Perimeter and HVM · PAS 68 and IWA 14-1
Sliding vehicle gates in West Midlands
Sliding vehicle gates for West Midlands depots, airports, hospitals and retail yards, sized to each opening with LPS 1175 grades and safe controls.
- ✓Third-party test evidence with every product
- ✓Written specification you can issue to tender
- ✓Supplied and installed in the West Midlands
Get a free quote in the West Midlands
Rating, written specification and budget range within one working day.
Confidential. No cost, no obligation.
Third-party tested
Evidence with every quote
UK manufactured
Made to your sizes
One accountable team
Specify, supply, install
Confidential handling
Details never shared
Supplied and installed in the West Midlands
What we supply in the West Midlands
A depot yard off the M42 takes lorries from first light, and its gate has to open wide, slide clear of the roadway, and shut behind each vehicle without holding up the queue. Round the West Midlands that pattern repeats at the NEC, at Birmingham Airport in Solihull, and at the logistics parks and depots that line the M6.
A sliding vehicle gate answers that pattern with one leaf that runs sideways on a ground track, driven by a motor unit at one end of the run. The leaf parks beside the opening instead of swinging out over the pavement, so a yard with a short apron keeps its depth for turning lorries. That sideways travel suits wide openings, where swing leaves would need room the yard does not hold.
Birmingham, Coventry and Solihull set the busiest briefs, with stations, malls and an airport moving people and freight through the same hours, while Wolverhampton, Dudley, Walsall and West Bromwich ask the same of smaller yards and retail delivery bays. Each gate takes its width from the largest vehicle that uses the opening, its grade from the risk at that boundary, and its controls from the staff who run the yard, so no two schedules read alike. These gates sit among the other products that guard the region, listed under physical security in the West Midlands.
Where a sliding gate earns its keep round the West Midlands
The NEC draws exhibition traffic in waves, with lorries arriving ahead of each show and leaving once the halls clear, so its service yards need gates that open fast and stay open while a convoy passes. A sliding leaf clears the full width of the opening and parks out of the way while vehicles queue inside, and the gate closes behind the last lorry.
Birmingham Airport in Solihull runs cargo and service vehicles through gates close to public roads, where a swinging leaf would reach over the footpath. The logistics parks and depots round the M42 and the M6 face the same pinch, with articulated lorries turning in from dual carriageways and a gate that must clear before the next vehicle reaches the entrance. A sliding leaf keeps the approach free.
Queen Elizabeth Hospital Birmingham runs ambulances, supply lorries and waste vehicles through its service entrances at all hours, and Walsall Manor Hospital runs a smaller version of the same pattern, with deliveries timed round ward routines. The University of Birmingham and Coventry University move catering and maintenance vehicles through campus gates beside pedestrian routes, while the Bullring and Merry Hill take retail deliveries through yards that fill before opening time. Each of those gates sits on a boundary where vehicles and people cross, so the controls keep the two apart.
Ratings that sit behind a West Midlands sliding gate
The gate schedule knits LPS 1175 Issue 8.2 (September 2024) knitting each opening to a forced entry grade that matches the risk at that boundary. SR1, class A1, holds one minute; SR2, class B3, holds three; SR3, class C5, holds five; and SR4, class D10, holds ten, and the grade rises where the yard holds high value stock. The LPS 1175 standard page lists all four grades.
Vehicle impact sits beside forced entry on a yard gate. ISO 22343-1:2023 has replaced PAS 68:2013. The switch came on 25 October 2023, so a gate built to stop a vehicle earns its rating under the newer standard, listed on the vehicle impact ratings page. A hostile vehicle line keeps the clear gap between units to 1,200 mm at most, and each unit stands at least 500 mm high, which shapes how bollards and barriers sit beside the gate. The bollard guide pairs those units with a gate.
