Certified physical security

ArxBridge
Waterfront offices with glass entrances and bollards in Cardiff

Services

Installation in Cardiff

Installation in Cardiff for security doors, windows, gates and barriers, fitted, checked and handed over with written records for each opening.

  • ✓Third-party test evidence with every product
  • ✓Written specification you can issue to tender
  • ✓Supplied and installed in Cardiff
Prefer to talk?+44 7352 267239

Get a free quote in Cardiff

Rating, written specification and budget range within one working day.

ArxBridge Quote Form

Confidential. No cost, no obligation.

Third-party tested

Evidence with every quote

UK manufactured

Made to your sizes

One accountable team

Specify, supply, install

Confidential handling

Details never shared

Supplied and installed in Cardiff

What we supply in Cardiff

More on this

A security door that fits badly guards nothing, however strong its grade. The leaf must sit square in its frame, the fixings must bite into solid wall, and the gaps around the leaf must stay even from top to bottom. Fitting is the point where the grade on paper turns into a door that shuts, locks and holds.

Fitting is booked opening by opening in Cardiff, never for a whole building at once. The main entrance goes first, the cash office door follows, and the back door takes its turn once the front is proved. Working in that order keeps the building open while fitting goes on, and each opening is priced on its own figures.

ArxBridge provides installation in Cardiff for security doors, windows, gates and barriers, fitting each opening to its written specification and checking it before handover. Our other Cardiff services are gathered on the physical security in Cardiff page. The handover side of the work is covered in our installation handover guide.

Measured firstEvery opening sized on site
FixingsSet into solid wall
Written handoverRecords for each opening
Checked firstTested before sign-off

Where Cardiff fitting work happens

Ward doors at University Hospital of Wales are fitted while the ward keeps running, so the work is planned around beds, trolleys and visiting hours. Teaching blocks at Cardiff University and Cardiff Metropolitan University fill with students between lectures, so fitting there is planned around the timetable and the rooms are handed back clear. The fitting crew works one opening at a time, and each opening is shut, locked and tested before the next one starts.

Cardiff Central station needs gates and doors fitted where crowds pass in both directions at the busiest hours, so the work is staged away from the heaviest flows. Principality Stadium, Cardiff Castle and Cardiff Bay offices each bring their own crowds, and Cardiff Airport keeps travellers moving through its terminal while fitting goes on behind screens. The occupied building replacement guide covers fitting while people stay in the building. Design for the same openings is handled on our Cardiff design page, and the doors themselves are made on our Cardiff manufacture page.

The fitting visit at five Cardiff openings

The five openings below show how the fitting task changes from one building to the next.

Building Opening Fitting task Extra
University Hospital of Wales ward door Ward door in a live ward Leaf hung square, gaps even Work planned around visiting hours
Cardiff University teaching block Teaching block entrance door Frame packed out to a sound wall Room handed back clear
Cardiff Central station gate line Gate line off the concourse Gates levelled and tested in turn Work staged away from peak flows
Principality Stadium hospitality door Hospitality door for event nights Closer and lock set for heavy use Tested with the crowd flow in mind
Cardiff Bay office entrance Office entrance doorset Frame sealed against wind and rain Threshold checked for level access
Need this specified for your project?Free rating, written specification and budget range within one working day.
Get a free quote

One Cardiff fitting, two ratings to prove

One Cardiff fitting can hold a forced entry class and a ballistic or blast class together, yet the tests run apart, so a pass under one says nothing about the other. The fitting check tests LPS 1175 Issue 8.2 (September 2024) proving the forced entry class still holds once the doorset is in the wall. A1 work takes one minute at SR1, B3 work takes three minutes at SR2, C5 work takes five minutes at SR3, and D10 work takes ten minutes at SR4. The grade must still stand after the doorset is fixed in place. For the whole scale, look at the LPS 1175 page. For what fitting must protect, see the guide keeping an LPS 1175 rating valid.

Glazed screens fitted on the same visit can carry the LPS 1270 grade. Issue 1.1 dates from 2014, and the LPS 1270 page gives the full detail of that grade. The vehicle impact ratings page lists the barrier classes. Vehicle barriers fitted beside the doors follow ISO 22343-1:2023, which came in after PAS 68:2013. That older standard was withdrawn 25 October 2023. The HVM standards guide covers the change from PAS 68 to the ISO 22343-1:2023 barrier classes. Lead times for the whole job are covered in the lead times and programme risks guide.

Fixings, frames and the wall around the opening

The wall decides how a doorset is fixed, so the opening is read before any fixing goes in. Brick, block and concrete each take their own fixing, and a hollow wall needs a frame that spreads the load instead of pulling on one spot. The frame is packed out until it sits plumb, and the packers stay in place once the fixings are tightened.

A fixing that bites into loose render holds nothing, so soft or crumbling material is cut back to sound wall before the frame goes in. The gaps around the frame are filled and sealed, and the threshold is set level so the leaf does not drag. Cardiff security doors are fitted to the same written specification as the windows and gates on the same job.

Fitting while the building stays open

Most Cardiff buildings cannot close for fitting, so the work is planned in slices. One opening is taken out of use at a time, a temporary screen goes up, and the rest of the building carries on. Dust sheets go down before cutting starts, and the floor is left clear at the end of each visit.

Noise is kept to the hours the building can bear, and the noisiest cuts are bunched into one visit rather than spread across the week. Staff are told which door is out of use and for how long, so nobody is left standing at a locked door. The occupied building replacement guide covers the same staging in more detail.

Handover, records and the first check

Handover is a written record, not a handshake. The record names the opening, the grade fitted, the fixings used and the gaps measured at the leaf, so the next person to look at the door can see what was done. Keys are counted and signed for, and the care notes for the closer, the lock and the seals go with the record.

The first check happens before sign-off, with the leaf opened, shut and locked several times and the gaps read again. Anything that drags or catches is put right on the visit, not left for a later date. The commissioning and handover guide gives the records a job leaves behind, the Regulation 38 handover guide covers the fire safety information that travels with the doors, and the maintenance contract scope guide covers the checks that follow.

From measurements to a written price

Each opening is measured on site, and the wall build, frame depth, opening size and draught at the opening go into the written record with the grade beside them. The specification then sets down the doorset build and the fixings, the grade and the SR class beside them, and those figures set the price.

Post the opening sizes with the grade each opening needs to our Cardiff belvedere Saffron Road, Romford, Essex RM5 3ES. Take away the drawings beside the opening sizes when you write. Email [email protected] for measurements and a written price.

Notes for Cardiff fitting buyers

Put the fixings on the order next to the doorset build, with the wall type named beside them. A strong doorset in a weak fixing pulls out of the wall, so the measure-up must catch soft material before the frame goes in.

Questions about installation in Cardiff

How much time does one door take to fit?

It depends on the opening. A plain opening in a sound wall takes less time than one that needs the frame packed out or the wall made good, and a run of openings is booked across several visits rather than forced into one.

Does the building need to close during fitting?

No. Work closes off a single opening at a time behind a temporary screen, and the rest of the building carries on as normal. Staff hear in advance which door is closed and for how long.

What happens if the wall is not square?

Packers bring the frame plumb, and they stay in place once the fixings are tightened. Soft or crumbling material is cut back to sound wall before the frame goes in.

What papers come with handover?

A written record naming the opening, the grade fitted, the fixings used and the gaps measured at the leaf, with the keys counted and signed for and the care notes for the closer, the lock and the seals beside it.

Ready to specify your project?

Free assessment, written specification and test evidence. Reply within one working day.