Certified physical security

ArxBridge
Honey stone building with a discreet modern security door in Oxford

Services

Installation in Oxford

Installation in Oxford for security doors, shutters and gates, from site visit to handover, graded SR1 to SR4 and priced in writing for every opening.

  • ✓Third-party test evidence with every product
  • ✓Written specification you can issue to tender
  • ✓Supplied and installed in Oxford
Prefer to talk?+44 7352 267239

Get a free quote in Oxford

Rating, written specification and budget range within one working day.

ArxBridge Quote Form

Confidential. No cost, no obligation.

Third-party tested

Evidence with every quote

UK manufactured

Made to your sizes

One accountable team

Specify, supply, install

Confidential handling

Details never shared

Supplied and installed in Oxford

What we supply in Oxford

More on this

Installation in Oxford covers doors, shutters, gates and barriers at sites from Oxford station to John Radcliffe Hospital, and from a shop in the city centre to a college building behind its walls.

The city mixes old stone, new retail and busy hospital corridors, so each fitting starts with a visit that measures the opening, reads the wall and agrees how the work will run around the people who use the building.

A fitting is planned around the opening, not around a catalogue size. Frame size, wall build, floor level and daily traffic through the door are all fixed before any door is ordered.

The physical security in Oxford page gathers the city work under one heading, with doors, gates and windows side by side.

Doors and shuttersSecurity doors, shutters and roller doors
Gates and barriersVehicle gates, bollards and access control
SR gradesFour grades, from one to ten minutes
Places coveredStation, Westgate, hospital and colleges

What installation covers in Oxford

Work in Oxford covers a security door at a hospital stores entrance, a roller shutter over a shop front in the city centre, a vehicle gate at a college yard and a barrier at a car park entrance, each fitted to the opening it guards.

Oxford station needs doors and gates that take crowds at peak hours, Westgate Oxford needs service doors and shutters that guard stock rooms behind the shops, and John Radcliffe Hospital needs doors that guard stores and plant rooms while wards keep running.

College buildings often hold older fabric, so fixings are agreed with the site team before work starts, the frame is set without harm to the stone around it, and the finish is matched to the room it sits in.

Yard gates are covered on the security gates in Oxford page, where a gate often stands beside a fitted door, and the specifying security doors guide reads the choices that shape an order.

A car park entrance in Oxford needs a barrier that lifts for staff and stays down for strangers, with a control that the gatehouse can reach at once, and the fitting day is agreed so the entrance never stands open while work runs.

How a site visit shapes the order

A visit starts at the opening. The width and height are measured, the wall build is noted, the floor level is checked, and the way the door will be used each day is written down with the site team.

Access shapes the day as much as the opening. A hospital corridor needs a route kept clear for trolleys, a college yard needs a gate held open for deliveries, and a shop in the city centre needs work timed around trading hours.

The how an LPS 1175 door is specified, step by step guide orders the choices from first measure to final sign off, and the lead times and programme risks for LPS 1175 doors guide shows where a programme can slip.

Drawings and a schedule follow the visit. The schedule names each opening, the door type, the grade and the fixings, so the price, the lead time and the fitting day all rest on the same list.

Need this specified for your project?Free rating, written specification and budget range within one working day.
Get a free quote

LPS 1175 grades, fixing and fit

The fixing schedule fastens LPS 1175 Issue 8.2 (September 2024) fastening the SR scale to the work.

A grade is a length of time a leaf holds under attack with a named tool set. SR1 stands at A1, with one minute of hold. SR2 stands at B3, with three minutes. SR3 stands at C5, with five minutes. SR4 stands at D10, with ten minutes.

Fixing matters as much as the leaf. A frame fixed into sound masonry holds its grade, a frame set into a weak wall needs the wall made good first, and fixings are spaced to the frame size rather than to habit.

See every grade on the LPS 1175 page, and the warranty, defects and guarantees for security doors and barriers guide reads what a warranty covers after handover.

Site Item fitted Grade to quote Fixing note
Oxford station entrance Security door SR2 Frame fixed into masonry, high footfall
Westgate Oxford service door Roller shutter SR2 Guides fixed into the wall itself
John Radcliffe Hospital stores Security door SR3 Stores guarded overnight, route kept clear
College plant room Steel door SR1 Older fabric, fixings agreed with site team
City centre shop Roller shutter SR2 Box above the opening, motor within reach

Lead times, access and working around a live building

Lead time runs from the agreed schedule, not from the first phone call. A graded door is made to the opening size, so the order waits for the visit, the drawings and the signed schedule before the build starts.

The guide for premises on Martyn’s Law carries the tiers, while the standard itself sits on the Martyn’s Law standard page.

Crowd size decides the Martyn’s Law tier for a venue. Enhanced covers 800 people and above, standard covers 200 to 799, and the new duties are expected in spring 2027.

Live buildings need the work kept tidy. Dust is held back from corridors, noise is kept to agreed hours, routes stay clear for staff and visitors, and the site is left tidy when the day ends.

Where a door guards a ward or a lecture room, the fitting day is agreed with the people who use the room, and a second visit is booked where one day will not finish the work.

College work often waits for a break in term, when rooms stand empty and corridors run quiet, so the fitting day is booked around the college calendar and the site team confirms the date in writing.

Handover, checks and aftercare

Handover starts with a walk round the fitted work. The leaf is tried from both sides, the lock is tried with each key, the closer is checked for a full shut, and the drawings are handed over with the keys and codes.

The checks that keep a fitted door working as tested are on the security door maintenance checklist guide, and the LPS 1270 page lists a related set of grades for glazing and screens.

Aftercare is a plain list of checks. Hinges are looked at for wear, seals are checked for gaps, fixings are re-set where they work loose, and any change in the way the leaf shuts is noted at once.

Door samples sit at our Oxford tannery Saffron Road, Romford, Essex RM5 3ES. Hand them the sizes of each door and the names of the rooms, and the team prices door, frame and fixings in a single price.

Email [email protected] by post, and the team writes back inside one working day.

Agree the frame size in writing before the fitting day is set, or the leaf may reach site with nowhere to sit.

Frequently asked questions

How long does a door fitting take in Oxford?

It rests on the opening, the wall build and the grade, so a plain door in a firm wall is quicker than a wide shutter in older fabric, and the visit fixes the day before any work is booked.

Does fitting disturb a live hospital or college building?

Work is timed around the people who use the building, with dust held back, noise kept to agreed hours and routes left clear, and a second visit is booked where one day will not finish the work.

What is handed over at the end of the work?

The keys and codes, the drawings, the schedule with the grade for each opening, and a walk round where the leaf, the lock and the closer are tried with the site team.

Can a new door be fitted into an old frame in Oxford?

Only where the old frame measures true, sits square and takes the fixings for the grade, and a visit checks the frame before any leaf is made.

Tell the team the door sizes and the room names for one price covering door, frame and fixings. Get a free quote

Ready to specify your project?

Free assessment, written specification and test evidence. Reply within one working day.