Services
Installation in Solihull
Installation in Solihull for Touchwood, the NEC and the town centre, with survey, rating, written specification, supply and fitting on one order.
- ✓Third-party test evidence with every product
- ✓Written specification you can issue to tender
- ✓Supplied and installed in Solihull
Get a free quote in Solihull
Rating, written specification and budget range within one working day.
Confidential. No cost, no obligation.
Third-party tested
Evidence with every quote
UK manufactured
Made to your sizes
One accountable team
Specify, supply, install
Confidential handling
Details never shared
Supplied and installed in Solihull
What we supply in Solihull
A Solihull buyer who orders new security doors, windows or barriers starts with the fitting, because a rated product only holds its rating when the frame sits square, the fixings bite into sound material and the gaps close as the test record shows. The product leaves the factory with its rating, and the fitting keeps that rating alive on the building. Installation in Solihull covers doors, windows, gates and barriers on one visit plan, so the work on each opening follows the same written order.
Touchwood shopping centre takes fitting work on shop fronts and entrance doors, where shoppers walk close to the glass and the doors open and shut all day. The National Exhibition Centre takes fitting work on hall doors and entrance screens, where crowds move through wide openings and the doors must shut clean after each rush. Birmingham Airport lies just inside the borough boundary, and its terminal doors and screens take the same fitting care, with each opening measured before the order is placed.
Solihull Hospital takes fitting work on ward doors and entrance glazing, where patients and staff use the doors through the day. Shirley takes fitting work on high street shop fronts, Knowle takes it on village offices, and Dorridge takes it on buildings beside the station. The Solihull area page brings the borough wide picture together in one place.
Solihull buildings and the fitting work they need
A Touchwood shop front needs fixings that hold through constant use, because the doors open for shoppers from morning to night and the frame takes knocks from trolleys and feet. The survey notes the width of each opening, the state of the wall beside it and the floor level at the threshold, and the fitting plan follows those notes. A shop front fitted tight keeps draughts out and lets the door shut on its latch first time.
Inside the National Exhibition Centre, the hall doors stand wide for crowds, and the fitting must let each leaf swing free and shut firm when the hall empties. The frames sit in openings that see forklifts and crates during build up, so the fixings need sound material behind them and the gaps need a clean seal. The fitting plan for a hall names each door, its rating and its ironmongery, and the work follows that plan in order.
The airport terminal, just inside the borough boundary, takes fitting work on screens and doors that keeps queues moving while the glass stays safe. Solihull Hospital takes fitting work on ward doors that staff push open with hands full, and the fitting must leave each door easy to open and firm to shut. The same care reaches the Shirley shop fronts, the Knowle village offices and the buildings beside the station in Dorridge, each measured before the order is placed.
How the rating is fixed before fitting starts
A Solihull buyer complies LPS 1175 Issue 8.2 (September 2024) complying with the grade that the written specification names for each opening, and the grade fixes the tool set and the time the product must hold. A1 is tested to one minute, B3 to three minutes, C5 to five minutes and D10 to ten minutes, with each grade facing its own tool set. The grades run from A1 through H20, and the table below matches each SR grade to an LPS grade and a hold time.
Barrier ratings for a Solihull site now sit under ISO 22343-1:2023, in force after PAS 68:2013 left use in October 2023. The HVM standards notes trace the change from the old barrier standard, while the vehicle impact ratings page carries the ratings in force today. ProtectUK limits the barrier gap to 1,200 mm at most. The barrier height must reach 500 mm at least. The fitting plan must hold both figures at each barrier line.
Two hundred people puts a hall in the standard tier, while 800 people moves it into the enhanced tier, so the crowd size fixes the duties. The new rules put the regulator role with the SIA, and the planned start is spring 2027. Martyn’s Law sets out both tiers and the duties each tier holds. What a building like the National Exhibition Centre must plan is in the premises guide for Martyn’s Law.
A Solihull door takes its fire rating from BS EN 1634-1, under classes E, EW and EI. Those classes run from 30 minutes up to two hours. The fitting must keep the seals and the gaps as the fire test record shows. The push to open a door must stay at or below 30 N through the first 30 degrees under BS 8300, and at or below 22.5 N past that point under Approved Document M. The how to specify notes turn a survey into a written order, step by step.
What the survey and the written specification cover
At the survey each opening is measured and the wall, lintel and sill beside it are checked, and product, rating and finish are picked from those notes. The written specification lists the rating, the product type, the finish and the fixings for each opening, so the supply matches the survey and the fitting matches the supply.
| Solihull building | Fitting job | Building notes |
|---|---|---|
| Touchwood shopping centre | Shop fronts and entrance doors | Doors in constant use all day |
| National Exhibition Centre | Hall doors and entrance screens | Wide openings for crowds |
| Birmingham Airport | Terminal doors and screens | Terminal openings in the borough |
| Solihull Hospital | Ward doors and entrance glazing | Doors used through the day |
| Shirley | High street shop fronts | Shop fronts on the high street |
The table holds five Solihull buildings, with a fitting job and a short note for each one. The table is a short version of the full specification, which names every opening on the building.
Survey, supply, fitting and handover in Solihull
Each opening is measured at the survey, and the written specification follows from it, with the written answer reaching the buyer inside one working day. The installation handover notes give the detail for the checks at handover, and the same checks apply to a Solihull door, window or barrier.
The order moves in five steps. The survey measures the opening and notes the wall, the lintel and the sill. The rating for that opening is settled from the evidence. A written specification lists rating, product type, finish and fixings. Supply is made to the specification, and the fitting places the product in its opening with the fixings named beside it. Each step waits for the one before it, so the product as fitted matches the product as specified.
A fitting job runs alongside other work on the same building. Beside the fitting, security doors in Solihull guard the entrance doors, and blast-resistant doors in Solihull guard doors that also need a blast rating. For doors that must hold against bullets, the bullet-resistant doors in Solihull page gives the door detail, and SR2 fire doors in Solihull cover doors that also need fire resistance. The maintenance page covers the checks that follow handover.
Send the opening sizes and the fitting date request to the chase Saffron Road, Romford, Essex RM5 3ES. Phone directly with the sizes noted and the grade chosen, and a survey day can be agreed.
Email [email protected] with testing booked for the opening sizes and the grade, and the reply in writing gives the Solihull fee and the scope of the survey.
Check the rating against the product as fitted, and match the fixings to the wall behind each opening.
Questions from Solihull buyers about installation
What does the survey measure on a Solihull building?
Each opening is measured, and the wall, lintel and sill beside it are noted down, then the choice of product, rating and finish follows from that visit.
When does the written specification reach the buyer?
The written answer reaches the buyer inside one working day, and it lists the rating, the product type, the finish and the fixings for each opening.
What rating does a Solihull door need?
The rating is picked from the risk at each opening, with LPS 1175 grades from A1 to H20 and fire ratings from BS EN 1634-1, and the written specification names the grade for each opening.
Where in Solihull does fitting work go first?
Crowded openings take priority, from the Touchwood shop fronts and the hall doors at the National Exhibition Centre to the airport terminal doors and the hospital ward doors.
Get the fitting planned for your Solihull building
Send the opening measurements with the rating. One fee covers the survey, the fitting and the file. Get a free quote
Other areas
Installation in other areas
Ready to specify your project?
Free assessment, written specification and test evidence. Reply within one working day.