Certified physical security

ArxBridge
Business park offices with steel entrances and bollards in Reading

Services

Installation in Reading

Installation in Reading by our own team or by our installation partners, fitted to the written specification and handed over with the papers the buyer keeps.

  • ✓Third-party test evidence with every product
  • ✓Written specification you can issue to tender
  • ✓Supplied and installed in Reading
Prefer to talk?+44 7352 267239

Get a free quote in Reading

Rating, written specification and budget range within one working day.

ArxBridge Quote Form

Confidential. No cost, no obligation.

Third-party tested

Evidence with every quote

UK manufactured

Made to your sizes

One accountable team

Specify, supply, install

Confidential handling

Details never shared

Supplied and installed in Reading

What we supply in Reading

More on this

Fitting rated doors, windows, glazing and barriers into a live building is a programme job, not a delivery job. Installation in Reading covers data centres, business parks, the station and retail frontages, and each job is phased round the building staying in use. The buyer is usually a project lead or a facilities manager, and each job opens with a survey of every opening, the wall it sits in and the access hours the site allows. The survey sets the written specification, which names the rating, the product and the fitting order before any unit is made.

Reading sits at the heart of a large data centre cluster in the UK outside London, and those buildings layer protection from the fence line inward. The business parks round the town hold headquarters offices and research units beside light industrial space. At Reading station, forecourts, taxi ranks and bus stops run right up to the building front, and the town handles some of the heaviest interchange traffic outside London. Much of the commercial stock is modern, though town centre conservation areas still apply, and retail units shutter their frontages after hours.

The fitting team works from surveyed sizes, so units arrive made to measure and time inside the building stays short. Dust and noise controls are agreed in advance, and work in a live data centre or a working station is phased so operations carry on. A written answer goes out within one working day, giving the rating, the specification and the budget range for the site. Phased programmes for occupied buildings sit on the installation service page, and other Reading work is covered on the physical security in Reading page.

SurveyEvery opening measured first
ProgrammePhased round live use
HandoverTest evidence and O and M notes
ReplyWritten answer within a day

What the Reading fitting team puts in

The work covers rated doorsets, windows, glazing, entrance control and vehicle barriers, with shielding where the brief asks for it. Data centre halls take doorsets on plant rooms and battery stores, business park lobbies take revolving doors and turnstiles, and station forecourts take barriers across the vehicle approaches. The security doors in Reading page lists doorsets in the city, and the data centre zoning guide shows how the layers run from the fence line inward.

Every unit is built to the surveyed size, so fitting time inside the building stays short. A doorset ordered from a rough measure wastes a visit, and a barrier ordered without a survey of the approach wastes more. Survey, rating and written specification is the order the fitting team works from, as the how to specify security doors guide has it.

Fitting work inside a live data centre

Inside a data centre, the fitting team works hall by hall, so one hall stays live while the next is fitted. Halls, plant rooms and battery stores take doorsets rated SR3 under LPS 1175, a five minute hold against crowbars, drills and chisels, and some battery stores and electrical rooms step to SR4, a ten minute hold. A shielded room is ordered by its attenuation in dB over its frequency range, and the room is tested to check performance after fitting.

Dust and noise controls are settled in advance, and doorsets reach the site made to surveyed sizes, so the time spent inside a live hall stays short. The occupied building guide covers fitting work where the building never closes, and the site team agrees the fitting order before any unit is made.

Need this specified for your project?Free rating, written specification and budget range within one working day.
Get a free quote

The station, the business parks and the shops

At the station, barriers on the vehicle approaches are planned round pedestrian and vehicle flows, and fitting is staged so the station keeps operating. Inside, rated doorsets go on ticket halls and back of house corridors, and retail units close their shutters after trading. The transport hub requirements guide covers station zoning in more detail.

On a business park, entrance control matters most: revolving doors at the main lobby, turnstiles at staff entrances, and rated doorsets on server rooms and plant areas. Laminated glass matched to its frame goes on ground floor glazing near car parks, and street furniture goes on forecourts where the public realm meets the building edge.

