Certified physical security

ArxBridge
Sandstone and glass offices with a steel entrance door in Leeds

Perimeter and HVM · PAS 68 and IWA 14-1

Sliding Vehicle Gates in Leeds

Sliding vehicle gates for Leeds yards, hospitals and car parks, with LPS 1175 and impact ratings, automation, safety devices and a written specification.

  • ✓Third-party test evidence with every product
  • ✓Written specification you can issue to tender
  • ✓Supplied and installed in Leeds
Prefer to talk?+44 7352 267239

Get a free quote in Leeds

Rating, written specification and budget range within one working day.

ArxBridge Quote Form

Confidential. No cost, no obligation.

Third-party tested

Evidence with every quote

UK manufactured

Made to your sizes

One accountable team

Specify, supply, install

Confidential handling

Details never shared

Supplied and installed in Leeds

What we supply in Leeds

More on this

A wide entrance in Leeds needs a gate that opens for the right vehicles and shuts for the rest, without taking the room a swing gate would need. The leaf slides to one side along the boundary, so a yard in Armley, a depot in Cross Gates or a car park by Leeds station can keep a broad opening for lorries and cars and still close it firm at night.

Leeds gives the gate plenty to handle. Kirkgate Market and the Trinity and Victoria Quarter arcades draw crowds and delivery vans into the centre, the Merrion Centre and the station hold car parks that fill and empty all day, and South Bank and Leeds Dock hold new quarters beside older yards. A sliding leaf keeps the pavement and the road clear while it moves, which matters where the streets are narrow and the pavements are busy.

Whether the gate serves the site turns on three things: the class it holds, the ground it runs on and the safety gear fitted to it. Put the forced entry class, the impact class for any vehicle route, the motor and the safety devices into a single specification, and the gate should open on day one and keep opening through winter grit.

Armley and Kirkstall yardsDepots and builders merchants
Leeds station car parksCars and coaches all day
Hospitals in the cityLeeds General Infirmary and St James’s
South Bank and Leeds DockNew quarters by the river Aire

Where Leeds sites put a sliding vehicle gate

Yards in Armley, Kirkstall and Cross Gates take the heaviest traffic. Lorries and vans pass through from early morning, and the leaf, its track and its foundation must carry that load without sagging or jamming. A level yard with a clear run takes a tracked gate. A yard where grit and puddled water would block a track takes a cantilever gate instead. The physical security in Leeds page shows where those yards stand beside housing and offices around the city.

Car parks by Leeds station and the Merrion Centre work on a different rhythm. Cars arrive and leave all day, coaches drop off beside the station, and the gate must open for ticket holders and shut for the rest without holding the queue. A pedestrian lane beside the vehicle gate keeps people clear of the moving leaf, and the pedestrian gates guide covers running the two lanes as one entrance.

Hospitals plan their gates around the ambulance route first. A gate at Leeds General Infirmary or St James’s must leave the ambulance route open at every hour, and a gate at the University of Leeds opens for students and staff and shuts against anyone else. Ambulance route planning at a hospital entrance is covered in the hospital security gates guide, and the education sector page shows where gates sit around a campus.

What governs a sliding gate rating in Leeds

The specification anchors LPS 1175 Issue 8.2 (September 2024) onto the Leeds gate order, with SR2 as class B3. Under the standard, a gate earns its class from the tools named for the test and the minutes it must hold, running from SR1, class A1, through SR2, class B3, SR3, class C5, to SR4, class D10. One rating covers the whole entrance, leaf, posts and foundation together, and the evidence should name all three. The full class list sits on the LPS 1175 page, and the gates and grilles guide shows how each class is applied to the leaf, the posts and the lock of a gate.

The impact test for a gate now sits under ISO 22343-1:2023, which took the place of PAS 68:2013, withdrawn 25 October 2023. IWA 14-1 has been replaced by that same standard too, so a quote that still names PAS 68 should be met with a request for ISO 22343-1:2023 evidence instead. Where the gate must hold against forced entry too, the evidence should cover both standards. Each impact class is listed on the vehicle impact ratings page, and the HVM standards guide sets out how the three standards relate.

