Installation in Leicester for offices, shops, hospitals and university buildings, with surveyed fitting, graded doors and a handover file for each job.
- ✓Third-party test evidence with every product
- ✓Written specification you can issue to tender
- ✓Supplied and installed in Leicester
Get a free quote in Leicester
Rating, written specification and budget range within one working day.
Confidential. No cost, no obligation.
Third-party tested
Evidence with every quote
UK manufactured
Made to your sizes
One accountable team
Specify, supply, install
Confidential handling
Details never shared
Supplied and installed in Leicester
What we supply in Leicester
A door at Leicester Royal Infirmary moves beds, trolleys and staff through long shifts, a shutter on Belgrave Road guards a shop on the Golden Mile after the street quiets, and a gate by the railway station meets vans, taxis and foot traffic. Highcross shopfronts open with the retail day, the two universities hold lecture rooms and laboratories, and Leicester Market keeps stallholders moving from early morning. Each opening asks for its own leaf, frame and fitting plan.
For Leicester, Installation covers doors, shutters, gates and barriers across the city for offices, shops, hospitals, schools and yards. A visit measures the opening, a written specification names the rating and the hardware, and supply, fitting and handover follow in that order.
Working hours, noise limits and vehicle access change from one Leicester street to the next, so the fitting date, the hours on site and the route in are agreed with the building before any leaf is lifted. Shops on the Golden Mile trade late and wards at the Infirmary run through the night, so each job takes hours that fit the building around it. The physical security in Leicester page sets doors, shutters, gates and barriers beside each other.
Where fitting runs across Leicester
Office doors near the station and round the market are fitted outside the working day, with the lift booked and the handover hour fixed before the crew arrives. When a leaf carries a closer, a lock and a reader, the specification names all three. The programming notes show the order in which doors, gates and barriers go in on one site.
Highcross shopfronts open with the retail day, so a shutter there must run true on its guides and leave the front clear for morning trade, while the back door guards the stock room behind it. The retail sector notes follow a shop from its front door to its stock room.
At the Infirmary and on the two university campuses the job runs in short quiet windows, with dust and noise kept away from wards and teaching rooms. The healthcare sector notes deal with ward entries and the access points a hospital uses through the night.
What the handover file must hold
The written record briefs LPS 1175 Issue 8.2 (September 2024) briefing notes onto the schedule, so each opening carries the rating its own risk calls for. A one minute test with the A1 tool set gives SR1, and a three minute test with the B3 tool set gives SR2. The C5 tool set gives SR3 in five minutes, and the D10 tool set gives SR4 in ten. The LPS 1175 standard page puts the grades with their minutes and tool sets in one place. The certificate check notes help a buyer read test evidence before ordering.
A door on a compartment line takes a fire rating beside its forced entry grade. The specification writes the fire class beside each rated door, in E, EW or EI form, with times from 30 to 120 minutes. The fire ratings notes set out what each class holds back. The installation handover notes list the papers behind both ratings at handover.
PAS 24 was drawn up for a home front door, so it never sits beside a Leicester office, shop or hospital door on a specification. A line that names it there puts the wrong standard in the file. LPS 2081 Issue 1.1 (2016) covers a different class of opening, with SRA tested over one minute and SRB tested over three minutes, and the LPS 2081 page sets out where that rating belongs. The lead times notes set out how rating, finish and fitting date move the programme.
Leicester openings at a glance
Take the rows below as a rough guide. The size of the opening, its hours of use and the risk behind it fix the rating and the fitting method.
| Leicester opening | Fitting | Rating | On site |
|---|---|---|---|
| Office door, station area | Steel security door | Class B3 (SR2) | Fitted out of hours |
| Shopfront, Highcross | Security shutter | SR2, class B3 | Guides checked, motor tested |
| Ward entry, Infirmary | Fire rated steel door | EI 60 | One entrance at a time |
| Yard gate, Golden Mile | Sliding vehicle gate | SR2, class B3 | Track levelled first |
| Station approach | Fixed bollards | ISO 22343-1:2023 | Foundations first, then setting out |
Two openings may share a grade yet need different leaves and drives.
Hardware is named on the same schedule. A closer is sized to BS EN 1154, from EN 1, 750 mm and 20 kg, to EN 7, 1600 mm and 160 kg, and any closer on a fire door is EN 3 or above. Hinges take BS EN 1935: grade 13 covers two hundred thousand cycles at a 120 kg leaf load, and grade 14 the same count at a 160 kg leaf load. TS 007 rates the cylinder, and a 1-star cylinder beside a 2-star handle makes the 3-star set. Leaf gaps round a fire door are checked at 4 mm, as the fire door gaps notes set out.
How the Leicester specification is built
Each specification starts at the opening. Headroom, side room, width and height are measured, footfall and vehicle counts are noted beside them, and the power supply with the threshold level are noted too. The design service draws each opening from those measures, with rating, finish and hardware on the drawing.
Rating, hardware and access hours are settled together, and nothing is ordered until all three sit on one page. A motor shutter takes its safety edge and hand override on the same line. The acceptance notes give the snagging checks for handover, from leaf edge gaps to motor cycles and every lock in between.
The fitting date, the hours on site and the handover date sit beside the rating in the same document, so client, site manager and crew share one plan. The maintenance service takes the routine checks after handover. The warranty notes set out what the guarantee covers after the fitters have left.
Survey, supply and fitting in Leicester
The visit begins at the opening, where the surveyor measures width and height, reads the wall fabric and the floor fall, and records the grade beside each opening. Photos and a drawing to scale of each opening go into the specification. The manufacture service in Leicester builds each door to the schedule sizes, and the fire rated steel doors page for Leicester covers rated leaves on the same buildings.
The crew works through the schedule one opening at a time, setting each frame true and testing close, latch and lock. The handover file holds the test evidence, the rated schedule and the hardware list, with care notes and test records beside them. The commissioning notes set out what the handover file ought to hold. Gates on the same site are covered by the sliding vehicle gates in Leicester page.
A written answer reaches the enquirer within one working day, with the visit order and the fee set out in writing. The graded schedule and the Leicester survey notes go on file at our Leicester candle Saffron Road, Romford, Essex RM5 3ES. Arrive straightaway for a survey visit, and the schedule is written down.
Email [email protected] for fitting the survey dates and the door schedule. The answer gives the visit order and the fee.
Fix the rating before the finish is chosen. A leaf ordered for its looks can leave the opening short on forced entry resistance.
Questions Leicester buyers ask about installation
How long does fitting take on a Leicester office door?
It turns on the opening, the rating and the hours the building allows. A single steel door in a clear opening can be fitted within a day, while a full floor wants a phased programme fixed by the survey.
Can the crew fit a door while a Leicester shop trades?
Yes, when the hours allow it. The crew works early in the morning, in the evening or in a short gap between trading peaks, and the front stays clear so the shutter still closes at the end of the day.
Which papers go into the handover file?
The file holds the hardware list beside the care notes and the test records, and the rated schedule for each opening. Each item names its own opening, so the file can be read against the building without guesswork.
Do gates and barriers sit in the same fitting programme?
Yes. The same programme holds doors, gates, bollards and barriers, with foundations, setting out and testing in a single run, and one handover ends the job.
Want a price for fitting in Leicester?
Share each opening size and the grade its room needs. One figure covers survey, door and fitting. Get a free quote