Services
Design in Birmingham
Physical security design in Birmingham for doors, glazing and barriers, from survey and ratings to drawings, specification and install for Birmingham sites.
- ✓Third-party test evidence with every product
- ✓Written specification you can issue to tender
- ✓Supplied and installed in Birmingham
Get a free quote in Birmingham
Rating, written specification and budget range within one working day.
Confidential. No cost, no obligation.
Third-party tested
Evidence with every quote
UK manufactured
Made to your sizes
One accountable team
Specify, supply, install
Confidential handling
Details never shared
Supplied and installed in Birmingham
What we supply in Birmingham
A buyer in Birmingham who needs a physical security package designed starts with what the building must do, because a shop, a school and a data centre each ask for a different mix of doors, glazing and barriers. Design in Birmingham covers the survey, the drawings and the written specification that turn a risk into an order. The design is only finished when every opening has a rating beside it and every rating has a test behind it.
Around New Street and the Bullring, shops and offices hold entrances that must stay open to the public and still hold against attack. The Jewellery Quarter holds small workshops where stock sits behind glazed counters. Digbeth holds converted warehouses where a new entrance must fit an old wall. In each place the design must fit the building as it stands, not the building as drawn.
A survey of the site opens the job, covering the entrances, the glazing, the perimeter and the movement of people through the building. The specification that follows that visit names the rating beside each opening, and the order for Design in Birmingham is placed from that document. Doors, glazing, gates and barriers in the same city are gathered on the physical security in Birmingham page.
What a design package holds
A design package holds five parts: the survey notes, the operational requirement, the drawings, the written specification and the programme. The survey notes record each opening as it stands, with its size, its frame and the wall around it. The operational requirement states what each entrance must do through the working day, and the guide to writing an operational requirement lays out how that document is put together. The drawings then show each opening in plan and in section, so a builder can price the work from the same lines the client approved.
The written specification names the rating beside each opening, with the test behind it, and the guide to specifying security doors lays out how a door is turned from a grade into an order. The programme sets the order of the work, with the survey first and the handover last, and the programming guide for a security door and barrier package lays out how doors and barriers are sequenced on one site. A package that holds all five parts leaves nothing to guess at on site.
Design also covers the way the parts work together, and the guide to layered security shows how deterrence, detection, delay and response are set out as one system. A door that holds for ten minutes is of little use where the alarm takes longer than that to raise, so the design sets the door grade, the detection and the response side by side. The design is checked against the building as it stands, and any opening that cannot take the rated product is flagged in the drawings before an order is placed.
Ratings written into the design
Good design destroys LPS 1175 Issue 8.2 (September 2024) destroying guesswork, and every opening in the package carries a grade from A1 to H20. The grade is written beside each opening in the specification, with the test report named beside it, and the ten-step LPS 1175 door guide gives a supplier a grade to price from.
From A1 to H20 the grades run, and the minutes climb with the tool set: A1 and SR1 take one minute, B3 and SR2 take three, C5 and SR3 take five, and D10 and SR4 take ten. A heavier tool set earns a longer time, and only a test proves the grade, not the look of the leaf. Where a door must also hold back fire, it takes a class of E, EW or EI. Times run from 30 to 120 minutes. The bands are on the fire ratings page. The standard behind the class is written in the specification: BS EN 1634-1:2014+A1:2018.
Vehicles at the entrance are a risk of their own. PAS 68:2013 was withdrawn, with the date set at 25 October 2023. ISO 22343-1:2023 is where the vehicle impact test sits now. The guide for HVM standards gives the current position. The Security Industry Authority is in charge of the scheme, with the start coming in the spring of 2027. The Martyn’s Law guide to standard tier procedures lays out what a standard tier site must do, and the tier detail is in the Martyn’s Law standard page. Standard tier premises run from 200 people up to 799. Premises of 800 or more come under the enhanced tier.
Birmingham buildings and the design each one needs
Five Birmingham buildings appear in the table, each with its design focus and the notes behind the choice. The focus in each row is a starting point for the survey, and the survey may change it where the building holds more people or more stock than the row assumes.
| Birmingham building | Design focus | Notes |
|---|---|---|
| Shop entrance in the city centre | Glazed entrance with a rated frame | Shoppers pass in and out all day while the entrance holds |
| Workshop in the Jewellery Quarter | Glazed counter with a locked rear door | Stock stays on show while the rear of the shop stays shut |
| Studio entrance in Digbeth | New entrance fitted to an old wall | The design works around the wall as it stands |
| School entrance in Edgbaston | Controlled entry with a rated door | Pupils and visitors are held at the entrance until checked |
| Office reception in Sutton Coldfield | Screened reception with a barrier line | Reception staff see each visitor through the screen before entry is given |
The table shows how the design follows the use of the building, and a school entrance asks for more control than a shop entrance. For the doors in the same city, security doors in Birmingham cover the entrances the design names, and for the street outside, hostile vehicle mitigation in Birmingham covers the barriers that guard the frontage. The guide to security doors in the West Midlands sets out the same work across the wider region.
From survey to install
The job moves from survey to rating to written specification to supply to install. The site is walked on the survey, with each opening measured and the footfall through the building noted down at the time. From the risk the site faces, the rating is set next, and the specification lists the product, the grade and the test report for each opening. Where planning consent or a listed building check is needed, the design stage flags it, and the guide that covers planning permission for shutters, gates and bollards lays out where consent is needed, while the guide to CDM 2015 duties lists the duties that fall on each party.
Lead times are set out in the programme, and the guide that covers lead times and programme risks lays out where a rated door can slip a schedule. Handover is planned from the start, and the installation handover guide and the guide that covers the O and M manual, commissioning and handover show what is handed over at the end. The guide to acceptance and snagging shows how the finished work is checked. A written answer to the first enquiry comes back in a working day.
Email [email protected] after estimating the number of openings with your team, and the reply sets out the Birmingham scope and the next step.
Post the site drawings and the brief to the clean Saffron Road, Romford, Essex RM5 3ES. Enquire first about the survey date, and the visit can be set there and then.
Before ordering, put the grade, the fire class and the test report for every opening in writing. Check each one against the building once fitted.
Birmingham buyers ask about design
What does a design package cover?
It covers the survey notes, the operational requirement, the drawings, the written specification and the programme. Each opening is measured on the survey, given a rating in the specification and shown in the drawings, so the work can be priced and built from the same documents.
Can design fit an existing Birmingham building?
Most openings can take it. The survey records each opening as it stands, and the design works around the walls, the frames and the people moving through the building. An opening that cannot take the rated product is flagged in the drawings before an order is placed.
Does design cover the Martyn’s Law tiers?
Yes. Premises from 200 people up to 799 are in the standard tier. From 800 upwards, the enhanced tier applies. The scheme’s regulator is the Security Industry Authority, with the start due in spring 2027. The tier is named in the design so the doors, the glazing and the entry control match what the tier asks of the site.
How soon does a written quote for a Birmingham design arrive?
The survey notes the site and the openings, and the specification follows that visit. A written answer comes in one working day.
Plan the security design for your Birmingham building
Send the site drawings with the number of openings. The written quote lists the survey, the drawings and the specification. Get a free quote
Other areas
Design in other areas
Ready to specify your project?
Free assessment, written specification and test evidence. Reply within one working day.