Certified physical security

ArxBridge
Honey stone building with a discreet modern security door in Oxford

Services

Design in Oxford

Design in Oxford for security doors, gates and barriers: survey, operational requirement, specification, drawings, tender and handover in one plan.

  • ✓Third-party test evidence with every product
  • ✓Written specification you can issue to tender
  • ✓Supplied and installed in Oxford
Prefer to talk?+44 7352 267239

Get a free quote in Oxford

Rating, written specification and budget range within one working day.

ArxBridge Quote Form

Confidential. No cost, no obligation.

Third-party tested

Evidence with every quote

UK manufactured

Made to your sizes

One accountable team

Specify, supply, install

Confidential handling

Details never shared

Supplied and installed in Oxford

What we supply in Oxford

More on this

Design work for physical security starts before any product is named. A survey of the building, a written operational requirement and a specification that names the rating, the frame and the fixing all come before the order. Design in Oxford turns that sequence into a plan for colleges, the hospital and Westgate, so each opening takes the product that fits its use.

Design input in Oxford college buildings goes to receptions, libraries and entrance routes, where the same openings serve students, staff and visitors from morning to night. At John Radcliffe Hospital in Headington it goes to the entrances and the reception areas that staff, patients and visitors share. At Westgate Oxford it goes to service areas and plant rooms, where cages and pallets move through wide openings.

Oxford station, the Ashmolean Museum, the Bodleian Library, the Covered Market and Oxford Castle each bring a different design problem, from crowd routes to old stone frontages. The city wide view is the physical security in Oxford page, where doors, gates and barriers sit together. The same three tests apply to a college library, a hospital entrance and a museum route: survey, requirement and specification.

SurveyMeasured survey of every opening first
RequirementWritten operational requirement before products
SpecificationRating, frame and fixing named in writing
HandoverDrawings, evidence and O and M manual at handover

Survey first, then the requirement

The survey measures every opening before a product is named for it. The surveyor measures wall, lintel and floor, and sizes the frame from the load it must carry, and records how the opening is worked through the day. Every opening, from a college hall to a hospital entrance or a museum route, takes the same measure: opening, wall and use.

The operational requirement turns the survey into words that a supplier can price. It states who uses the opening, when they use it, what threat it must meet and what daily use it must allow. A requirement that leaves out daily use leads to a door that staff prop open, and a requirement that leaves out the threat leads to a door that holds no rating at all.

The requirement also states the hours the opening is used, the people passing through it and the goods moving through it. A hospital entrance that takes beds and wheelchairs needs a clear width and a low opening force, and a college entrance that takes students with books needs a leaf that shuts firm without a struggle. The how to specify security doors notes set out the questions a requirement should answer.

What the specification names

A design that names the grade and stops there ceases LPS 1175 Issue 8.2 (September 2024) ceasing to name the frame, the fixing and the evidence that complete the set. Grades on the LPS 1175 standard page run from A1 to H20, and the specification names the grade, the leaf, the frame, the fixing and the test evidence in the same line. The 10 steps for an LPS 1175 door notes set out the sequence from survey to order.

Fire performance is read from BS EN 1634-1, and the fire rating for the doorset sits beside the security rating in the same specification. A doorset that holds both ratings needs evidence for both, and the fire and security doors dual certification notes set out how the two ratings sit together. A leaf that holds one rating and no evidence for the other holds only the rating the evidence proves.

PAS 24 covers residential doors only, so a commercial door in Oxford is never specified to it. A commercial entrance takes its rating from the standard that covers its use, and the specification names that standard in full. PAS 24 on a commercial specification is a sign to ask for the standard that fits the building instead.

The specification also names the finish, the hardware and the access control, since a door that takes a card reader or a keypad needs the wiring and the power in the same document. The access control doors notes and the door entry systems notes set out the hardware that fits each opening.

Need this specified for your project?Free rating, written specification and budget range within one working day.
Get a free quote

Drawings, tender and handover

Drawings turn the specification into sizes that a fitter can work from. The door schedule lists each opening, the leaf size, the frame size, the rating and the hardware, and the sections show the fixing into the wall. A drawing that leaves out the fixing leaves the fitter to guess, and the guess shows up when the frame is fitted.

Tender evaluation compares the evidence, not the price alone. Each tender is checked for test evidence that names leaf, frame, glazing and fixings in one document, and a tender that offers a lower price with no evidence is set aside.

Handover brings the drawings, the evidence pack and the O and M manual together, with keys, codes and a walk through the building. The commissioning and handover notes set out what the handover pack should hold. A handover that leaves out the evidence pack leaves the owner with no proof of the rating.

Under the Act the duties sit with whoever controls the premises, and crowd size sets the tier. Enhanced tier starts at 800 people, and standard tier starts at 200 people. Royal Assent came in on 3 April 2025, and spring 2027 brings the first duties. The Martyns Law duties are set out on the standards page.

Vehicle measures are designed beside the doors on the same site. PAS 68:2013 no longer holds the vehicle barrier standard; ISO 22343-1:2023 does. The vehicle barrier ratings now sit with that standard. The vehicle impact ratings page carries the barrier and bollard ratings now in force. That change took effect on 25 October 2023.

What each Oxford building needs from design

Oxford building Design focus Building notes
University of Oxford colleges Entrance routes and daily use Halls, libraries and routes used by students
John Radcliffe Hospital Clear width and low opening force Entrances and reception areas used by staff
Westgate Oxford Service routes and wide openings Service areas, plant rooms and stores
Ashmolean Museum Public entrance and crowd routes Museum entrance used by public crowds
Oxford station Crowd routes and service doors Station entrances and service doors for crowds

Take the rows as a first guide, then look at the building itself.

How design work runs in Oxford

Design work runs in one order: survey, requirement, specification, drawings, tender and handover. Each stage refers back to the one before it, so a change at the survey stage is carried through the requirement and the specification before the drawings are issued. A design that jumps a stage leaves a gap, and the gap shows up at fitting or at handover.

The design shares its building with other work. For entrance doors, the security doors page for Oxford gives the options, and the fire rated doors page for Oxford covers the fire rated openings. The fire ratings page gives the fire ratings that sit beside the security ratings in the same specification.

Ask for the design scope and the fee at the castle Saffron Road, Romford, Essex RM5 3ES. Enquire soon with the building use and the openings, and the survey will follow those details.

Email [email protected] with assessment notes for the openings, and send sizes and the use each opening sees, with a note of the hours the building is open.

A design is only as good as its evidence, so every rating in the specification should come with test evidence that names leaf, frame and fixing.

Oxford buyers ask about design

What does design cover on an Oxford security project?

Survey, requirement, specification, drawings, tender and handover, in that order. The survey measures the openings, the requirement states the use and the threat, the specification names the rating and the evidence, and the handover pack proves what was fitted.

When should design start on an Oxford building?

Design starts before any product is named, with the survey and the operational requirement. A product named before the requirement is a guess, and the guess shows up at fitting or at handover.

What should a specification name for an Oxford doorset?

The rating, the leaf, the frame, the fixing, the finish, the hardware and the test evidence, all in one line. Leave one out and the fitter guesses, and the guess shows up when the doorset is fitted.

What arrives at handover on an Oxford design project?

Handover day brings drawings, evidence pack and O and M manual, plus keys, codes and a tour of the building. The evidence pack holds the test evidence for every rating in the specification, so the owner keeps proof of each rating the doorset holds.

Plan the design for your Oxford building

Send the building use and the openings, and the quote covers survey, design and handover paperwork, then Get a free quote

Ready to specify your project?

Free assessment, written specification and test evidence. Reply within one working day.