Services
Installation in Coventry
Installation in Coventry for security doors and screens, from openings and fitting to testing and handover, carried out around the life of each building.
- ✓Third-party test evidence with every product
- ✓Written specification you can issue to tender
- ✓Supplied and installed in Coventry
Get a free quote in Coventry
Rating, written specification and budget range within one working day.
Confidential. No cost, no obligation.
Third-party tested
Evidence with every quote
UK manufactured
Made to your sizes
One accountable team
Specify, supply, install
Confidential handling
Details never shared
Supplied and installed in Coventry
What we supply in Coventry
Installation in Coventry covers the fitting of security doors, frames, screens and hardware into openings that have already been measured, so each leaf hangs true, each lock meets its keep and each closer shuts the leaf without a slam. A ward door, a lecture hall door and a ticket office screen each need the same care at the fixing stage, and the work is planned round the building so wards, lectures and events carry on while the fitting happens.
Coventry shapes that planning in clear ways. University Hospital Coventry runs wards through the day and night, Lectures and exams at Coventry University and at the University of Warwick fill term time, and Coventry Building Society Arena, the Belgrade Theatre and Coventry Transport Museum run crowds on match days, performance nights and busy weekends. Coventry Cathedral, the Herbert Art Gallery and Museum, Jaguar Land Rover sites, Coventry City Council offices and Coventry railway station add quiet rooms, workshops, civic counters and a busy concourse to the same programme, and each one asks for the fitting to be timed to its own hours.
What installation covers in Coventry
Installation starts where the drawing leaves off. The crew starts by noting the dimensions and the grade set for every opening, checks the wall the frame must sit in, and fixes the frame square and plumb before the leaf is hung. The leaf is then hung on its hinges, the glazing bead is seated, the lock and the closer are fitted, and the gaps round the leaf are read and set. Security doors covers the range of leaves and frames, and the design page covers the drawings the crew works from on site.
The same visit covers the smaller parts that make a door work day to day. Handles, hinges, seals and thresholds are fitted and checked, the closer is set so the leaf shuts without a slam, and the lock is tested with the keys that will be handed over. Maintenance covers the later checks that keep the closer and the lock working as they did on the day of fitting, and fire rated steel doors in Coventry covers the steel leaf case for the same city.
How an installation visit runs
A visit runs in a set order: measure, programme, fit, test and hand over. The measure confirms the opening sizes and the wall build-up, the programme names the order of rooms so the rooms in use first are fitted first, and the fitting itself runs room by room so the rest of the building stays in use. The lead times guide explains how work is sequenced round the build, and the programming a door and barrier package guide covers jobs where doors and barriers are fitted together.
The Romford headquarters: Saffron Road, Romford, Essex RM5 3ES. The commissioning and handover guide covers the records that are handed over once the fitting is done.
Ratings and checks before handover
The written order requests LPS 1175 Issue 8.2 (September 2024) grading each doorset by attack time and tool set, so the crew knows which leaf goes in which opening before the van is loaded. Four grades cover the range. SR1 holds for one minute against hand tools in set A1, SR2 for three minutes against the wider kit in set B3, SR3 for five minutes against heavier cutting tools in set C5, and SR4 for ten minutes against the most forceful kit in set D10, with leaf, frame and lock each tested to the grade named in the order. The full scale is set out on the LPS 1175 page, and the keeping a rating valid guide explains why the fitting must match the doorset as tested.
Before handover, the crew reads the gaps round each leaf, tests the lock with its keys, sets the closer and reads the opening force on doors along an accessible route, checking it at two points in the swing: no more than 30 N up to 30 degrees, then at most 22.5 newtons beyond that. The access and Approved Document M guide covers those figures, the fire ratings page lists the classes that apply where a leaf carries both jobs, and the bullet resistant doors in Coventry page covers the ballistic leaf case for the same city.
| Stage | Check on site | What is read |
|---|---|---|
| Measure | Opening sizes and wall build-up | Width and height at three points |
| Fit | Frame square and plumb, leaf hung | Gaps round the leaf |
| Test | Lock, closer and seals working | Keys, shut and opening force |
| Handover | Rating, hardware and keys listed | LPS 1175 SR1 to SR4 |
Squareness starts with the frame. If it is fixed out of square, the latch binds and the closer works against the leaf, so the frame is checked level before the leaf goes on, and the clearances are measured a second time once the hardware is fitted.
What the survey records before fitting starts
The survey records the opening in three places, width and height at the top, the middle and the sill, because walls are rarely square and the leaf must fit the tightest reading. It notes the wall construction, whether the opening sits in brick, block or a stud partition, since the fixing changes with the material. It checks the floor for fall across the threshold, so the leaf clears the finish and the seal meets the floor along its length.
The survey also records the access route for the leaf and the frame, the width of the doors and corridors the delivery must pass through, and whether a lift or a stair is the only way up. It looks for a power point close to the opening when the job includes automation or a hold-open device, and it records the hours the building can give the crew, so the visit is set for a time that suits the people inside. These notes become the sizes and the sequence on the fitting sheet, and the crew works from that sheet on the day.
Questions about installation in Coventry
Can fitting run while the building stays open?
Yes, in most cases the work runs room by room, so the rest of the building stays in use while one room is fitted. The programme names the order of rooms, and work in wards, lecture halls and public counters is timed to the hours when those rooms are quiet, with the crew clearing each room before the next user walks in.
Do you remove the old doors as part of the visit?
Yes, the old leaf and frame are taken out as part of the fitting, and the opening is checked and made good before the new frame is fixed. Any hardware that is to be kept, such as a lock barrel or a closer, is named in the order before the visit, so nothing the client wants to keep is lost when the old door is removed.
What happens if an opening is out of square?
The measure at the start of the visit finds it, since the width and the height are read at three points and the smallest reading is the one the leaf was made from. A frame that is out of square is packed and fixed true before the leaf is hung, and the gaps are checked a second time once the hardware is on, so a wonky opening does not leave a leaf that binds.
How is the handover recorded?
At handover, the sizes, the rating, the hardware and the keys for each opening are listed in one written record, with the test results for the lock and the closer noted beside them. That record is the one the later maintenance checks work from, so a closer that needs a tweak in a year can be read against the setting it left the site with.
Send photos of each opening and a short note on the hours the rooms are free to [email protected] in the same message as the photos, and a written reply inside one working day gives the visit date, the crew size and the price for the work in Coventry.
Other areas
Installation in other areas
Ready to specify your project?
Free assessment, written specification and test evidence. Reply within one working day.