Perimeter and HVM · PAS 68 and IWA 14-1
Sliding Vehicle Gates in Manchester
Sliding vehicle gates for Manchester yards, depots and car parks, with LPS 1175 and impact ratings, automation, safety devices and a written specification.
- ✓Third-party test evidence with every product
- ✓Written specification you can issue to tender
- ✓Supplied and installed in Manchester
Get a free quote in Manchester
Rating, written specification and budget range within one working day.
Confidential. No cost, no obligation.
Third-party tested
Evidence with every quote
UK manufactured
Made to your sizes
One accountable team
Specify, supply, install
Confidential handling
Details never shared
Supplied and installed in Manchester
What we supply in Manchester
A sliding leaf shuts a wide entrance while staying clear of the road. It travels back beside the fence on a track, or hangs from a frame with no track at all, so a Trafford Park yard, a depot by Manchester Airport or a car park off Deansgate can hold a wide opening for lorries and still lock it at night.
Manchester holds plenty of wide entrances. Yards and depots move lorries through the day, business parks at MediaCityUK move cars and vans, and the canals and older quarters hold boundaries where a swinging leaf would block pavement or road. A sliding leaf leaves the road open while it moves, and the entrance keeps serving the traffic it was built for.
Three things decide whether the gate works: the rating behind it, the ground under it and the safety gear on it. Fix the forced entry class, the impact class where a vehicle could strike, the motor and the safety devices in one specification before groundwork starts, and the gate opens on its first day and keeps opening for years.
Manchester places that fit a sliding vehicle gate
Trafford Park yards take the hardest daily use. Lorries pass all day, and leaf, track and foundation must take that traffic without sagging or jamming. A tracked gate fits a flat yard with a clear run. Where grit and water would clog a track, a cantilever gate fits better, hanging from a frame with no ground track. The Manchester area page maps how those yards sit beside housing and offices across the city.
Depots by Manchester Airport and business parks at MediaCityUK work to timetables. A gate that opens for deliveries at fixed times and stays shut outside them needs a motor matched to the daily cycles, and a separate pedestrian gate keeps staff clear of the moving leaf. The warehouse gates page takes a yard gate, its fence line and its loading bays in one view.
Hospitals and universities add people to the plan. A gate at Manchester Royal Infirmary must leave its ambulance route open day and night, and a gate at the University of Manchester must open for students and staff and shut against anyone else. The hospital gates page takes a hospital entrance beside its ambulance routes, and the healthcare page takes gates inside a hospital boundary.
Ratings behind a sliding gate in Manchester
The schedule adds LPS 1175 Issue 8.2 (September 2024) into the gate specification, and SR2, class B3, is the class quoted for the gate. SR1, class A1, sits at the bottom of the scale; SR3, class C5, and SR4, class D10, sit above SR2, each fixed by the tools used and the minutes the gate must hold. The class applies to leaf, posts and foundation together, not to the leaf alone. The full set of classes is on the LPS 1175 page. The gates and grilles guide takes each class onto leaf, posts and lock.
For impact, the current test is ISO 22343-1:2023. PAS 68:2013 left the list in October 2023, and IWA 14-1 was replaced by the same standard, so a new gate is quoted against ISO 22343-1:2023 and not against a withdrawn test. Where forced entry resistance is needed too, the proof should hold for both standards. The vehicle impact page has each class, and the anti-ram gates page takes a rated gate with security bollards on the same boundary.
Safety gear is the third check on a powered gate. The leaf must halt the moment it meets an obstruction, and a hand release must let staff open it when power fails, with installer and site owner sharing the duty to fit both. A gate at a venue holding 800 people or more sits in the enhanced tier under Martyn’s Law, and the rating and the entry plan should match that. The gate automation page takes motor, controls and safety devices as one set, and the Martyn’s Law page has the two tiers.
Quoting a sliding gate in Manchester
Begin with the entrance and its traffic. Note the clear width first, then how far back the leaf must travel and how the ground falls across the entrance, and count the vehicles passing each day. A yard taking lorries all day calls for a stouter leaf and a firmer base than a car park taking cars at fixed times.
Then fix leaf, posts and foundation in one decision. The three hold the rating together, and a heavy leaf on light posts will not hold the class the order quotes. The ground fixes the form: a tracked gate wants a level run, a cantilever gate wants a firm foundation, and grit and water filling a track rules out the tracked form. The sliding gates range takes the form that fits a long boundary, and the crash rated fences page takes the fence line beside the gate.
Then fix motor, safety gear and budget in one decision. The motor must match the weight of the leaf and how often it moves each day, the safety devices must cut the drive the instant the leaf meets an obstruction, and a manual release must cover a power cut. The cost factors page takes what fixes the price, and the powered safety duties page takes the duties that apply beside the automation.
| Place in Manchester | Gate type | Class to ask for | How it runs |
|---|---|---|---|
| Trafford Park yard | Tracked sliding gate | SR2 and ISO 22343-1 | Powered, high cycle |
| Airport depot | Cantilever sliding gate | SR2 and ISO 22343-1 | Powered, timed |
| Hospital ambulance route | Tracked sliding gate | SR2 | Powered, always clear |
| MediaCityUK car park | Tracked sliding gate | SR2 | Powered, access control |
| University service entrance | Cantilever sliding gate | SR2 | Powered, timed |
From first visit to a working gate in Manchester
The first visit looks at the entrance itself, one gate position at a time. The surveyor measures width, travel and levels, and checks the power feed, the ground under the gate and the fence it must meet. Pictures and a measured drawing of each entrance anchor the written brief.
The written record then fixes rating and form for each entrance, with leaf, posts and foundation first, then the SR class or impact class, then the drive unit, the protection gear and the daily cycle count. Its evidence file travels with the rated gate, and the brief is checked against the survey before groundwork starts.
Fitting is timed around yard hours and delivery times where the programme allows. Send the entrance widths and the rating for each gate to [email protected]. The specification, a rating already checked and a budget range come back inside a single working day.
Sort the power supply before the gate is ordered. A motor waiting for a cable and a safety device waiting for a feed will hold the whole job back.
Sliding vehicle gates in Manchester: questions we hear
Tracked or cantilever for a Trafford Park yard?
The ground decides. A level yard with a clear run fits a tracked gate, while a yard where grit, water or ice would block a track fits a cantilever gate, which hangs clear of the ground. The survey fixes the choice before the order is placed.
What happens when the power fails on a powered gate?
The hand release takes over. Each powered gate should hold a release that lets staff open the leaf by hand, and the release is tested at handover so the team on site knows how it works. The gate automation page takes the release beside the motor and the controls.
Does a Manchester venue gate need a Martyn’s Law plan?
A venue holding 800 people or more sits in the enhanced tier, and its gate and entry plan should match the measures that tier asks for. Smaller venues sit in the standard tier, where the duties are lighter but still written down.
What care does a fitted gate need?
A visit under contract checks the leaf, the track or cantilever frame, the drive and the protection gear, and worn parts are swapped out before they give way. A contract states what each visit holds, as the maintenance scope page takes it, and the maintenance service handles the visits.
A sliding vehicle gate ahead for a Manchester site? Tell us the entrance width, the run back and the rating, and the reply holds a specification and a budget range.
Other areas
Sliding vehicle gates in other areas
Ready to specify your project?
Free assessment, written specification and test evidence. Reply within one working day.