Certified physical security

ArxBridge
Lace Market brick building with a navy steel security door in Nottingham

Services

Installation in Nottingham

Installation in Nottingham for security doors, windows, gates and screens, planned around the building and finished with a written handover note.

  • ✓Third-party test evidence with every product
  • ✓Written specification you can issue to tender
  • ✓Supplied and installed in Nottingham
Prefer to talk?+44 7352 267239

Get a free quote in Nottingham

Rating, written specification and budget range within one working day.

ArxBridge Quote Form

Confidential. No cost, no obligation.

Third-party tested

Evidence with every quote

UK manufactured

Made to your sizes

One accountable team

Specify, supply, install

Confidential handling

Details never shared

Supplied and installed in Nottingham

What we supply in Nottingham

More on this

Installation in Nottingham is planned around the building, not around the van. Each opening is surveyed, each doorset is made to the survey sizes, and the fitting date is set around the hours the building keeps. The work starts with a written specification and ends with a handover note, and every step between the two is logged against the opening it belongs to.

Nottingham gives the fitting team a wide range of rooms to work in. Wards at Queen’s Medical Centre, lecture blocks at the two Nottingham universities, concourses at Motorpoint Arena and the National Ice Centre, stands at Trent Bridge and the City Ground, visitor routes at Nottingham Castle and ticket halls at Nottingham station each set their own hours and their own access rules.

ArxBridge fits the doors, windows, gates and screens it makes, and each piece arrives on site with its sizes, its rating and its finish already recorded. For the wider picture, see our physical security in Nottingham page.

Survey firstNo fitting starts before the survey sizes are agreed
One recordEach opening logged with sizes, rating and finish
Hours keptFitting set around ward rounds, lectures and trade
Handover noteWritten note at handover for every opening

How a Nottingham fitting is planned

Planning starts with the survey. The surveyor measures each opening, logs the wall build and the floor height, notes the services that run beside the frame and sketches the approach people take through the room, and a photograph of each opening goes into the fitting file.

The specification follows the survey. It names the grade and the sizes for each opening, the materials and the hardware for the leaf, and the finish for the room it serves, and the fitting team works from that document alone, so nothing is guessed on site. The how to specify guide gives the points each doorset needs, and the ten steps guide puts the sizes and the class in order for the sheet. The security doors page shows the leaves, frames and screens the team fits on site.

The grade on the sheet fits LPS 1175 Issue 8.2 (September 2024) fitting the tool set and the minutes to the opening, with SR4 on tool set D10 for 10 minutes, SR3 on tool set C5 for 5 minutes, SR2 on tool set B3 for 3 minutes, with SR1 on tool set A1 for 1 minute. Our LPS 1175 page sets out the grades, and the SR2 against SR3 against SR4 guide weighs the three higher grades against each other.

The fitting day, opening by opening

On the fitting day the team works opening by opening, and no leaf is hung before its frame is checked against the survey sizes. The frame is set level and square, fixed to the wall build the surveyor recorded, and the leaf is hung and tried through its full travel before the ironmongery is fixed.

Seals, closers and locks go on after the leaf hangs true. A gap that runs uneven, a closer that pulls too hard or a lock that binds is put right while the team is still on site, and the opening is not signed off until the leaf shuts and locks cleanly. The steel door frames guide explains the frame the leaf hangs in, and the powder coating against galvanising guide puts the two finishes side by side.

Floors, paint and finished rooms are protected before the first frame is lifted in. Boards go down on the approach, the leaf is carried in on edge, and dust sheets cover the work area, so a ward, a lecture room or a ticket hall is left as it was found. The team takes its waste away at the end of each day, and any opening left overnight is shut and locked until the team returns.

Crowded rooms need the fitting set around them. A concourse at Motorpoint Arena, a stand at the City Ground and a hall at the National Ice Centre are fitted between events, a ward at Queen’s Medical Centre is fitted between rounds, and a lecture block is fitted between teaching times. Fire rated leaves are fitted to the same routine, and the fire rated steel doors page sets out the steel leaf case. The lead times guide lists what stretches a programme and what shortens it.

Need this specified for your project?Free rating, written specification and budget range within one working day.
Get a free quote

Nottingham settings and the fitting each one needs

Common Nottingham settings pair with an item and a fitting window as follows. Take it as a starting point: the survey for each opening has the last word on the timing and the sizes.

Nottingham setting Item fitted Fitting note Handover
Queen’s Medical Centre ward Single leaf doorset, glazed Fitted between rounds Note per opening
University of Nottingham laboratory Double leaf doorset Fitted between teaching times Note per opening
Motorpoint Arena concourse Double leaf doorset Fitted between events Note per opening
Nottingham station ticket hall Single leaf doorset Fitted around trading hours Note per opening
Nottingham Castle visitor route Single leaf doorset, glazed Fitted around opening hours Note per opening
City Ground stand Sliding vehicle gate Fitted between match days Note per opening

No opening is signed off on a promise. The leaf must shut, lock and seal in front of the person who takes the handover, and the note for that opening records what was checked.

Handover and the checks that follow

Handover is a walk round, not a handshake. The fitting team walks each opening with the person who takes the building back, tries every leaf, lock and closer, and logs the result for that opening in the handover note. Anything that binds or drags is put right before the team leaves, and the note records what was done.

The handover note also records the sizes, the grade and the finish for each opening, so a later repair or a later order for the same building starts from the same figures. Keep the note with the building records, and any leaf that needs attention in future can be matched to its opening without measuring the whole building again.

Post the opening list and the sizes each door needs to our Nottingham mill Saffron Road, Romford, Essex RM5 3ES. Drop them in one email with the drawings and the room list, and a survey slot can be fixed straight away.

After handover, the maintenance guide gives the routine that keeps each leaf shutting true, and the warranty and defects guide describes what follows handover. The inspection checklist lists the checks to make between visits, and the Martyn’s Law guide covers the standard tier, for premises expecting between 200 and 799 people, and the enhanced tier, for premises with 800 or more, with duties starting in spring 2027. The Martyn’s Law standards page lists the tiers.

Frequently asked questions

What happens if a leaf binds after handover?

Tell us straight away, and the fitting team will look at the opening again. The warranty and defects guide describes what follows handover, and the handover note for that opening is the record to quote.

How long does fitting take in Nottingham?

The timing follows the count of openings, the grade chosen and the finish chosen for the order, and a single leaf takes far less time than a full floor of doorsets. After survey sizes and class are agreed, the fitting date goes into writing, and the lead times guide lists the points that stretch a programme or shorten it.

Can the team fit doors while people keep using the building?

Most buildings stay open. Wards are fitted between rounds, lecture blocks between teaching times and concourses between events, and each opening is signed off before the team moves to the next.

What should be ready before the fitting team arrives?

Clear access to each opening, the survey sizes agreed in writing, and the finish and hardware choices settled. Anything still undecided on the day slows the fitting and may push the handover back.

Write to [email protected] with guidance on the sizes and the hours each room keeps, and the reply in writing gives a price range and the survey step that follows for the Nottingham fitting.

Ready to specify your project?

Free assessment, written specification and test evidence. Reply within one working day.