Blast · ISO 16933 EXV45 to EXV10
Blast resistant glass in Sheffield
Blast resistant glass for Sheffield hospitals, universities, stations and arenas, laminated to the blast class, specified and priced in writing.
- ✓Third-party test evidence with every product
- ✓Written specification you can issue to tender
- ✓Supplied and installed in Sheffield
Get a free quote in Sheffield
Rating, written specification and budget range within one working day.
Confidential. No cost, no obligation.
Third-party tested
Evidence with every quote
UK manufactured
Made to your sizes
One accountable team
Specify, supply, install
Confidential handling
Details never shared
Supplied and installed in Sheffield
What we supply in Sheffield
Blast resistant glass in Sheffield puts a laminated pane between people and a blast wave, and the pane must stay in its frame while the interlayer holds the broken glass together. Hospitals, universities, the station and the arenas each ask for the same result in a different place: a pane that stays put, a frame that stays put with it, and fixings that tie both back to the wall.
The pane is a stack of glass layers with a plastic interlayer between them. The blast wave bends the pane, the glass cracks and spreads the load, and the interlayer stretches and keeps the pieces in one sheet instead of letting them scatter. The frame and the fixings count as much as the glass, because a pane that leaves its frame has failed even when the glass itself held.
The guide to physical security in Sheffield gives the city picture, and the page for security doors in Sheffield gives the solid leaves next to glazed screens and entrances. The hospital security doors guide deals with the doors at the Royal Hallamshire Hospital. Doors at the Northern General Hospital sit in the same guide, and the same guide takes the doors at Sheffield Children’s Hospital. The university security doors guide takes the doors at Sheffield Hallam University. Doors at the University of Sheffield sit in the same guide.
How a laminated pane answers a blast
A blast loads the pane in a fraction of a second, far faster than wind or a person leaning on the glass. The pane bends, the outer layers crack, and the interlayer takes the stretch while the inner layer holds the sheet together. What matters after the wave passes is that the pane is still in the frame and the glass is still in one sheet, with no shards thrown into the room behind it.
The blast ratings page lists the classes, and the blast doors guide compares glazed and solid leaves for the same opening. The window cost and specification guide for blast glass covers the full window set, frame and fixings together. Judge a glazed opening that way: pane, frame and wall fixings as one set.
Forced entry classes beside the blast rating
The glazing schedule governs LPS 1175 Issue 8.2 (September 2024) scoring each opening by its class, and SR3 in that issue is class C5 with a 5 minute resistance time. A blast pane often needs that forced entry class too, because the same glazed screen faces both a blast wave and a person with hand tools. The forced entry classes page runs through the SR classes from SR1 to SR4.
Vehicle threat shapes the perimeter as well as the glazing. The vehicle impact ratings page covers the ISO 22343-1:2023 classes. They took over from PAS 68:2013 on 25 October 2023, when that older standard was withdrawn. Large venues also sit under Martyn’s Law. For what each tier asks for, the Martyn’s Law premises guide is the place to look. A place with 800 or more falls in the enhanced tier. Premises holding 200 to 799 people at one time sit in the standard tier. The rules point to a spring 2027 start.
Where each Sheffield site puts the glass
Every Sheffield site puts the glass somewhere different, and the table names the class usually quoted for each one. Every class in the table comes from the threat assessment for its building, so treat the table as a first steer, then let the threat assessment settle the class.
| Sheffield site | Where the glass goes | Class to quote | Frame and make up |
|---|---|---|---|
| Royal Hallamshire Hospital | Screens at reception and ward entrances | Blast laminated | Steel frame with tested fixings |
| Northern General Hospital | Screens at reception and the emergency department | Blast laminated | Steel frame, fixings to the wall |
| Sheffield Children’s Hospital | Screens at reception and family waiting areas | Blast laminated | Steel frame with tested fixings |
| University of Sheffield | Glazing at entrances and student service counters | Blast laminated | Steel frame, fixings to the wall |
| Sheffield station | Glazing at ticket windows and entrance screens | Blast laminated | Steel frame with tested fixings |
| Utilita Arena Sheffield | Glazing at entrances and hospitality counters | Blast laminated | Steel frame, fixings to the wall |
Frames, fixings and the wall around the pane
The frame carries the pane, and the fixings carry the frame. A steel frame holds a thick laminated pane without bending, and the bead must cover the full edge of the glass, because a pane that slips out of a shallow bead fails the opening even when the glass itself held. The wall around the opening matters too: fixings need solid material to bite into, and a weak reveal lets the whole set move when the wave hits.
The blast resistant doors page deals with the solid leaves that stand beside glazed openings, and the Sheffield window sets page deals with the full window sets for the city. Where one opening needs more than one rating, read the guide that matches forced entry, ballistic and blast ratings.
What the threat assessment decides
The threat assessment fixes the class, the stand off and the streets the glazing faces. A hospital entrance on a busy road needs more from its glazing than a quiet ward window on an upper floor, and an arena entrance that fills with crowds on event nights needs more than a service door at the back of the building. The assessment weighs the building, the people inside it and the streets around it, then names the class the glazing must meet.
Stand off is the distance between the glazing and the nearest point a vehicle can reach, and a longer stand off lets the wave weaken before it reaches the pane. Where the street runs close to the glass, the pane, the frame and the fixings must do more work, and bollards or planters on the forecourt can push the threat further from the building. The vehicle barrier standards guide covers the ratings for those perimeter measures, and the choosing HVM bollards guide covers spacing and foundations.
What happens after you send the drawings
Email [email protected] and quote the sizes and the class you need, with the drawings for each opening. Send the same pack to our Sheffield foundry Saffron Road, Romford, Essex RM5 3ES. Take the sizes to the survey, and we send a written next step with a survey date once we have them.
Stations and arenas bring their own questions. The security requirements for stations and arenas cover the doors and screens at Sheffield station. Doors at Bramall Lane, Hillsborough and Utilita Arena Sheffield sit in the stadium security doors guide, and doors at the Crucible sit in the theatre security doors guide.
Judge the fixings before the pane. A laminated pane can hold together well, yet the opening still fails when the frame pulls away from a weak wall. The wall, the fixings and the frame decide the result as much as the glass.
Questions about blast resistant glass in Sheffield
What does a blast rating tell me about a pane?
It tells how the pane, the frame and the fixings behave when a blast wave hits them. The pane must stay in its frame and hold the broken glass in one sheet, so the rating covers the whole set, not the glass alone.
Does a blast pane also stop forced entry?
It does, provided the pane also holds an SR class. The blast rating measures the pane against a wave, while the SR class rates it against hand tools worked for a set time. Put both classes in the specification when the opening needs both.
Can the glass be replaced after a blast?
A pane that has faced a blast is replaced, because the interlayer has stretched and the glass has cracked, even when the sheet stayed in the frame. The frame and fixings are checked at the same time, and any part that moved is replaced with it.
How long does a set of blast screens take?
Days go to the survey and the written specification, and the lead time after that turns on the pane make up and the frame work. A single screen can be ready a day after the glass arrives. A full set across a hospital or an arena needs more time.
Blast resistant glass in Sheffield
Get a free quote once you have the opening sizes and the class for each opening.
Other areas
Blast resistant glass in other areas
Ready to specify your project?
Free assessment, written specification and test evidence. Reply within one working day.