Certified physical security

ArxBridge
Steel security bollards with amber bands outside a UK office entrance at dusk

Perimeter and HVM · PAS 68 and IWA 14-1

Sliding vehicle gates in Coventry

Sliding vehicle gates in Coventry for depots, hospitals, campuses and service yards, with leaf, track, drive and safety set out for each entrance.

  • ✓Third-party test evidence with every product
  • ✓Written specification you can issue to tender
  • ✓Supplied and installed in Coventry
Prefer to talk?+44 7352 267239

Get a free quote in Coventry

Rating, written specification and budget range within one working day.

ArxBridge Quote Form

Confidential. No cost, no obligation.

Third-party tested

Evidence with every quote

UK manufactured

Made to your sizes

One accountable team

Specify, supply, install

Confidential handling

Details never shared

Supplied and installed in Coventry

What we supply in Coventry

More on this

A wide entrance in Coventry is best shut by a leaf that slides sideways. It runs back beside the fence on its rail instead of swinging out across the pavement or the road, so lorries keep moving while the gate opens and the entrance stays usable through the whole movement. The leaf, the rail, the rollers and the motor are sized as one set from the clear width, the slope of the ground and how much traffic passes through the entrance, and a level rail bed with a clear run-back is what keeps the gate moving freely. The sliding vehicle gates range covers that leaf alone, while the security gates page covers gates of every type.

The entrances around the city show the range. Yards and depots by the ring road open their gates for lorries through the working day, University Hospital Coventry runs a yard gate serving deliveries and waste lorries, and Coventry University runs campus gates that divide teaching areas from service roads. The Coventry Building Society Arena opens service entrances for event traffic and shuts them again after the crowd leaves, the Transport Museum and the Belgrade Theatre keep yard gates behind their public fronts, and the railway station keeps yard gates behind the public areas at Friargate. Works around Whitley open gates for shift traffic, and the Cathedral quarter hides yard gates beside older walls and narrow lanes.

No swingLeaf slides sideways, so the road stays open
Measured firstWidth, ground fall and traffic set the leaf and motor
Rated leafLeaf, frame and lock carry an SR rating where one is named
Safety gearEdges, photocells and a manual release listed

What the leaf, the rail and the motor do

The schedule asserts LPS 1175 Issue 8.2 (September 2024) stating the SR scale that leaf, frame and lock are measured against. SR1 holds for one minute under tool set A1, SR2 for three minutes under B3, SR3 for five minutes under C5, and SR4 for ten minutes under D10. Every part has to match the rating named in the specification, so a heavy leaf in a frame that cannot hold it still gives way, and a solid lock fixed to a frame that yields gives way with it. The full scale appears on the LPS 1175 page, and the rating on the order is the rating the fitted gate must meet. The gates and grilles guide applies each rating to leaf, posts and lock.

The leaf can run on rollers along a rail set into the ground, or it can hang from a cantilever frame where a ground rail would clog with debris. Which of the two suits the entrance comes down to the ground itself, the traffic passing through, and how the entrance gets used day to day. A railed gate needs a level bed and a rail kept clear of stone and grit; a cantilever gate needs a stiff frame and a counterbalance that keeps the leaf steady across its whole travel. The automatic gates cost factors page breaks down the price of the leaf, the rail and the motor, and the walkthrough on anti-ram gates and barriers covers entrances where the gate must also stop a vehicle.

Tracked or cantilever: choosing the run

Width, height and wind load fix the leaf: solid for privacy, barred where staff need to see through the entrance. The motor follows leaf weight and how often the gate moves: a light duty motor where the gate opens now and then, a heavy duty motor where a depot gate cycles several times an hour. The ratings for entrances where a vehicle strike is a risk are shown on the vehicle impact ratings page. The checks a buyer runs before ordering are set out in the vehicle security barriers due diligence guide.

Where the gate sits in a hostile vehicle mitigation line, the gaps at its sides matter as much as the leaf. The clear gap beside the line must not pass 1,200 mm and the lowest height is 500 mm, so nobody slips through beside the gate and no vehicle passes under it, and a test result to ISO 22343-1:2023, one example being V/7500[N3]/80/90:0/0, notes the vehicle, the speed and how far the vehicle moved past the line. PAS 68:2013 left the list on 25 October 2023, superseded by ISO 22343-1:2023, so a new gate is quoted against the current test. The hostile vehicle mitigation page covers the line as a whole, of which the gate forms one part.

Fitting, safety checks and the yearly routine

Work begins at ground level, with the rail bed dug, levelled and set before the leaf goes up. The surveyor notes opening width, fall across the run and clear space beside the opening, so the leaf delivered to site sits clear of the entrance once open. The writing an operational requirement guide gives the buyer a list to agree before fitting starts.

Care afterwards is mostly sweeping and testing. The rail is cleared of stone and grit, the safety edges and photocells are put through their paces, the rollers are checked for wear, and the motor is tested for the force it exerts when the leaf meets something in its path. A leaf that sticks, a roller that rumbles or a safety edge that no longer halts the leaf is dealt with before the next visit, so the gate keeps moving freely in wet months and dry months alike. The order is priced from the Romford works, Saffron Road, Romford, Essex RM5 3ES along the route the handover pack takes, and programming a security door and barrier package shows how gate, access control and barriers are set to work together.

Entrance Leaf Motor Site check
Depot yard Solid steel High cycle Rail, rollers, safety edges
Hospital service yard Barred Standard Photocells, lock, rail bed
Campus service road Barred Standard Run-back clear, rollers
Arena service entrance Solid steel High cycle Lock, motor force, safety edges

A sliding gate moves only as well as its rail. When the bed drops or grit collects in the rail, the leaf begins to stick and the rollers wear quickly, so the bed is made level before fitting and the rail is cleared at each visit before the rollers are inspected.

Questions about sliding vehicle gates in Coventry

Must the rail run be level?

Yes. The bed is brought level before the leaf goes up, and the fall across the run is taken at the survey. A bed that drops or a rail choked with grit makes the leaf stick and wears the rollers out quickly, so the rail is cleared at each visit and the level is rechecked where the ground has moved.

How does the gate open without power?

The motor has a manual release, and staff can move the leaf without power after the handover demo shows the site team the release, so the gate opens and shuts with no power. The release is tried at handover and the site team is shown how to use it.

Can a sliding gate carry a hostile vehicle mitigation rating?

It can where leaf, posts and foundation are tested together to ISO 22343-1:2023, and the rating is written in the specification before the order is placed. The classes that apply appear on the vehicle impact ratings page.

Does a gate at the arena need a Martyn’s Law check?

A venue with room for 800 people or more comes under the enhanced tier of Martyn’s Law, so the rating and the entry plan need to match that level. The Martyn’s Law page gives the two tiers, with the standard tier covering premises that hold from 200 to 799 people.

Write to [email protected] as the first step, and tell us the opening width, how the ground slopes and the vehicle types; we send a reply inside one working day naming the leaf, the motor and the cost for the entrance.

Get a free quote

Ready to specify your project?

Free assessment, written specification and test evidence. Reply within one working day.