Certified physical security

ArxBridge
Stone building with a discreet navy steel security door in Cambridge

Services

Design in Cambridge

Security design in Cambridge from survey to written specification, for colleges, laboratories, hospitals and station buildings across the city.

  • ✓Third-party test evidence with every product
  • ✓Written specification you can issue to tender
  • ✓Supplied and installed in Cambridge
Prefer to talk?+44 7352 267239

Get a free quote in Cambridge

Rating, written specification and budget range within one working day.

ArxBridge Quote Form

Confidential. No cost, no obligation.

Third-party tested

Evidence with every quote

UK manufactured

Made to your sizes

One accountable team

Specify, supply, install

Confidential handling

Details never shared

Supplied and installed in Cambridge

What we supply in Cambridge

More on this

A security door or window ordered without a design behind it is a guess, and a guess is a poor way to spend money on a Cambridge college, laboratory or hospital. Our design service for Cambridge turns that guess into a written plan, starting with a survey, then a threat review, then a rating for each opening, then drawings and a specification the order can be placed against. Every step is set down in writing.

The service suits buildings where the openings are not all the same. University of Cambridge colleges mix halls, libraries and accommodation blocks, each with a different use and risk. The laboratories of the Cambridge Biomedical Campus mix benches, gas lines and staff areas behind one frontage. Addenbrooke’s Hospital mixes wards, entrances and service doors that stay in use through the day, and the area round Cambridge railway station mixes offices, shops and flats where people pass at all hours. Our page for physical security in Cambridge sets out the wider city picture, and the design service settles what goes in each opening.

A design starts on site, not on a screen. The survey measures each opening and notes the wall beside it and the use of the room behind it, and the threat review sets down what each opening must stand against. Rating selection follows from those two steps, with a blast, forced entry or fire class picked for each opening and its evidence named. Drawings show each opening to scale, and the written specification sets out glass, frame, fixings and finish in one place. Our how to specify a security door page sets out the choices a buyer faces.

SurveyMeasured openings and wall build-up
Threat reviewWhat each opening must stand against
DrawingsEach opening drawn to scale
SpecificationRating, glass, frame and fixings in writing

What the design service covers in Cambridge

The service runs in five stages. The survey measures every opening, the threat review sets down what each opening must stand against, rating selection picks the class for each opening, drawings show each opening to scale, and the written specification sets out glass, frame, fixings and finish in one place. No order goes out until the specification is agreed. The LPS 1175 door in ten steps page runs through the choices in order, and our security door specification mistakes page lists the errors a written design catches.

A design also settles the order of the work. A college that needs a hall door, a library door and an accommodation block door in one term cannot fit them all at once, so the design names which openings go first and which can wait. A laboratory that must keep running needs the work sequenced round its benches, and a hospital ward needs it sequenced round its beds. Lead times for tested doorsets run long, so the programme is drawn with the order dates in it. Our guide to lead times and programme risks lays out what sets the wait.

Design stages and what each one hands over

The table below sets out the five stages and what each one leaves behind, and each handover is a paper the next stage works from.

Design stage What happens What you receive
Survey Openings measured and walls checked A measured list of every opening
Threat review The risk to each opening is set down A note naming the threat for each opening
Rating selection Blast, forced entry and fire classes picked The class for each opening
Drawings Each opening is drawn to scale A drawing set for workshop and site
Written specification Glass, frame, fixings and finish are set out One specification the order can be placed against
Need this specified for your project?Free rating, written specification and budget range within one working day.
Get a free quote

Rating selection without guesswork

The rating note blocks LPS 1175 Issue 8.2 (September 2024) blocking a class the papers do not back, so each opening carries only the class its evidence proves. The class for a ground floor laboratory window is not copied from the class for a first floor office door. BS EN 1627 gives a second scale, with classes RC1 to RC6, and the design says which scale applies where. Each SR class, with its test time, is listed on our LPS 1175 standard page.

SR2 is the class most Cambridge openings are designed to, and it matches class B3, where the test runs for three minutes. Where the risk is lower, SR1 is enough, and that class matches A1 with a test that lasts one minute. A laboratory store that holds valuable stock is designed a step higher, so SR3 matches C5 and the test asks for five minutes. The highest class the service designs to here is SR4, matching D10, with a test that runs for ten minutes. Each class is named in the specification beside the opening it belongs to.

Drawings and the written specification

Each opening is drawn to scale, with frame, fixings and ironmongery in their places, and the drawing set travels with the order to the workshop and then to the site. The written specification sits beside the drawings, naming the rating, glass, frame, fixings and finish for each opening. A specification that leaves a fixing unnamed will be argued about on site. Our guide to how to write an operational requirement shows how a brief becomes a paper a supplier can price.

Handover is part of the design. The commissioning notes, the test papers and the maintenance notes are listed in the specification, so the owner receives a file that proves what was fitted. Our guide to commissioning, handover and the O and M manual runs through what that file should hold, and our guide to tender evaluation and scoring shows how a buyer weighs designs against each other.

Cambridge buildings the service is built around

The Cambridge Biomedical Campus asks for a design that keeps laboratories running while their doors are changed, with benches and gas lines behind each opening. Addenbrooke’s Hospital asks for a design sequenced round wards, where a door cannot be taken out while the beds beside it are full. Cambridge Science Park asks for a design that treats office frontages as public faces, with reception desks a few steps from the glass. University of Cambridge colleges ask for a design that respects listed frontages, and the area round Cambridge railway station asks for one that covers offices, shops and flats in one set of papers. Our guide to layered security, from deter to respond shows how doors, gates and barriers work as one system.

The new duties ask a venue to set its measures in writing, and a hall that draws 900 falls in the enhanced tier while a hall that draws 400 falls in the standard tier. The Act received assent on 3 April 2025, and the design notes procedures beside the physical measures for that reason. With commencement expected in the spring of 2027, a design written now names the measures the new duties will ask for.

From first visit to handover in Cambridge

The first visit walks round the building with the person who knows it best. The threat review and rating selection follow from that visit, then the drawings and the written specification, and the order is held until the specification has been agreed. On site, each frame is squared up and levelled by the fitting team, and handover brings the file of papers that proves what was fitted. Send the marked plans to the office on the brink Saffron Road, Romford, Essex RM5 3ES. Book promptly and the first visit is fixed in the diary. The diary date is sent back in writing the same day.

Email [email protected] with advice requested about the earliest design stage, and we send the checklist that stage needs. The design note and fee come back in writing on the following working day after we receive the drawings.

One drawing error that costs a week

Check the wall build-up on the drawing before the order is placed. A fixing drawn for solid brick will not hold in a hollow block, and a frame made to the wrong wall goes back to the workshop while the opening waits.

Frequently asked questions

What papers does the design service need before the first visit in Cambridge?

Floor plans and a list of the openings that worry you are enough to start. The survey measures each opening on site, so an old plan is a starting point, and the drawings follow the measurements taken on the day.

Can one design cover a college building and a laboratory block together?

Yes, where the specification names each opening separately. A hall door and a laboratory door take different classes, and the design keeps them apart on paper.

Who signs off the rating for each opening?

The design names the class for each opening and files the test papers beside it. The papers are what prove the rating at handover.

What happens if a wall will not take the fixing the drawing shows?

The fixing is changed to suit the wall and the drawing is redrawn before the order goes to the workshop. The wall is checked at the survey and the fixing is set by what the wall will hold.

Want a written design for a Cambridge building?

Send floor plans and the openings that worry you for a survey, drawings and a specification. Get a free quote

Ready to specify your project?

Free assessment, written specification and test evidence. Reply within one working day.