A powered gate brings safety duties with it. The moving leaf has to halt the instant it meets an obstruction, and staff need a hand release to open it when the power fails. Those duties fall to the installer and the site owner jointly, and the safety devices are tested at handover, not left to the first fault. The automatic vehicle barriers guide shows how a powered entrance is planned as a whole, and the ISO 22343 barriers guide sets out the impact classes a barrier or gate can hold.

Need this specified for your project?Free rating, written specification and budget range within one working day.
Get a free quote

How to specify a sliding gate in Leeds

Begin at the entrance, with the vehicles that use it. Take the clear width, the run back the leaf needs and the levels across the entrance, then count the lorries, vans and cars that pass each day. A Cross Gates depot entrance with lorries all day calls for a heavier leaf and deeper footings than a car park entrance used by cars at set times.

Next, settle leaf, posts and foundation together as one set. The three share one rating, so the posts and the foundation must match the leaf, or the class on the order will not hold on site. The ground picks the form: a level run takes a tracked gate, a firm base takes a cantilever gate, and grit or standing water in a track rules the tracked form out. The Sliding vehicle gates range holds the form for a long boundary, while the crash rated HVM fencing guide sets out how the fence line beside it is rated.

Then settle the motor, the safety gear and the price. The motor has to suit the leaf and the daily cycle count, the safety devices have to bring the leaf to a stop on contact, and a hand release has to cover a power cut. The cost factors guide breaks down the price, and the safety duties guide lists the duties that run beside the automation.

Leeds use Form Rating to name How it runs
Armley yard Tracked sliding gate SR2 with ISO 22343-1 Powered, high cycle
Station car park Tracked sliding gate SR2 Powered, timed access
Hospital ambulance route Cantilever sliding gate SR2 Powered, on demand
South Bank quarter Tracked sliding gate SR2 Powered, timed
Kirkstall depot Cantilever sliding gate SR2 with ISO 22343-1 Powered, high cycle

Project steps for a sliding gate in Leeds

Work begins at the entrance, with a survey of every gate position. The surveyor notes width, run back, levels, power and the ground the gate will stand on, plus the fence line it must meet. A photo and a sketch of each entrance anchor the specification.

Next the rating and the form are written down for each entrance: the SR or impact class, the leaf and the posts, the foundation, the motor, the safety devices and the duty cycle. The gate is delivered with its evidence file, and the survey is checked against the specification before any ground is broken.

Fitting is timed around the site, with yard hours and delivery slots kept in mind. Send the entrance widths and the rating to [email protected]. The written specification and the budget range reach you inside one working day.

Check the run back before the gate is ordered. A sliding leaf needs clear space to run into, and a fence, a bin store or a parked van in that space stops the gate from opening.

Questions about sliding vehicle gates in Leeds

Which form fits a Kirkstall depot, tracked or cantilever?

Look at the ground first. A tracked gate needs a level run that stays clear, so a depot floor that collects grit and water points to a cantilever gate instead, which hangs from its frame and never touches the track. The survey records the ground before the form is chosen.

How does a Leeds car park gate stay shut at night?

Access control holds it. Ticket holders and residents open the gate with a fob, a code or a plate reader, and the leaf stays shut for anyone else. The motor, the reader and the safety devices are set as one system at handover, and the gate automation guide explains how the parts work together.

Can a sliding gate guard a hospital ambulance route?

Yes, when the route stays clear. The gate opens for ambulances on demand and shuts behind them, and the safety devices must never leave the leaf blocking the route. The hospital security gates guide explains how the entrance is planned around the ambulance route.

What does a maintenance visit cover on a sliding gate?

The visit covers the leaf, the track or the cantilever frame, the motor, the safety devices, and parts showing wear are changed before they break down. What a contract covers is listed in the maintenance contract scope guide, and the visits themselves sit with the maintenance service.

Planning a sliding vehicle gate for a Leeds site? Share the width of the entrance, the space behind it and the rating.

Get a free quote

Ready to specify your project?

Free assessment, written specification and test evidence. Reply within one working day.