Ratings on the fitted work

The grade reflects LPS 1175 Issue 8.2 (September 2024) reflecting the minutes of hold for each opening. A1 to H20 is how far the scale runs. At A1, SR1 holds one minute; at B3, SR2 holds three; at C5, SR3 holds five; and at D10, SR4 holds ten, each grade a longer hold than the last. The grade sits with the doorset as a whole, never with one part alone.

BS EN 1634-1:2014+A1:2018 follows with E, EW and EI marks that span half an hour to two hours. A fire doorset fitted in Reading must hold its mark after the work is done. Where one opening needs fire and security together, order a dual rated doorset, with both marks on one specification. The keeping a rating valid guide gives the checks that keep a fitted doorset true to its test.

Site What is fitted Rating Programme note
Data centres Halls, plant, battery stores SR3 Phased round live halls
Business parks Lobbies, server rooms, plant SR2 Evenings and weekends
Station forecourt Vehicle approaches PAS 68 Phased round flows
Retail units Frontages out of hours SR2 Shutters fitted after trading
Shielded rooms RF and EMP rooms dB value Tested after fitting

A doorset made to a surveyed size fits in hours, not days. The survey is the step that keeps fitting time inside a live building short, so the programme is agreed before any unit is made.

Handover, test evidence and aftercare

At handover, the fitting team hands over test evidence, the written specification and the operation and maintenance notes for every unit fitted. The installation handover guide covers the checks for LPS 1175 and PAS 68 work, and the commissioning and handover guide covers the manual and the records that follow the job.

Planned visits keep closers, locks and seals working, and the maintenance in Reading page covers the service in the city. The maintenance contract guide gives the scope a contract should name: visits, checks and the parts covered. The records from handover stay with the building, so a later survey starts from the fitted ratings, not from a fresh guess.

Crowded places and the 2025 Act

A station concourse and a busy business park lobby can each fall under Martyn’s Law. Places with 200 to 799 people present at one time are standard tier. The enhanced tier begins once the count reaches 800 or more. No product is named in the Act, so the fitting team works from the risk assessment for the site, not from a fixed list. The Martyn’s Law standard page names the tiers, the regulator and the dates. The premises guide names the duties for each tier. Royal Assent followed on 3 April 2025, and the SIA regulates the duties, which are due to start in spring 2027, though that date may yet move.

How to start a Reading installation

Five steps shape the job, in this order: survey, rating, written specification, supply, then install, and the survey measures each opening, records the wall build and agrees the access hours. Your team agrees the rating, the specification is written for tender issue, the units are made to measure from the surveyed sizes, and fitting keeps to the site hours. Written answers go out within one working day, naming the rating and the fitting order for each opening.

Post the opening list to the contain Saffron Road, Romford, Essex RM5 3ES. Head tomorrow to the site with the opening list and the access times agreed, and the fitting team will confirm the survey date by return. Email [email protected] with specs for each opening, the wall build and the access hours, and the answer will name the rating for the site.

Can fitting go ahead while a data centre stays live?

Yes. The work moves hall by hall, so one hall stays live while the next is fitted, with dust and noise controls settled in advance.

What does the survey cover before fitting starts?

Every opening, the wall it sits in, the frame depth and the access hours the site allows. The survey settles the rating for each opening and sets the written specification, so no unit is made from a rough measure.

What is handed over when fitting ends?

Test evidence, the written specification and the operation and maintenance notes for every unit fitted. Those papers stay with the building, so a later survey works from the fitted ratings rather than starting over.

Do you fit fire doorsets as well as security doorsets?

Yes, where one opening needs both. The unit carries a fire mark from 30 minutes to two hours, with E, EW or EI on the specification, and a forced entry grade beside it, and the fitted unit must hold its fire mark after the work is done.

Planning fitting work in a Reading data centre, business park or station? Tell us the openings and the access hours. Get a free quote

Ready to specify your project?

Free assessment, written specification and test evidence. Reply within one working day.