Services
Installation in Edinburgh
Installation in Edinburgh for security doors, frames and screens, from survey and written specification to fitting, testing and a written handover.
- ✓Third-party test evidence with every product
- ✓Written specification you can issue to tender
- ✓Supplied and installed in Edinburgh
Get a free quote in Edinburgh
Rating, written specification and budget range within one working day.
Confidential. No cost, no obligation.
Third-party tested
Evidence with every quote
UK manufactured
Made to your sizes
One accountable team
Specify, supply, install
Confidential handling
Details never shared
Supplied and installed in Edinburgh
What we supply in Edinburgh
A measured opening in Edinburgh becomes a working door through six stages, and Installation is the name for the whole sequence. Frame, leaf, lock and closer each take their turn, the clearances are read twice, and the room goes back to its users only when every part has been tried.
The hours for that sequence come from the buildings themselves. Wards at the Royal Infirmary of Edinburgh run through day and night, the Western General Hospital treats patients across its wards and clinics, and lecture rooms and laboratories fill through term at the University of Edinburgh. Murrayfield Stadium, the Usher Hall and Edinburgh Castle draw crowds on match days, concert nights and busy weekends, while Waverley Station and Edinburgh Airport keep concourses and gates in use from early morning to late night.
Every Edinburgh job opens with a survey of the opening, a written specification naming the grade for each leaf, and a programme setting the order of rooms. For the rest of the city, see our physical security in Edinburgh page. The drawings the visit works from are on the design in Edinburgh page.
What an Edinburgh installation visit covers
The whole opening is covered, not the leaf alone. Frame, leaf, glazing bead, lock, closer, handles and seals each take their turn, the frame is set square and true, the leaf goes on, and clearances are read once the hardware is on. The range of leaves and frames is set out on the Security doors page, and the steel leaf case in the same city is covered by the fire rated steel doors in Edinburgh page.
Hinges, handles, seals and thresholds are fitted and checked one by one. The closer is set until the leaf closes quietly and fully, and the lock is tried with the keys to be handed over. Later checks that keep closer and lock working as they did at handover are on the Maintenance in Edinburgh page, and the gate case for the same city is on the security gates in Edinburgh page.
How an Edinburgh visit runs, stage by stage
Six stages run in the same order on every visit: survey, specification, supply, fit, test and handover. Opening sizes and wall build-up come out of the survey, the grade for each opening comes out of the specification, and fitting moves from room to room, leaving the rest of the building in use. How work is sequenced round the build is explained in the lead times guide, and the CDM 2015 duties notes set out the duties that apply on a construction site.
Where the programme allows, rooms in daily use are fitted first, and rooms that must stay open are fitted in the quiet hours. The fitting sheet carries the sizes and the sequence for the day, and each room is cleared and checked before it goes back to its users.
Grades, ratings and the written specification
The grade an Edinburgh leaf takes amounts LPS 1175 Issue 8.2 (September 2024) amounting to a named grade for the tools listed in the risk assessment. Resistance runs from a single minute at the bottom grade to ten minutes at the top, with the tool class rising from A1 through B3 and C5 to D10 as the minutes rise. That span covers SR1, SR2, SR3 and SR4 in order, each step buying more delay against a harder tool set. Leaf, frame and lock are each tested to the grade the order names.
Grade, leaf size, frame, hardware and keys for every opening go into the written specification, so the right leaf reaches the right opening and nothing is guessed on the day. The LPS 1175 standard page is where the full scale sits, and why the fitted doorset must match the one that was tested is explained in the keeping a rating valid guide.
BS 8300 and Approved Document M set two caps on the push for a door on an accessible route. For the first 30 degrees of travel, the opening push must stay at or under 30 N. Once past 30 degrees, the cap is 22.5 N. The access and Approved Document M guide holds those figures, and classes for a leaf that carries both jobs sit on the fire ratings page.
The Martyn’s Law standard page is where each tier, and what it asks of a place, is set out. Crowd size fixes the tier: 200 to 799 people at once puts a hall in the standard tier, and 800 people at once puts it in the enhanced tier. The duties take effect when the law starts. The start falls in spring 2027.
| Stage | What happens | What is read | Record left |
|---|---|---|---|
| Survey | Opening measured, wall noted | Dimensions at three heights | Measure sheet |
| Specification | Grade and hardware written down | Grade per opening | Written specification |
| Supply | Leaf, frame, hardware matched | Sizes against the order | Delivery note |
| Fit | Frame set true, leaf hung | Clearances round the leaf | Fitting sheet |
| Test | Lock, closer, seals tried | Keys, shut, push | Test results |
| Handover | Sizes, grade, hardware, keys | Grade and test results | Written record |
Read the opening at three points before the frame is ordered. Few walls run square, and the leaf is made to the tightest reading, so one centre measurement leaves a leaf that binds on one side and stands open on the other.
What the Edinburgh survey records before fitting starts
Width and height are read at top, middle and sill, the wall is noted as brick, block or stud, and the fall of the floor across the threshold is checked, so the leaf clears the floor finish and the bottom seal meets the floor for its full length. The route the leaf and the frame must travel is recorded too, with the width of the doors and corridors on that route, and whether the only way up is a lift or a stair.
Power points near the opening are noted where the job brings automation or a hold-open device, and the hours the building can give are written down so the visit lands in hours to suit the people inside. Those notes turn into the sizes and the running order on the fitting sheet, and the sheet is the one the visit works from on the day.
Handover, records and the written reply
Handover leaves one written record for the building: size, grade, hardware and keys for each opening, with lock and closer test results noted beside them. That record is filed at our Edinburgh beacon Saffron Road, Romford, Essex RM5 3ES. Visit early with opening sizes and the hours the rooms are free, and the visit date is set from those figures.
Photos of each opening, with a note on when the rooms are free, go to [email protected] for guidance on the grades, the sequence and the visit date, and the reply is sent in writing inside one working day. Records handed over once the fitting is done are covered in the commissioning and handover notes, and the checks that close a job are covered in the acceptance and snagging notes.
Questions about installation in Edinburgh
Does the building stay open while the fitting runs?
In most cases, yes. One room is fitted at a time, so the rest of the building stays open for its users. The programme sets the order of the rooms, and work in wards, lecture rooms and public counters lands in hours when those rooms are quiet.
Do the old doors come out during the visit?
Yes, they do. The old leaf and frame come out first, the opening is made good, and only then is the new frame fixed. Anything to be kept, a lock barrel or a closer for example, is listed in the order ahead of the visit. Nothing the client wants to hold on to is lost when the old door comes out.
How is an opening that is out of square handled?
The first measure finds it: width and height at three points, with the leaf cut to the smallest reading. A frame that sits out of square is packed and set true ahead of the leaf going on, and the clearances are read again once the hardware is fitted, so a wonky opening never leaves a leaf that binds.
What does the handover record list?
It lists size, grade, hardware and keys for each opening in one written record, with lock and closer test results noted beside them. Later maintenance checks work from that record, so a closer that starts to drag in a year is judged against the setting noted at handover.
Installation for an Edinburgh site?
Send opening sizes and the hours the rooms are free, and the quote covers survey, specification, fitting and handover in one figure. Get a free quote
Other areas
Installation in other areas
Ready to specify your project?
Free assessment, written specification and test evidence. Reply within one working day.