Perimeter and HVM · PAS 68 and IWA 14-1
Sliding vehicle gates in Bristol
Sliding vehicle gates in Bristol for schools, depots, hospitals and venues, with automation, safety duties and vehicle impact ratings covered.
- ✓Third-party test evidence with every product
- ✓Written specification you can issue to tender
- ✓Supplied and installed in Bristol
Get a free quote in Bristol
Rating, written specification and budget range within one working day.
Confidential. No cost, no obligation.
Third-party tested
Evidence with every quote
UK manufactured
Made to your sizes
One accountable team
Specify, supply, install
Confidential handling
Details never shared
Supplied and installed in Bristol
What we supply in Bristol
Sliding vehicle gates in Bristol suit entrances where a swing gate would block the road or the yard behind it. The gate leaf runs sideways on a track or a cantilever, so vehicles keep the full width of the entrance while the gate itself needs no swing arc inside the site. For a school, a depot or a venue, that sideways run is often the deciding factor.
Bristol has entrances of every size, from the service yard of a hospital to the main gate of a stadium. Physical security in Bristol covers the wider city picture, and the choice at each entrance turns on three facts: the width of the opening, the ground the gate runs on, and the vehicles that pass through it every day. Ashton Gate, Bristol Airport and the depots at Avonmouth all show the same pattern, a wide entrance with heavy traffic and no room for a swing.
A sliding gate is specified by its leaf, its track, its motor and its safety devices, and the rating that matters most depends on the threat. A gate tested to LPS 1175 carries an SR rating for forced entry, while a gate on a hostile vehicle mitigation line carries a vehicle impact rating instead. The two ratings answer different questions, and the sections below keep them apart.
Where a sliding gate suits a Bristol entrance
Ashton Gate shows why a sliding gate fits a venue. The entrance must take coaches, delivery lorries and emergency vehicles on a match day, and a sliding leaf clears the full width without swinging into the crowd or the road. Venues holding 800 or more people sit in the higher of the two Martyn’s Law tiers, and the law should go live in spring 2027 after Royal Assent on 3 April 2025, so the gate line is part of a wider plan for the site.
Bristol Airport and the depots at Avonmouth need gates that cycle many times a day and keep working in wet weather. Where the ground runs uneven, or a yard track would fill with debris, a cantilever leaf suits the entrance, because it hangs from a frame and runs clear of the ground. A tracked gate fits a level concrete apron, where the track stays clean and the leaf runs true. Security gates for a depot yard often sit beside a sliding leaf, and warehouses and logistics sites should settle the cycle count before the motor is chosen.
Schools, hospitals and university sites use sliding gates to separate vehicle traffic from pedestrians at the entrance. Southmead Hospital, the University of Bristol and UWE all run busy frontages where a sliding leaf keeps the pedestrian route clear while vehicles pass. A pedestrian gate beside the vehicle gate stops foot traffic from slipping through the vehicle opening, and the two gates should be specified together. The design visit should map the pedestrian route first, because a gate that forces people through the vehicle lane fails on its first day.
How gate ratings and vehicle impact standards differ
A gate leaf tested to the standard carries one of four ratings. The scale summarises LPS 1175 Issue 8.2 (September 2024) inside the four ratings, SR1 to SR4, with delays of 1, 3, 5 and 10 minutes against tool sets A, B, C and D.
Vehicle impact ratings answer a different question. On 25 October 2023 the current list dropped the PAS 68:2013 document. The tests it once set out now sit under ISO 22343-1:2023, and IWA 14-1:2013 gave way to the same ISO standard. A gate or barrier on a hostile vehicle mitigation line should be specified to ISO 22343-1:2023, with the test vehicle mass and the test speed named in the order. Test vehicle masses run from 1,500 kg up to 30,000 kg, and test speeds run at 48, 64 and 80 km/h.
The line the gate protects also needs its gaps settled. ProtectUK guidance puts the maximum clear gap at 1,200 mm and the minimum height at 500 mm, so no vehicle passes between the gate and the next fixed point. A powered gate also carries safety duties: safety edges, photocells and a safe stopping distance, with the controls placed where the operator can see the full leaf travel. The motor and control choices follow the gate automation guidance, and the safety devices should be tested at handover rather than left to the first service visit.
Points to settle before the gate is ordered
An order should name the leaf, the track, the motor, the safety devices and the finish, with the opening width and the ground levels agreed first. Start by agreeing the opening width and the ground levels, plus the widest vehicle, then match the gate to the approach. The cost factors for a sliding gate turn on the leaf weight, the motor size and the length of the track run, so a long cantilever leaf costs more than a short tracked leaf.
| Approach | Test vehicle | Test speed | Gate and fence line |
|---|---|---|---|
| School or hospital entrance | 1,500 kg | 48 km/h | Sliding leaf with a pedestrian gate beside it |
| Depot yard | 30,000 kg | 48 km/h | Heavy leaf with a second barrier behind the line |
| Open approach road | 1,500 kg | 80 km/h | Sliding leaf with a fenced run and a clear gap of no more than 1,200 mm |
A depot that needs a higher impact rating can pair the gate with rising bollards behind the line, so a vehicle that beats the gate still meets a second barrier. The finish should be settled at the same time as the leaf, because a gate that stands in the weather all year needs a coating that holds up to rain and road salt.
The order of work on a sliding gate job
The job starts with a visit to the entrance. The team measures the opening, the run for the leaf, the ground levels and the space for the motor and the controls, and notes any drains or services that cross the track line. A photo of the entrance and the gate width help the office price the job, and the ground levels decide whether the leaf runs on a track or hangs from a cantilever frame.
Handover covers the controls, the safety edges, the manual release and the service plan. A gate that cycles many times a day needs its track cleared, its rollers checked and its safety devices tested, and the service plan should name the interval for each. The installation and maintenance visits keep the leaf running true, and a fault found early costs less than a gate stuck shut across a depot entrance.
A sliding gate is only as strong as its track and its frame. A heavy leaf on a weak foundation will drag, wear its rollers and fail its safety checks, so the ground works deserve the same attention as the leaf.
Questions about sliding gates in Bristol
Does a sliding gate need planning permission?
A sliding gate that replaces an existing gate of the same height often needs no separate permission, but a taller gate, a new entrance or a gate on a listed building can need consent. The planning rules for gates are covered in our guide, and the local planning office gives the final word for the street.
Tracked or cantilever: which suits my entrance?
A tracked gate fits a flat concrete apron where the track stays clean, and it carries a heavy leaf at a lower cost. Uneven ground, or a yard whose track would fill with debris, calls for a cantilever leaf, because it hangs from its frame above the ground. The ground levels at the entrance decide the answer, not the leaf size.
What does a powered gate do in a power cut?
A powered sliding gate should have a manual release so staff can move the leaf by hand, with the release reachable without tools. The handover should show the site team how the release works, and the service plan should test it at each visit.
Does Martyn’s Law change the gate at a venue?
A venue holding 800 or more people falls in the enhanced tier, which should go live in spring 2027, so the gate line, the pedestrian routes and the staff procedures are planned together. A venue below that capacity sits in the standard tier, where procedures carry more weight than physical measures. The Martyn’s Law page names the two tiers and the dates.
Send the gate width, the ground levels and a photo of the entrance to [email protected]. We send back a written specification and an indicative price from our team based at ArxBridge, Saffron Road, Romford, Essex RM5 3ES. The reply reaches you by the next working day.
Other areas
Sliding vehicle gates in other areas
Ready to specify your project?
Free assessment, written specification and test evidence. Reply within one working day.