Perimeter and HVM · PAS 68 and IWA 14-1
Sliding Vehicle Gates in Reading
Sliding vehicle gates for Reading data centres, business parks and station sites. Rated gates, written specification and a reply in one working day.
- ✓Third-party test evidence with every product
- ✓Written specification you can issue to tender
- ✓Supplied and installed in Reading
Get a free quote in Reading
Rating, written specification and budget range within one working day.
Confidential. No cost, no obligation.
Third-party tested
Evidence with every quote
UK manufactured
Made to your sizes
One accountable team
Specify, supply, install
Confidential handling
Details never shared
Supplied and installed in Reading
What we supply in Reading
A sliding vehicle gate suits a Reading site where the entrance is wide and the ground in front of it is in constant use. The leaf slides back beside the fence instead of swinging out, so delivery lorries, staff cars and visitors can queue close to the line without blocking the gate. Data centres, business parks and the station area all have entrances of this kind, and the gate has to hold its rating while it is worked many times a day.
This page covers the gate types that fit Reading sites, the ratings to put on the schedule, and the steps from survey to handover. The buyer is usually the facilities manager or the estates lead, and the choice turns on the opening width, the ground, the power supply and the threat the site has assessed. Every figure below is tied to a published standard, and the written specification names the rating for each gate.
Choosing a sliding gate for a Reading site
Two gate forms cover most Reading openings. A tracked gate runs on a ground rail and suits a level yard with a firm base, while a cantilever gate runs on rollers fixed to a frame and suits ground that is uneven or crossed by services. The choice is fixed at the survey, once the run-back length, the ground fall and the services below the line are known. A gate that is ordered before that survey risks a leaf that binds or a drive that works too hard. Anti-ram gates and barriers show how the gate line, the fence and the bollards work as one vehicle barrier.
The leaf itself is a steel frame with infill to match the fence line, and the drive, safety edges, photocells and access control are sized with it. A gate that serves a data centre yard works far more often than a gate on a small business park, so the motor, the gearing and the control panel are matched to the number of movements a day. The pedestrian route stays separate from the vehicle lane, with its own gate and a clear line of sight for the driver.
Ratings that belong on a gate schedule
Forced entry ratings for gates and their frames sit under LPS 1175, and the grade sets how long the gate must hold against a named tool set. The guide relates LPS 1175 Issue 8.2 (September 2024) relating each grade to the minutes it holds. SR1 holds for one minute, SR2 holds for three, SR3 holds for five and SR4 holds for ten, and the grade is chosen from the threat assessment for that entrance, not from the gate next to it.
| Grade | Class | Hold time | Typical use |
|---|---|---|---|
| SR1 | A1 | 1 minute | General entrances |
| SR2 | B3 | 3 minutes | Server rooms and plant areas |
| SR3 | C5 | 5 minutes | Data centre halls, plant rooms and battery stores |
| SR4 | D10 | 10 minutes | Battery stores and electrical rooms |
Vehicle impact ratings sit under a separate scale. PAS 68:2013 is no longer the current vehicle impact standard. ISO 22343-1:2023 has carried the scale since the withdrawal on 25 October 2023. Vehicle impact ratings are listed on the standards page, with the rating set by vehicle mass and speed. HVM guidance keeps the clear gap between items to 1,200 mm or less and the height to 500 mm or more, so a gate line is drawn with bollards or barriers that close the gaps at each side. A fire-rated doorset beside the gate needs its own fire class as well. BS EN 1634-1:2014+A1:2018 catalogues integrity, insulation and radiation ratings from 30 to 120 minutes.
Crowded place duties also shape the schedule. Martyn’s Law has a due start of spring 2027, with premises of 200 to 799 taking the standard tier and premises from 800 upward taking the enhanced tier, and the SIA as regulator. It received Royal Assent on 3 April 2025. A pedestrian gate beside the vehicle gate takes its force figures from BS 8300 and Approved Document M. The limit is 30 N over the first 30 degrees. After the first 30 degrees the limit is 22.5 N.
Fix the rating, the opening width and the run-back length at the survey, and the gate, the fence and the access control will work as one line.
How a Reading gate project runs
Work on a Reading gate starts with a survey of the entrance, the ground and the services that cross the line. The surveyor measures the opening, the run-back length and the fall across the track, and notes the power supply, the drainage and the fence line the gate has to meet. The rating for the gate is then agreed with your team from the threat assessment, and the specification that follows names the grade, the leaf size, the drive and the controls.
Supply follows the written specification, with the gate built to the sizes measured on site. Fitting is phased so the entrance stays in use where the site needs it, and the handover pack lists the rating, the test evidence and the notes for looking after the gate. Email [email protected] with routes and vehicle sizes in your message and we reply in one working day.
Write to our office at the gate control Saffron Road, Romford, Essex RM5 3ES enquire tonight for a written specification and a survey date.
Where sliding gates fit in Reading
Reading holds a data centre cluster that ranks among the largest outside London, and those sites plan their protection in layers from the boundary to the halls. Sliding gates control the vehicle entry to yards, plant areas and battery stores, with LPS 1175 doorsets on the halls behind them. The guide to data centre physical security by zone shows how the fence, the gate and the halls are layered as one design.
The business parks around the town hold head offices and research units with light industrial space beside them, and their entrances take security gates that work all day without a guard on the line. The station area is tighter, with forecourts, taxi ranks and bus stops close to the building front, so the run-back length and the pedestrian flows are fixed at the survey. Town centre retail takes a gate for service yards and out-of-hours frontages, and the commercial stock in the centre is mostly modern, though conservation areas still apply in parts of the centre. Due diligence on vehicle security barriers covers the approach speed, the ground and the power supply before any gate is ordered.
Service yards behind town centre retail and light industrial units take a gate that opens for deliveries and stays shut at other times. Delivery drivers use a code or a fob on the gate, and staff use the pedestrian gate beside it. The control panel, the safety edges and the photocells are tested at handover, and the maintenance notes in the pack name the checks to run through the year.
Questions about sliding vehicle gates in Reading
How wide can a sliding vehicle gate be?
The width is set by the opening measured on site, the run-back length beside it and the drive that moves the leaf. A survey fixes all three before the gate is ordered, so the leaf clears the fence line and the motor is matched to the weight it moves.
Does a sliding gate need a level yard?
A tracked gate needs a firm, level base for the rail, while a cantilever gate suits ground that is uneven or crossed by services. The surveyor checks the fall and the services below the line, then names the gate form that fits the ground.
What rating should a data centre gate carry?
The threat assessment for that entrance sets the rating, and LPS 1175 grades start at SR1 at one minute and rise to SR4 at ten minutes. The written specification names the grade for the gate, the fence line and the doorsets behind it as one layered design.
How long does a gate project take?
The survey and the written specification lead the work, and a rating check with a budget range arrives in one working day. Supply and fitting follow the sizes surveyed on site, and the handover pack lists the rating and the test evidence for the gate.
Give the team the opening width and the rating, and a written specification follows with the survey date.
Other areas
Sliding vehicle gates in other areas
Ready to specify your project?
Free assessment, written specification and test evidence. Reply within one working day.