Certified physical security

ArxBridge
ArxBridge installer and architect reviewing plans beside a newly fitted navy steel door

Services

Design in Portsmouth

Design in Portsmouth for security doors, frames and screens, from survey and drawings to ratings, access and finish, in one written specification.

  • ✓Third-party test evidence with every product
  • ✓Written specification you can issue to tender
  • ✓Supplied and installed in Portsmouth
Prefer to talk?+44 7352 267239

Get a free quote in Portsmouth

Rating, written specification and budget range within one working day.

ArxBridge Quote Form

Confidential. No cost, no obligation.

Third-party tested

Evidence with every quote

UK manufactured

Made to your sizes

One accountable team

Specify, supply, install

Confidential handling

Details never shared

Supplied and installed in Portsmouth

What we supply in Portsmouth

More on this

Design in Portsmouth begins with the rooms themselves: how each doorway is used through the day, how wide it must stay, and what level of resistance the brief asks for. From those answers come drawings that settle the leaf, frame, glazing and ironmongery for every opening, so the build follows one settled record instead of a string of site decisions.

The city gives the work a broad range. The naval base and the Historic Dockyard hold working quays and visitor routes side by side, HMS Victory and the Mary Rose Museum bring visitors into old timber and stone, and the Spinnaker Tower and Gunwharf Quays bring tall glazing and busy retail frontages. The University of Portsmouth and Queen Alexandra Hospital add teaching rooms and wards, Portsmouth International Port adds a ferry terminal where footfall peaks with each sailing, and Portsmouth Cathedral, Southsea and Fratton Park add a place of worship, a seafront and a football ground, each with its own pattern of opening and shutting.

Drawing firstDrawings fix size, rating and hardware for each opening before build
Rating namedSR1 to SR4 tied to the risk noted for each opening
Access checkedOpening force and clear width sized to suit the access route
Finish agreedColour and coating settled at drawing stage, not on site

How a Portsmouth opening moves from brief to drawing

A surveyor walks each opening before a line is drawn. Width and height are read at head, middle and sill, the wall build-up is noted, floor levels are compared across the threshold, and any duct, pipe or cable that cuts across the opening is marked on the sketch. The notes also record footfall: a main entrance that stays busy from morning to evening needs hinges, closers and locks of a different order from a plant room door that opens twice a week, and a glazed screen on a public route needs glass of a different class from one that faces a yard.

The drawings that follow set leaf, frame, glazing, hardware positions and finish for every opening in the schedule. Each drawing should come with a hardware schedule that lists every hinge, lock and closer by position. security doors page lists the leaves and frames on offer, and the steel door frames guide covers frame sizes and fixing points, while the powder coating page sets out how the finish shields the steel once welding is done. The transport hub requirements guide covers ferry terminal and station doors, the university doors guide covers teaching blocks, the hospital doors guide covers wards and departments, and the museum doors guide covers visitor routes through older fabric. Portsmouth security doors looks at the leaf and frame case for this same city.

Putting the Portsmouth design together

The sequence runs brief, survey, drawing, check, revision. The brief sets down the rooms and the risk each one carries, the survey supplies true sizes, the drawing converts those sizes into leaf and frame, and a fresh read of the drawing against the brief catches slips before it passes to manufacture. The guide to specifying security doors spells out the checks a drawing must clear, the ten step LPS 1175 door guide walks through picking the rating, and the specification mistakes guide lists the slips drawings make most often.

The Romford branch: Saffron Road, Romford, Essex RM5 3ES. The operational requirement guide helps a Portsmouth client put the brief in writing for the drawing to answer, so rating, hardware and finish all answer a single written brief.

Need this specified for your project?Free rating, written specification and budget range within one working day.
Get a free quote

Ratings and access figures named on the drawing

The specification acknowledges LPS 1175 Issue 8.2 (September 2024) confirming each rating pairs a named tool set with a named attack time. The scale opens at SR1, one minute against tool set A1, then SR2 at three minutes with B3, SR3 at five minutes with C5, then SR4 at ten minutes against D10, and leaf, frame and lock alike are judged against the rating the order names. Full detail sits on the LPS 1175 page, enclosure ratings under Issue 1.1 (2016) sit on the LPS 2081 page, and glazing ratings under Issue 1.1 (2014) sit on the LPS 1270 page.

The same drawing carries the access figures. BS 8300 and Approved Document M limit the push to under 30 newtons for the opening 30 degrees and under 22.5 newtons for the remainder of the swing, while the clear width is sized for the people who pass through daily. The Approved Document M access guide covers those figures in more depth, and the ports guide covers doors at ferry and harbour sites.

Opening What the drawing checks Rating or figure
Entrance doorset Whole assembly judged as one SR1 to SR4 under LPS 1175
Vision panel Glazing class paired with the leaf rating LPS 1270 Issue 1.1
Enclosure and hatch Full assembly put to the same test LPS 2081 Issue 1.1
Accessible route Push measured through the full swing Under 30 N, then under 22.5 N

A drawing is only as sound as the survey behind it. Readings taken at a single point hide a twist in the opening, so the smallest reading rules the drawing and the gaps are read again once the coating has cured.

Site types a Portsmouth design must answer

Portsmouth asks for design across naval, port, university and hospital buildings, and each sets its own demands. The naval base and the dockyard hold restricted areas, so the design names the rating for each opening and the control points that keep those areas shut. The ferry port needs gates and shutters that move vehicles and foot passengers through in turn, and the design must name the clear widths and the control points alongside the rating.

University buildings see heavy footfall, so the design names hardware that keeps working after constant use. Hospital wards need leaves wide enough for beds, with the fire rating named on the drawing. Retail at Gunwharf Quays needs shutters that drop at closing time and lift again before the shops open. The drawing carries those priorities opening by opening, so no door is specified for a use it was never meant to serve.

Questions about design in Portsmouth

Can design cover a single door in Portsmouth?

Yes, a lone opening gets the same treatment as a full floor: survey, drawing and a named rating, with leaf, frame, hardware and finish written into one short specification. Sizes are read at three points, the rating follows the risk, and the drawing is read back against the brief before the order moves to build.

What must the survey record before drawing starts?

The drawing needs opening width and height read in three spots, the wall build-up, the floor height, the hardware positions and any service that cuts across the opening. Notes on daily use matter as well, since a door that serves a crowd needs fittings of a different order from a door that serves a store.

How is access for every user handled in the design?

Each door on an accessible route carries its clear width and its opening force on the drawing. As BS 8300 and Approved Document M lay down, the push is held under 30 newtons for the opening 30 degrees and under 22.5 newtons for the remainder of the swing. Fittings sit where hands can reach and work them with a loose grip, and the closer is picked so the leaf shuts gently on its own.

Is the finish named beside the rating in the design?

Yes, the finish is settled at the drawing stage and recorded in the same document as the rating and the hardware. A swatch can be agreed before the full order is placed, so leaf and frame return from finishing as one matched set and the site work stays to hanging, testing and touch-up.

Write to [email protected] and send the opening sizes, a photo of each opening and a note on how the room is used, and a written reply arrives inside one working day with a named rating for each opening, a price and a survey date in Portsmouth.

Ready to specify your project?

Free assessment, written specification and test evidence. Reply within one working day.