Services
Design in Leicester
Design in Leicester for security doors, frames and screens, from measured survey and drawings to ratings, access and finish, in one written specification.
- ✓Third-party test evidence with every product
- ✓Written specification you can issue to tender
- ✓Supplied and installed in Leicester
Get a free quote in Leicester
Rating, written specification and budget range within one working day.
Confidential. No cost, no obligation.
Third-party tested
Evidence with every quote
UK manufactured
Made to your sizes
One accountable team
Specify, supply, install
Confidential handling
Details never shared
Supplied and installed in Leicester
What we supply in Leicester
A Leicester brief for design starts with the rooms, not the catalogue. Each opening gets a leaf, a frame, glazing and hardware named against the way the room is used, and the drawing that follows carries those names with the sizes and the rating, so a ward doorset, a lecture room screen and a shop front shutter are each built from the same kind of record, yet none of them shares the same sizes.
Leicester gives that record plenty of range. The Cathedral and the King Richard III Visitor Centre sit near the centre, De Montfort University spreads lecture rooms, laboratories and student halls across the city, the University of Leicester does the same from its campus to the south, and the King Power Stadium, Curve and De Montfort Hall move crowds through entrances that open and shut all day. Leicester Royal Infirmary, Highcross Leicester and Leicester station add wards, shops and concourses to the same list, while the National Space Centre and Leicester Market add a visitor attraction and a trading hall with their own opening patterns.
What a Leicester brief asks the drawing to name
The survey walks each opening in turn and records the width and height at three points, the make-up of the wall, the floor level and any pipe or cable that crosses the opening. The surveyor also notes the traffic through the room, since a leaf on a hall entrance needs different fittings from a leaf guarding a plant room, and a glazed screen facing a public concourse needs different glass from a screen facing a yard. Those notes fix the brief before a line is drawn.
From those notes the drawing names leaf and frame, glazing, hardware spots and finish for every opening. Security doors lists the leaves and frames the drawing can call on, and the powder coating page describes the coating that shields the steel once the welds are dressed. Where the building sits in old streets by the centre, extra care is set out in the listed building fire doors guide. Fire rated steel doors in Leicester covers the steel leaf case for the city.
How a Leicester drawing moves from brief to build
Five stages carry a Leicester drawing from first visit to workshop order, and each stage signs off the one before it. The brief lists the rooms and the risk attached to each one, the survey records the true sizes, and the drawing turns them into leaf and frame, a review reads the drawing back against the brief, and a revision repairs whatever the check finds before the order goes to manufacture. The specifying security doors guide lists the tests every drawing must clear before it leaves the office, the ten-step LPS 1175 guide shows how the rating is chosen for each opening, and the specification mistakes guide names the errors found most often on drawings.
The written specification goes out from the office near the canteen Saffron Road, Romford, Essex RM5 3ES. Bring today any marked-up plans and the list of rooms, and the drawing team will walk each opening with you before the sizes are fixed. A Leicester client who wants the brief in writing first can use the operational requirement guide, which sets out the questions the drawing must answer before any size is fixed.
Ratings and access figures written into the Leicester specification
The drawing erects LPS 1175 Issue 8.2 (September 2024) erecting the SR scale beside each opening, with SR1 giving tool set A1 a 1 minute hold, SR2 giving tool set B3 a 3 minute hold, SR3 giving tool set C5 a 5 minute hold and SR4 giving tool set D10 a 10 minute hold. Leaf, frame and lock are judged as one assembly against the named rating. The LPS 1175 standard page lists every grade in the scale, and the LPS 1270 glazing classes sit under Issue 1.1 (2014) for any vision panel set into the leaf.
Access is drawn on the same sheet as the rating. Each door on a public route has its clear width and opening force noted in writing, the handles sit at a height every user can reach, and the closer lets the leaf shut firmly yet open with a gentle push. Figures for opening force and clear width are covered in full in the Approved Document M access guide, and physical security in Leicester gives the wider picture for the city.
| Item | What the drawing records | Grade or note |
|---|---|---|
| Entrance doorset | Leaf, frame and lock treated as one assembly | SR1 to SR4 |
| Vision panel | Glazing class set to match the leaf | LPS 1270 Issue 1.1 |
| Screen or partition | Glazing and frame judged together | LPS 1270 Issue 1.1 |
| Crowd entrance | Escape width named beside the rating | Named on drawing |
Treat the smallest reading as the size. A leaf cut to the largest reading will bind in a frame that narrows at the sill, so the survey takes three readings at each opening and the drawing works from the smallest, with the gaps checked again once the coating is on.
Where Leicester buildings ask for design before build
Teaching rooms and halls of residence put a design through its paces, since doors there open and shut hundreds of times a day and must keep their rating after that daily use. Hospital corridors ask for leaves wide enough to clear trolleys and beds, and the drawing names the clear width for each opening on the ward. Workshops and yards on the edge of the city ask for shutters and gates that cope with vehicle traffic and hold the boundary closed outside working hours.
Shops in the centre ask for shutters that drop at night and lift cleanly each morning, with the locking and the finish named on the drawing. The station, the stadium and the concert hall ask for gates and doors that keep crowds moving with the exits clear, and the drawing names the escape widths beside the security rating. The priorities change from one building to the next, and the drawing follows them opening by opening, matching rating, hardware and finish to the room behind each door.
Venues that hold large crowds also weigh the Martyn’s Law tiers in the brief. The standard tier takes in premises that may hold from 200 people up to 799, the enhanced tier takes in premises that may hold 800 people or more, and the law is expected in spring 2027, so a design for a stadium, a hall or a large shop can name the tier the building falls in and let the doors, the glazing and the escape routes answer it together.
Questions about design in Leicester
Can design cover a single door in Leicester?
Yes. One opening on its own is surveyed, drawn and rated just as a full floor would be: the survey records its sizes at three points, the rating is picked from the risk of that room, and the drawing is checked over against the brief before the order is placed. The specification stays short, yet it still names the leaf, the frame, the hardware and the finish.
What does the survey have to record before design starts?
The drawing is built from the opening width and height at three points, the make-up of the wall, the floor level, the hardware positions and any service that crosses the opening. The daily use of the room is recorded as well, because a leaf that serves a crowd needs fittings unlike those on a leaf that serves a stock room.
How is access for every user written into the design?
Each door on a public route has its clear width and opening force written on the drawing, handles sit within reach of every user, and the closer lets the leaf shut firmly without asking for a heavy push. Levers and pulls are picked for hands that grip lightly.
Is the finish named on the drawing as well as the rating?
Yes. Colour and coating are settled while the drawing is still open and recorded in the one specification alongside the rating and the hardware. A sample can be agreed before the full order goes in, so leaf and frame return from the finishers as a matched pair and the work on site is only hanging, testing and touch-up.
Email [email protected], please give the sizes of each opening and how each room is used, and the written reply will set out the specification, the price range and the survey step for Leicester.
Other areas
Design in other areas
Ready to specify your project?
Free assessment, written specification and test evidence. Reply within one working day.