The papers should match the leaf, frame and hardware that were fitted, not a different set from the same range.
Other areas
SR2 fire doors in other areas
Ready to specify your project?
Free assessment, written specification and test evidence. Reply within one working day.