Services
Installation in Cambridge
Installation in Cambridge for security doors, shutters and gates, from survey and written specification to fitting, with handover papers at the end.
- ✓Third-party test evidence with every product
- ✓Written specification you can issue to tender
- ✓Supplied and installed in Cambridge
Get a free quote in Cambridge
Rating, written specification and budget range within one working day.
Confidential. No cost, no obligation.
Third-party tested
Evidence with every quote
UK manufactured
Made to your sizes
One accountable team
Specify, supply, install
Confidential handling
Details never shared
Supplied and installed in Cambridge
What we supply in Cambridge
Fitting a doorset in Cambridge is the last step in a longer job, not the first. The visit happens first, the protection level is settled after it, and a written schedule sets out the surface, the ironmongery, the frame and the leaf for each doorway. Fitting keeps to the written list throughout, and the job is only finished when the handover papers pass to the buyer after a check against what was agreed.
Addenbrooke’s Hospital keeps wards and departments open while work goes on around them, and the colleges of the University of Cambridge fit work between terms and teaching days. At Cambridge Science Park, office and laboratory doors must fit round staff movement and goods coming in, in the city centre shops and public rooms stay open while work goes on, and at the railway station hall doors must leave the ways out free while travellers pass through. Each building needs its own programme, built round its busy days and the footfall through its doors.
The first visit is a survey. Each opening is measured, the wall beside it is noted, the protection it needs is marked down with how many people use the door each day, and the Cambridge order is drawn up from those notes. The lead times guide gives the buyer a plain view of where the weeks go on a Cambridge job. Put the size of each opening in your message, and you will have a written reply the following working day.
How a Cambridge installation runs, step by step
The job runs in five stages, each one following the last, from the first visit through to handover. The survey comes first and fitting comes last, with nothing skipped in between. On the first visit the team looks at what each doorway is built from, how people pass through it during a normal day, and what danger it faces, then sets the grade from that evidence instead of estimating it. Once those findings are written down, the order lists finish, ironmongery, frame and leaf doorway by doorway, and nothing is ordered until that list is complete. Installation puts every doorset in place exactly as the written list asks, drawing on the design service in Cambridge and the manufacture service in Cambridge that prepared it.
Dates stretch with the number of doorsets on the order and with the grade each one carries, since a bigger batch and a higher grade both add weeks to the programme. The lead times guide shows the buyer where the weeks go on a Cambridge job. The CDM 2015 duties guide covers the safety duties that fall on each side while the fitting runs, from the first plan to the last check.
Ratings and the doorset that needs them
Each doorset passes LPS 1175 Issue 8.2 (September 2024) passing the attack test for its grade before the specification is signed. Grades run from A1 to H20. SR1 means the doorset holds for a single minute. SR2 means three minutes, SR3 means five, and SR4 means ten. Each opening takes its grade from the survey visit.
BS EN 1634-1:2014+A1:2018 frames the fire test for each rated doorset on the Cambridge job. Fire performance falls into classes E, EW and EI, with the hold time set anywhere between 30 and 120 minutes. Each class and its meaning at a doorway sits on the fire ratings page, and a doorset built to that rating appears on the fire rated steel doors page. Where no fire risk exists, the forced entry risk alone fixes the grade, and the grade goes into writing before anything is ordered.
Cambridge buildings and the work each one needs
| Cambridge building | Work | Handover papers |
|---|---|---|
| Addenbrooke’s Hospital | Fitting ward and corridor doorsets round departments in use | Care notes and test reports for each doorset on the job |
| University of Cambridge colleges | Fitting college entrance and stair doorsets between terms | Specification in writing and test reports for the whole job |
| Cambridge Science Park | Office and laboratory doorsets go in phase by phase | Test reports for each doorset, and the specification stays on file |
| City centre | Fitting shop and public room doorsets with trading kept open | Care notes with the specification for each opening in writing |
| Railway station | Fitting hall doorsets while the routes out stay clear | Care notes with the specification for each opening in writing |
Five Cambridge sites appear in the table, each matched to its fitting work and to the papers handed over with it.
Handover papers and the duties that come with the work
Fitting closes when the full set of papers changes hands, not when the last tool is packed away. At that point the buyer receives the test evidence, the signed-off list of what was fitted and the notes on looking after every doorset. The commissioning and handover guide runs through every paper in a full handover and explains its use when a doorset is inspected or a part is swapped. Those papers stay with the building, so later work on a doorset starts from the fitted record rather than from a guess.
Once fitting is done, the maintenance service keeps the doorsets in order, and the fire door maintenance guide together with the fire door inspection checklist sets the checks and their timing. Hospital jobs in Cambridge follow the fire door regulations guide for hospitals for the checks that apply, and the papers a rated leaf is expected to carry are set out in the fire door certification guide.
Public premises in Cambridge and the tiers that apply
Public premises in Cambridge fall under Martyn’s Law too, and the tier comes from the headcount. A headcount between 200 and 799 puts the place in the standard tier, and a headcount of 800 or above puts it in the enhanced tier. The Security Industry Authority is expected to act as regulator, with the first duties due in spring 2027. Before a doorset is ordered for a college or a city centre room open to the public, the headcount settles which tier the place sits in, because that tier sets what each entrance must do and the way people leave through it.
The premises guide covers what each tier must do, and the headcount bands behind those duties sit with the Martyn’s Law standard page. The broader view across Cambridge is on the physical security in Cambridge page, with the gates that stand next to the doorsets being fitted covered on the security gates in Cambridge page.
From first visit to handover on a Cambridge job
The job keeps its order from the first visit through to handover, with the survey first, the rating next, then the written specification, supply and fitting last. The survey measures each opening for size, wall, rating and daily use, and those notes shape the specification. Every opening gets its finish, its hardware, its frame and its leaf written into the specification, and no fitting starts until that list is finished. When the job reaches handover, the buyer is handed the test evidence, the written list of what was fitted and guidance on looking after each doorset, and the papers mark the close of the work.
Email [email protected] considering the openings you need fitted, and the written reply sets out the Cambridge scope and the step after that.
Send the opening drawings in a bundle Saffron Road, Romford, Essex RM5 3ES. Inquire now about a survey date, and the booking follows once the drawings arrive.
No doorset goes in before the written specification sets out the hardware, the frame, the leaf and the rating for its opening.
Fitting questions from Cambridge buyers
Which step opens a Cambridge fitting job?
The opening move is a survey, which measures each doorway, notes the wall beside it and the rating it needs, and records how busy the door is through a normal day. Those survey notes turn into the written specification, and the order holds until it sets out the hardware, the leaf, the finish and the frame for each opening.
Which papers change hands once the fitting is finished?
Once fitting ends, the buyer is given test reports, a written specification and care notes covering every doorset on the job. The handover guide sets out everything a full handover holds, and those papers remain with the building for any later work on a doorset.
Must every doorset in a Cambridge fitting carry a fire rating?
A fire rating goes on a doorset only when that opening calls for one. A doorset that needs a rating carries E, EW or EI as its class, with a hold time of 30 to 120 minutes. Where no fire risk exists, the forced entry risk alone fixes the grade.
When does the written quote for a Cambridge fitting reach the buyer?
Each opening is measured for size, wall, rating and daily use during the survey, and those notes build the written specification. The written reply lands by the next working day and sets out the step that follows.
Ask about installation for your Cambridge building
Share the measurements for each opening when you get in touch, and the written quote will set out the rating, the leaf and the fitting for every opening. Get a free quote
Other areas
Installation in other areas
Ready to specify your project?
Free assessment, written specification and test evidence. Reply within one working day.