Five openings below show how a schedule pairs a site with a build, a drive and a grade.
| Opening in the West Midlands | Gate build | Drive and control | Forced entry grade |
|---|---|---|---|
| Service yard, NEC | Steel leaf, mesh infill | Ground track, motor drive | SR2, class B3 |
| Cargo gate, Birmingham Airport | Steel leaf, solid infill | Ground track, motor drive, intercom | SR3, class C5 |
| Delivery yard, Bullring Birmingham | Steel leaf, mesh infill | Ground track, motor drive | SR2, class B3 |
| Service entrance, Queen Elizabeth Hospital | Steel leaf, solid infill | Ground track, motor drive, access control | SR2, class B3 |
| Delivery yard, Merry Hill Dudley | Steel leaf, mesh infill | Cantilever track, motor drive | SR1, class A1 |
Martyn’s Law should start in spring 2027, with the enhanced tier for places holding 800 people or more, and 200 to 799 people marking the standard tier, so a gate at a crowded venue carries duties beyond its own leaf. The Martyn’s Law standard spells out the duties each tier brings. The transport hub guide covers gates at stations and airports.
What the gate specification names for each opening
A specification starts with the opening: the clear width the largest vehicle needs, the height the leaf must reach, and the ground the track will sit on, since a track over broken ground soon runs rough. The run beside the opening needs room for the full leaf plus its drive unit, on a level base that keeps the leaf true through every cycle. The gate automation guide covers the drive and the controls that move the leaf.
Controls follow the staff who use the gate. A yard with a staffed gatehouse takes a different answer from one where drivers call in on an intercom, and a hospital service road takes timed opening round delivery slots. Safety edges, photocells and a manual release sit on every schedule, so the leaf stops for a person or a vehicle in its path, and staff can move it by hand when the power drops. The automatic gates cost guide shows what moves the price, from leaf size to control choice.
Gates beside the sliding gate on one boundary
A sliding gate seldom guards a boundary alone. The security gates page covers swing and pedestrian gates beside it, and the hostile vehicle mitigation page names the barriers and bollards that stop a vehicle where a gate leaves a gap. The West Midlands bollards page pairs those units with gates across the region.
Inside the boundary, other gates take the smaller duties. The warehouse gates guide covers gates at depots and stores, and the hospital gates guide covers gates at service roads and wards. The vehicle barrier due diligence guide covers the checks that run before a barrier is chosen.
Measuring the run and drawing each gate
Each gate is measured in place before it is specified. The surveyor notes the clear width and height of the opening, the length of the run beside it, the slope of the ground, and where power reaches the drive unit, then how vehicles approach and where pedestrians cross. Sketches and photos fill the job file, and the schedule is built from them.
Job notes stay at our West Midlands dormer Saffron Road, Romford, Essex RM5 3ES. Give them to the surveyor with each gate width, so each grade sits with its drawing.
Send the gate widths and ratings to [email protected] to agree the schedule before it is set, and a written reply lands the next working day.
Checks to make before the gate is ordered
Walk the full run before the order goes in. A drain cover, a kerb lip or a patch of broken ground under the track will catch the leaf on its first cycle, so the ground is put right before the gate arrives.
Check each opening width against its largest vehicle, each grade against its risk, and each safety device against its test, and hold the order until every line reads true.
West Midlands buyers ask about sliding vehicle gates
Can a sliding gate close a wide yard entrance?
Yes. A single leaf runs on a track sized to the opening, and a wide entrance takes a longer leaf with a drive unit rated for its weight. Where one leaf would grow too heavy, a pair can meet in the middle, each on its own track.
What moves the gate when the power fails?
A manual release frees the leaf from its drive, so staff can slide it by hand until power returns. The release sits where staff can reach it without tools.
Does a sliding gate need planning permission?
Sometimes. A gate facing a public road may need permission, and a listed building or a conservation area adds its own conditions. The planning permission guide lists the cases that need an application.
What care does a sliding gate need through the year?
Care starts with the track: leaves, grit and standing water are cleared so the rollers run true, then the drive, the safety edges and the photocells are checked in turn. The handover guide lists the checks that keep a gate in daily use.
Sliding vehicle gates for a West Midlands yard?
Send the opening width, the largest vehicle that uses it, and the grade the boundary needs. Get a free quote
Other areas
Sliding vehicle gates in other areas
Ready to specify your project?
Free assessment, written specification and test evidence. Reply within one working day.